PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/13 EST. NO.01 TIME 09:23 AM R.E. NAME: HRISHIKESH KATTI (RISHI) 04-2E7404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/13 EST. NO.01 TIME 09:23 AM R.E. NAME: HRISHIKESH KATTI (RISHI) 04-2E7404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E7404 TIME 09:23 AM ESTIMATE NO. 01 BID OPENING 02/27/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/13 R.E. NAME: HRISHIKESH KATTI (RISHI) DATE OF THIS ESTIMATE 07/25/13 LOCATION RERUN PROGRESS ESTIMATE 04-ALA-580-30.6/30.6 ----------------------- BAY LINE CUTTING CORING, INC IN ALAMEDA AND CONTRA COSTA 1635 4TH STREET COUNTIES AT VARIOUS LOCATIONS BERKELEY, CA 94710 FED. AID NO. N O N E TREAT BRIDGE WITH METHACRYLATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 002 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.700 7,000.00 0.700 7,000 003 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.600 30,000.00 0.600 30,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,400.0000 4,400.00 0.700 3,080.00 0.700 3,080 005 JOB SITE MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 700.0000 700.00 0.750 525.00 0.750 525 007 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 1,300.00 13.000 1,300.00 13.000 1,300 008 TEMPORARY CONCRETE WASHOUT LS 1,000.0000 1,000.00 0.000 0 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 5.0000 15,850.00 3,090.000 15,450.00 3,090.000 15,450 STRIPE (HAZARDOUS WASTE) 010 NOISE MONITORING LS 500.0000 500.00 0.000 0 011 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 3,390.00 6,065.000 3,032.50 6,065.000 3,032 012 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 11.0000 3,300.00 22.000 242.00 22.000 242 013 REMOVE PAVEMENT MARKER EA 1.0000 880.00 745.000 745.00 745.000 745 014 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1200 23,748.60 174,062.000 20,887.44 174,062.000 20,887 015 TREAT BRIDGE DECK SQFT 0.6000 118,743.00 174,062.000 104,437.20 174,062.000 104,437 (F) 016 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 47.0000 103,447.00 2,201.000 103,447.00 2,201.000 103,447 017 AGGREGATE BASE (APPROACH SLAB) CY 200.0000 4,800.00 0.000 0 018 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,000.0000 236,000.00 0.000 0 (TYPE R) 019 PAVING NOTCH EXTENSION CF 70.0000 11,620.00 0.000 0 020 PAINT BRIDGE IDENTIFICATION LS 1,500.0000 1,500.00 0.000 0 021 CLEAN EXPANSION JOINT LF 30.0000 21,480.00 0.000 0 022 PUBLIC SAFETY PLAN LS 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 PROGRAM CAS145 PAGE 2 DATE 07/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E7404 TIME 09:23 AM ESTIMATE NO. 01 BID OPENING 02/27/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/13 R.E. NAME: HRISHIKESH KATTI (RISHI) DATE OF THIS ESTIMATE 07/25/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 JOINT SEAL (MR 1") LF 30.0000 13,860.00 0.000 0 024 JOINT SEAL (MR 1 1/2") LF 70.0000 17,780.00 0.000 0 025 4" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 13,580.00 0.000 0 026 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 2,040.00 0.000 0 027 THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 3,000.00 0.000 0 028 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 1,360.00 0.000 0 (BROKEN 35-13) 029 4" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 640.00 0.000 0 (BROKEN 12-3) 030 PAVEMENT MARKER (NON-REFLECTIVE) EA 5.0000 2,900.00 0.000 0 031 PAVEMENT MARKER (RETROREFLECTIVE) EA 9.0000 2,700.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2E7404 TIME 09:23 AM ESTIMATE NO. 01 BID OPENING 02/27/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/13 R.E. NAME: HRISHIKESH KATTI (RISHI) DATE OF THIS ESTIMATE 07/25/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 293,146.14 293,146.14 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 293,146.14 293,146.14 032 MOBILIZATION LS 38,591.4000 38,591.40 0.950 36,661.83 0.950 36,661 ORIGINAL CONTRACT AMOUNT 713,110.00 TOTAL WORK COMPLETED 329,807.97 329,807.97 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 329,807.97 329,807.97 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/11/13 75 04/25/13 04/25/13 07/20/13 58 2 0 0 46% 77% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU W H Y ... W H Y ... W H HRISHIKESH KATTI (RISHI) RESIDENT ENGINEER PROGRAM CAS145 DATE 07/25/13