PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/22/20 EST. NO. 007 TIME 02:38 PM R.E. NAME: RUZIC, JOHN 04-2G4824 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 -1,701.69 A.C. @ U.P.(-) 062020 N 003001 -1,701.69 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE -1,701.69 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/22/20 EST. NO. 007 TIME 02:38 PM R.E. NAME: RUZIC, JOHN 04-2G4824 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G4824 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 07/30/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/20 R.E. NAME: RUZIC, JOHN DATE OF THIS ESTIMATE 07/22/20 LOCATION PROGRESS ESTIMATE 04-ALA-13-12.1/13.4 ----------------- RAY'S ELECTRIC IN BERKELEY FROM SHATTUCK AVE. TO 411 PENDLETON WAY SUITE B 7TH ST. UPGRADE CURB RAMPS AND OAKLAND CA 94621 SIDEWALKS. FED. AID NO. ACNH-P013(36)E UPGRADE CURB RAMPS AND SIDEWALKS. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,700.0000 1,700.00 0.500 850.00 1.000 1,700 002 CONSTRUCTION AREA SIGNS LS 6,800.0000 6,800.00 0.700 4,760 003 TRAFFIC CONTROL SYSTEM LS 210,000.0000 210,000.00 0.100 21,000.00 0.850 178,500 004 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 10,000.0000 10,000.00 0.050 500.00 0.950 9,500 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 17,000.0000 17,000.00 0.100 1,700.00 0.850 14,450 006 JOB SITE MANAGEMENT LS 20,000.0000 20,000.00 0.100 2,000.00 0.850 17,000 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 0.750 1,500 008 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 3,800.00 16.000 3,200 009 TEMPORARY FIBER ROLL LF 5.0000 1,000.00 0.000 0 010 STREET SWEEPING LS 10,000.0000 10,000.00 0.100 1,000.00 0.850 8,500 011 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 0.050 125.00 0.950 2,375 012 REMOVE YELLOW THERMOPLASTIC PAVEMENT SQFT 3.0000 3,810.00 652.000 1,956.00 652.000 1,956 MARKING (HAZARDOUS WASTE) 013 ROADWAY EXCAVATION CY 280.0000 27,440.00 87.500 24,500 014 LEAN CONCRETE BACKFILL CY 950.0000 3,705.00 3.000 2,850 (F) 015 CLASS 2 AGGREGATE BASE (CY) CY 65.0000 7,150.00 96.500 6,272 016 HOT MIX ASPHALT (TYPE A) TON 200.0000 30,000.00 8.340 1,668.00 158.180 31,636 017 TACK COAT TON 7,000.0000 10,500.00 1.500 10,500 018 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 200.0000 14,200.00 70.900 14,180 019 STRUCTURAL CONCRETE, DRAINAGE INLET CY 4,500.0000 23,400.00 5.200 23,400 (F) 020 12" ALTERNATIVE PIPE CULVERT LF 420.0000 19,740.00 35.000 14,700 021 18" ALTERNATIVE PIPE CULVERT LF 430.0000 15,050.00 35.000 15,050 022 DRAINAGE INLET MARKER EA 200.0000 800.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G4824 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 07/30/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/20 R.E. NAME: RUZIC, JOHN DATE OF THIS ESTIMATE 07/22/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE CULVERT (LF) LF 160.0000 640.00 4.000 640 024 ADJUST INLET EA 1,800.0000 1,800.00 0.000 0 025 ADJUST FRAME AND COVER TO GRADE EA 800.0000 3,200.00 4.000 3,200 026 DETECTABLE WARNING SURFACE SQFT 75.0000 24,000.00 314.400 23,580 027 MINOR CONCRETE (MISCELLANEOUS CY 950.0000 123,500.00 111.100 105,545 CONSTRUCTION) 028 REMOVE CONCRETE CURB (LF) LF 10.0000 4,800.00 417.900 4,179 029 REMOVE CONCRETE CY 525.0000 47,250.00 87.600 45,990 (CURB, GUTTER, AND SIDEWALK) (CY) 030 PRE/POST CONSTRUCTION SURVEYS EA 1,000.0000 15,000.00 0.000 0 031 MISCELLANEOUS IRON AND STEEL LB 4.0000 5,564.00 1,391.000 5,564 (F) 032 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 033 MODIFY SIGNAL AND LIGHTING (CITY LS 219,700.0000 219,700.00 0.265 58,220.50 0.850 186,745 STREET LOCATION 1) 034 MODIFY SIGNAL AND LIGHTING LS 268,400.0000 268,400.00 0.286 76,762.40 0.850 228,140 (CITY STREET LOCATION 2) 035 MODIFY SIGNAL AND LIGHTING LS 239,000.0000 239,000.00 0.301 71,939.00 0.850 203,150 (CITY STREET LOCATION 3) 036 MODIFY SIGNAL AND LIGHTING LS 85,000.0000 85,000.00 0.302 25,670.00 0.850 72,250 (CITY STREET LOCATION 4) 037 REMOVE ROADSIDE SIGN EA 150.0000 1,350.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 038 RELOCATE ROADSIDE SIGN EA 250.0000 5,750.00 0.000 0 (STRAP AND SADDLE BRACKET METHOD) 039 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 1,245.00 0.000 0 (0.063"-UNFRAMED ) FOR RETROREFLECTIVE SHEETING (TYPE XI) 040 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 10.0000 830.00 0.000 0 041 ROADSIDE SIGN - ONE POST EA 400.0000 800.00 0.000 0 042 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 200.0000 2,000.00 0.000 0 METHOD) 043 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 8.0000 48,240.00 3,836.000 30,688.00 3,836.000 30,688 MARKING (ENHANCED WET NIGHT VISIBILITY) 044 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 7,160.00 1,264.000 2,528.00 2,159.000 4,318 PROGRAM CAS145 PAGE 3 DATE 07/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G4824 TIME 02:38 PM ESTIMATE NO. 007 BID OPENING 07/30/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/20 R.E. NAME: RUZIC, JOHN DATE OF THIS ESTIMATE 07/22/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 296,606.90 1,300,518.50 ADJUSTMENT OF COMPENSATION -1,701.69 -1,701.69 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 294,905.21 1,298,816.81 045 MOBILIZATION LS 62,000.0000 62,000.00 1.000 62,000 ORIGINAL CONTRACT AMOUNT 1,607,824.00 TOTAL WORK COMPLETED 294,905.21 1,360,816.81 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 294,905.21 1,360,816.81 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/17/19 140 12/26/19 12/26/19 11/01/20 120 22 0 0 83% 86% PROGRESS IS SATISFACTORY RUZIC, JOHN RESIDENT ENGINEER PROGRAM CAS145 DATE 07/22/20