PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/15/13 EST. NO.06 TIME 09:02 AM R.E. NAME: INORI, DOUGLAS 04-2E5604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 4,941.25 E.W. @ F.A.(+) 121212 N 901100 004 0001 76,323.06 E.W. @ L.S.(+) 013013 N 004010 81,264.31 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 81,264.31 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/15/13 EST. NO.06 TIME 09:02 AM R.E. NAME: INORI, DOUGLAS 04-2E5604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E5604 TIME 09:02 AM ESTIMATE NO. 06 BID OPENING 05/15/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/08/13 R.E. NAME: INORI, DOUGLAS DATE OF THIS ESTIMATE 02/15/13 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 04-SM-101-12.0/13.5 ---------------------------------- WINDSOR FUEL COMPANY IN SAN MATEO COUNTY, IN SAN MATEO P O BOX 1029 FROM 0.10 MILE NORTH OF FASHION PITTSBURG CA 94565 ISLAND BOULEVARD TO 0.10 MILE NORTH OF THIRD AVENUE OVERCROSSING FED. AID NO. N O N E HOT MIX ASPHALT OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 002 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 1.000 1,500 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 125.0000 6,250.00 50.000 6,250 004 STREET SWEEPING LS 15,000.0000 15,000.00 1.000 15,000 005 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 1.000 500 006 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 1.000 15,000 007 TRAFFIC CONTROL SYSTEM LS 644,500.0000 644,500.00 1.000 644,500 008 PORTABLE CHANGEABLE MESSAGE SIGN LS 15,000.0000 15,000.00 1.000 15,000 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.7000 13,160.00 25,441.000 17,808 STRIPE (HAZARDOUS WASTE) 010 NOISE MONITORING LS 2,500.0000 2,500.00 1.000 2,500 011 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 15,150.00 50,334.000 15,100 012 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 2,040.00 856.000 3,424 013 REMOVE PAVEMENT MARKER EA 1.0000 7,720.00 7,202.000 7,202 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.7500 221,250.00 59,000.000 221,250 015 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 016 SHOULDER BACKING TON 60.0000 25,800.00 257.730 15,463 017 CRACK TREATMENT LNMI 2,500.0000 12,500.00 10.000 25,000 018 HOT MIX ASPHALT (TYPE A) TON 150.0000 571,500.00 4,095.040 614,256 019 HOT MIX ASPHALT TON 98.0000 1,274,000.00 11,442.260 1,121,341 (BONDED WEARING COURSE-GAP GRADED) 020 ASPHALTIC EMULSION MEMBRANE TON 700.0000 119,000.00 152.820 106,974 (BONDED WEARING COURSE) 021 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 6.0000 67,800.00 10,620.700 63,724 (PAVING MAT) 022 DATA CORE LS 10,000.0000 10,000.00 1.000 10,000 PROGRAM CAS145 PAGE 2 DATE 02/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E5604 TIME 09:02 AM ESTIMATE NO. 06 BID OPENING 05/15/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/08/13 R.E. NAME: INORI, DOUGLAS DATE OF THIS ESTIMATE 02/15/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TACK COAT TON 800.0000 14,400.00 18.000 14,400 024 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 580.0000 307,400.00 606.700 351,886 025 GRIND EXISTING CONCRETE SQYD 12.0000 30,240.00 2,520.000 30,240 PAVEMENT 026 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 46,800.00 112,658.000 45,063 027 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 4,193.00 6,255.000 4,378 028 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 4,207.00 5,874.000 4,111 (BROKEN 12-3) 029 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 4,840.00 1,211.000 4,844 030 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 9,880.00 4,780.000 9,560 031 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 11,120.00 2,608.000 10,432 032 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,000.0000 2,000.00 1.000 2,000 SYSTEM ELEMENTS DURING CONSTRUCTION 033 REPLACE INDUCTIVE LOOP DETECTOR LS 23,500.0000 23,500.00 0.500 11,750 034 REPLACE VEHICLE SENSOR NODE LS 54,250.0000 54,250.00 1.000 54,250 PROGRAM CAS145 PAGE 3 DATE 02/15/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E5604 TIME 09:02 AM ESTIMATE NO. 06 BID OPENING 05/15/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/08/13 R.E. NAME: INORI, DOUGLAS DATE OF THIS ESTIMATE 02/15/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 3,471,209.88 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 81,264.31 81,264.31 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 81,264.31 3,552,474.19 035 MOBILIZATION LS 170,000.0000 170,000.00 1.000 170,000 ORIGINAL CONTRACT AMOUNT 3,729,500.00 TOTAL WORK COMPLETED 81,264.31 3,722,474.19 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 81,264.31 3,722,474.19 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/16/12 80 07/31/12 07/31/12 02/08/13 104 27 24 0 100% 100% INORI, DOUGLAS RESIDENT ENGINEER PROGRAM CAS145 DATE 02/15/13