PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/18/12 EST. NO.01 TIME 05:00 PM R.E. NAME: HINH, MINH 04-2G6304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/18/12 EST. NO.01 TIME 05:00 PM R.E. NAME: HINH, MINH 04-2G6304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/18/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G6304 TIME 05:00 PM ESTIMATE NO. 01 BID OPENING 05/09/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/12 R.E. NAME: HINH, MINH DATE OF THIS ESTIMATE 09/18/12 LOCATION PROGRESS ESTIMATE 04-SM-280-9.6/11.0 ----------------- GRANITE CONSTRUCTION COMPANY IN SAN METEO COUNTY NEAR BELMONT PO BOX 50085 FROM 0.2 MILE NORTH OF RANCHO WATSONVILLE, CA 95077 PULGAS UNDERCROSSING TO 0.3 MILE SOUTH OF ROUTE 280/92 SEPARATION FED. AID NO. ACIM-2801(135)E COLD PLANE PAVEMENT AND PLACE HMA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 5,000.0000 5,000.00 0.000 0.00 002 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 0.750 750.00 PROGRAM 003 TEMPORARY COVER SQYD 1.0000 1,000.00 0.000 0.00 004 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 3,800.00 30.000 6,000.00 30.000 6,000.00 005 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 0.000 0.00 006 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750.00 007 TRAFFIC CONTROL SYSTEM LS 54,500.0000 54,500.00 0.000 0.00 008 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,000.0000 5,000.00 0.000 0.00 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.6000 5,920.00 0.000 0.00 STRIPE (HAZARDOUS WASTE) 010 REMOVE METAL BEAM GUARD RAILING LF 8.0000 13,840.00 0.000 0.00 011 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 5,800.00 0.000 0.00 012 REMOVE PAVEMENT MARKER EA 1.0000 3,210.00 0.000 0.00 013 REMOVE ASPHALT CONCRETE DIKE LF 2.0000 7,960.00 0.000 0.00 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.0000 12,580.00 0.000 0.00 015 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.750 1,875.00 0.750 1,875.00 016 SHOULDER BACKING TON 80.0000 6,400.00 0.000 0.00 017 CRACK TREATMENT LNMI 5,300.0000 5,300.00 0.000 0.00 018 REPLACE ASPHALT CONCRETE SURFACING CY 305.0000 118,950.00 0.000 0.00 019 HOT MIX ASPHALT (TYPE A) TON 90.0000 18,900.00 0.000 0.00 020 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 103.0000 286,340.00 0.000 0.00 021 DATA CORE LS 2,000.0000 2,000.00 0.000 0.00 022 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 3.0000 300.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 09/18/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G6304 TIME 05:00 PM ESTIMATE NO. 01 BID OPENING 05/09/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/12 R.E. NAME: HINH, MINH DATE OF THIS ESTIMATE 09/18/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 3.0000 10,710.00 0.000 0.00 024 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3.0000 960.00 0.000 0.00 025 TACK COAT TON 1.0000 19.00 0.000 0.00 026 METAL BEAM GUARD RAILING (WOOD POST) LF 21.0000 35,700.00 0.000 0.00 027 VEGETATION CONTROL (MINOR CONCRETE) SQYD 70.0000 63,000.00 0.000 0.00 028 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,000.0000 1,000.00 0.000 0.00 029 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,000.0000 3,000.00 0.000 0.00 030 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 3,640.00 0.000 0.00 031 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 636.00 0.000 0.00 032 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 81.00 0.000 0.00 (BROKEN 17-7) 033 4" THEROPLASTIC TRAFFIC STRIPE WHITE LF 0.3000 4,830.00 0.000 0.00 (BROKEN 35-13) 034 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 2,680.00 0.000 0.00 035 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 2,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 09/18/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G6304 TIME 05:00 PM ESTIMATE NO. 01 BID OPENING 05/09/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/12 R.E. NAME: HINH, MINH DATE OF THIS ESTIMATE 09/18/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 12,375.00 12,375.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 12,375.00 12,375.00 ORIGINAL CONTRACT AMOUNT 694,556.00 TOTAL WORK COMPLETED 12,375.00 12,375.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 12,375.00 12,375.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/16/12 45 08/27/12 08/27/12 10/30/12 15 0 0 0 2% 33% PROGRESS IS SATISFACTORY HINH, MINH RESIDENT ENGINEER PROGRAM CAS145 DATE 09/18/12