PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/18/12 EST. NO.04 TIME 05:41 PM R.E. NAME: BALALLO, RAYMUNDO 04-2G6704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/18/12 EST. NO.04 TIME 05:41 PM R.E. NAME: BALALLO, RAYMUNDO 04-2G6704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/18/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G6704 TIME 05:41 PM ESTIMATE NO. 04 BID OPENING 02/22/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/12 R.E. NAME: BALALLO, RAYMUNDO DATE OF THIS ESTIMATE 09/18/12 LOCATION PROGRESS ESTIMATE 04-SM-92-R16.3/ .0 ----------------- SHIMMICK CONSTRUCTION COMPANY IN SAN MATEO COUNTY IN THE CITY OF 8201 EDGEWATER DRIVE, STE 202 FOSTER CITY AT SAN MATEO HAYWARD OAKLAND, CA 94621 BRIDGE BETWEEN OIER 38 AND BENT 286 FED. AID NO. N O N E REPLACE TWO BRIDGE SPANS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 6,000.0000 6,000.00 0.500 3,000.00 002 TEMPORARY SUPPORT LS 40,000.0000 40,000.00 0.950 38,000.00 003 CONSTRUCTION SITE MANAGEMENT LS 7,000.0000 7,000.00 0.180 1,260.00 0.680 4,760.00 004 PREPARE WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 0.750 1,500.00 PROGRAM 005 TURBIDITY CONTROL LS 2,000.0000 2,000.00 0.500 1,000.00 006 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 3,000.0000 3,000.00 0.680 2,040.00 0.680 2,040.00 007 TIME-RELATED OVERHEAD (WDAY) WDAY 1,800.0000 306,000.00 31.000 55,800.00 115.000 207,000.00 008 CONSTRUCTION AREA SIGNS LS 9,000.0000 9,000.00 0.800 7,200.00 009 TRAFFIC CONTROL SYSTEM LS 200,000.0000 200,000.00 0.180 36,000.00 0.300 60,000.00 010 PORTABLE CHANGEABLE MESSAGE SIGN LS 150,000.0000 150,000.00 0.000 0.00 011 REMOVE CONCRETE DECK SURFACE SQFT 60.0000 24,960.00 0.000 0.00 012 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 1.0000 4,700.00 0.000 0.00 013 CLEAN AND PAINT EXISTING BEARING LS 14,000.0000 14,000.00 0.000 0.00 SURFACES 014 BRIDGE REMOVAL (PORTION) LS 280,000.0000 280,000.00 0.215 60,200.00 015 PRESTRESSING, TRANSVERSE LS 45,000.0000 45,000.00 0.150 6,750.00 0.300 13,500.00 016 STRUCTURAL CONCRETE, BRIDGE CY 10,000.0000 70,000.00 0.600 6,000.00 2.875 28,750.00 (F) 017 DRILL AND BOND DOWEL LF 35.0000 1,610.00 0.000 0.00 018 CLEAN EXPANSION JOINT LF 9.0000 1,575.00 0.000 0.00 019 FURNISH PRECAST PRESTRESSED CONCRETE EA 62,000.0000 372,000.00 0.800 49,600.00 (F) SLAB (TYPE A) 020 FURNISH PRECAST PRESTRESSED CONCRETE EA 54,000.0000 324,000.00 3.200 172,800.00 4.000 216,000.00 (F) SLAB (TYPE B) 021 ERECT PRECAST PRESTRESSED CONCRETE SLAB EA 20,000.0000 240,000.00 1.140 22,800.00 (F) 022 REPAIR SPALLED SURFACE AREA SQFT 110.0000 5,610.00 15.000 1,650.00 51.000 5,610.00 PROGRAM CAS145 PAGE 2 DATE 09/18/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G6704 TIME 05:41 PM ESTIMATE NO. 04 BID OPENING 02/22/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/12 R.E. NAME: BALALLO, RAYMUNDO DATE OF THIS ESTIMATE 09/18/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH POLYESTER CONCRETE OVERLAY CF 115.0000 56,695.00 0.000 0.00 024 PLACE POLYESTER CONCRETE OVERLAY SQFT 11.0000 51,700.00 0.000 0.00 (F) 025 CORE CONCRETE (6") LF 120.0000 2,160.00 0.000 0.00 026 CORE CONCRETE (1 1/8") LF 60.0000 2,160.00 0.000 0.00 027 CORE CONCRETE (1 1/2") AND PRESSURE LF 160.0000 10,880.00 0.000 0.00 GROUT HIGH STRENGTH ROD 028 CORE AND PRESSURE GROUT DOWELS LF 90.0000 64,260.00 142.800 12,852.00 714.000 64,260.00 029 CORE CONCRETE (1 5/8") LF 100.0000 7,200.00 72.000 7,200.00 72.000 7,200.00 030 SEISMIC JOINT ASSEMBLY LS 70,000.0000 70,000.00 0.350 24,500.00 0.750 52,500.00 031 BAR REINFORCING STEEL (EPOXY COATED) LB 2.0000 3,680.00 1,380.000 2,760.00 (F) (BRIDGE) 032 MINOR CONCRETE (MISCELLANEOUS CY 4,000.0000 8,000.00 1.150 4,600.00 2.000 8,000.00 (F) CONSTRUCTION) 033 MISCELLANEOUS METAL LB 7.0000 16,100.00 517.500 3,622.50 (F) (RESTRAINER - CABLE TYPE) 034 MISCELLANEOUS METAL (BRIDGE) LB 8.0000 58,080.00 363.000 2,904.00 (F) 035 CHAIN LINK RAILING (TYPE 7 MODIFIED) LF 140.0000 5,740.00 0.000 0.00 (F) 036 CONCRETE BARRIER (TYPE 26 MODIFIED) LF 650.0000 63,050.00 0.000 0.00 (F) 037 4" THERMOPLASTIC TRAFFIC STRIPE LF 11.0000 2,640.00 0.000 0.00 038 4" THERMOPLASTIC TRAFFIC STRIPE LF 6.0000 1,440.00 0.000 0.00 (BROKEN 12-3) 039 PAVEMENT MARKER (NON-REFLECTIVE) EA 7.0000 224.00 0.000 0.00 040 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 240.00 0.000 0.00 041 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 20,000.0000 20,000.00 0.180 3,600.00 0.680 13,600.00 SYSTEM ELEMENTS DURING CONSTRUCTION 042 15 KV 3#1/0 MEDIUM VOLTAGE CABLE LS 60,000.0000 60,000.00 0.000 0.00 043 30-PAIR COMMUNICATION CABLES LS 65,000.0000 65,000.00 0.000 0.00 044 CALL BOX POWER CABLES LS 7,000.0000 7,000.00 0.000 0.00 045 2-PAIR COMMUNICATION CABLES LS 13,000.0000 13,000.00 0.000 0.00 046 2 INCH EMPTY CONDUITS FOR CCTV LS 8,000.0000 8,000.00 0.000 0.00 047 WEATHERPROOF JUNCTION BOXES LS 9,000.0000 9,000.00 0.000 0.00 048 FIBER OPTIC CABLE LS 5,000.0000 5,000.00 0.000 0.00 049 LUMINAIRES AND PHOTOCELL EA 3,000.0000 21,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 09/18/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G6704 TIME 05:41 PM ESTIMATE NO. 04 BID OPENING 02/22/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/12 R.E. NAME: BALALLO, RAYMUNDO DATE OF THIS ESTIMATE 09/18/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 MOTION DETECTOR AND CAMERA LS 4,000.0000 4,000.00 0.300 1,200.00 051 SEISMIC MONITORING SENSOR LS 2,000.0000 2,000.00 0.750 1,500.00 PROGRAM CAS145 PAGE 4 DATE 09/18/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2G6704 TIME 05:41 PM ESTIMATE NO. 04 BID OPENING 02/22/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/12 R.E. NAME: BALALLO, RAYMUNDO DATE OF THIS ESTIMATE 09/18/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 335,052.00 878,506.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 29,324.39 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 335,052.00 907,830.89 052 MOBILIZATION LS 250,000.0000 250,000.00 0.950 237,500.00 ORIGINAL CONTRACT AMOUNT 2,996,704.00 TOTAL WORK COMPLETED 335,052.00 1,145,330.89 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 335,052.00 1,145,330.89 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/04/12 170 05/29/12 05/29/12 11/14/12 115 0 0 0 37% 68% PROGRESS IS SATISFACTORY BALALLO, RAYMUNDO RESIDENT ENGINEER PROGRAM CAS145 DATE 09/18/12