PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/20/16 EST. NO. 004 TIME 03:25 PM R.E. NAME: SINGH, BAHADUR 04-2J0704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 203.91 E.W. @ F.A.(+) 051616 N 0001.0 0002 726.57 051816 N 0002.0 0003 4,818.33 052516 N 0003.0 0004 2,966.43 052416 N 0007.1 0005 4,101.77 052116 N 0005.1 0006 4,667.85 052216 N 0006.1 0007 3,206.78 052616 N 0008.1 0008 2,767.19 052316 N 0009.1 0009 2,966.43 052516 N 0011.1 0010 3,523.03 053116 N 0012.1 0012 271.40 062016 N 0019.0 0014 4,264.76 050816 N 0015.1 004 0001 4,763.69 E.W. @ F.A.(+) 052016 N 0004.0 0003 13,155.25 052216 Y 0006.0 0004 3,433.84 052416 Y 0007.0 0007 5,975.07 060616 N 0010.0 0009 6,818.83 053116 Y 0012.0 0010 6,098.07 060216 N 0013.0 0011 8,510.44 060316 Y 0014.0 0012 15,625.26 052116 Y 0005.2 98,864.90 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 98,864.90 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/20/16 EST. NO. 004 TIME 03:25 PM R.E. NAME: SINGH, BAHADUR 04-2J0704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J0704 TIME 03:25 PM ESTIMATE NO. 004 BID OPENING 12/03/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: SINGH, BAHADUR DATE OF THIS ESTIMATE 07/20/16 LOCATION PROGRESS ESTIMATE 04-ALA-880-2.9/27.3 ----------------- BAY CITIES PAVING & GRADING, IN ALAMEDA COUNTY, IN FREMONT, INC. UNION CITY, HAYWARD, SAN LEANDRO, DAVID NOTT AND OAKLAND, FROM 0.4 MILES SOUTH 1450 CIVIC CT #400 BLDG B OF FREMONT BOULEVARD OVERCROSSING CONCORD CA 94520 TO 0.3 MILES SOUTH OF HIGH STREET FED. AID NO. HSNH-PI ( ) ,880-1 (74)E INSTALL MEDIAN CONCRETE BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,887.5000 2,887.50 1.000 2,887 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,413.0000 5,413.00 0.250 1,353 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,845.0000 1,051,650.00 20.000 36,900.00 66.000 121,770 004 CONSTRUCTION AREA SIGNS LS 20,475.0000 20,475.00 0.200 4,095 005 TRAFFIC CONTROL SYSTEM LS 1,223,500.0000 1,223,500.00 0.035 42,822.50 0.110 134,585 006 TEMPORARY TRAFFIC STRIPE (TAPE) LF 2.1000 88,830.00 2,230.000 4,683.00 5,280.000 11,088 007 CHANNELIZER (SURFACE MOUNTED) (LS) LS 11,235.0000 11,235.00 0.120 1,348 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 34,771.0000 34,771.00 0.035 1,216.99 0.110 3,824 009 TEMPORARY RAILING (TYPE K) (LS) LS 1,824,000.0000 1,824,000.00 0.320 583,680 010 TEMPORARY CRASH CUSHION MODULE (LS) LS 35,280.0000 35,280.00 0.000 0 011 TEMPORARY ALTERNATIVE CRASH CUSHION LS 31,813.0000 31,813.00 0.200 6,362 012 JOB SITE MANAGEMENT LS 73,696.0000 73,696.00 0.035 2,579.36 0.115 8,475 013 PREPARE WATER POLLUTION CONTROL PROGRAM LS 656.2500 656.25 0.600 393 014 TEMPORARY HYDRAULIC MULCH SQYD 1.0900 4,796.00 0.000 0 (BONDED FIBER MATRIX) 015 TEMPORARY DRAINAGE INLET PROTECTION EA 142.0500 42,615.00 23.000 3,267.15 27.000 3,835 016 TEMPORARY FIBER ROLL LF 2.7100 4,878.00 0.000 0 017 TEMPORARY GRAVEL BAG BERM LF 14.7300 1,473.00 0.000 0 018 TEMPORARY SILT FENCE LF 3.3100 5,958.00 1,318.000 4,362.58 1,318.000 4,362 019 TEMPORARY CONSTRUCTION ENTRANCE EA 2,945.0000 14,725.00 0.000 0 020 STREET SWEEPING LS 19,140.0000 19,140.00 0.080 1,531 021 TEMPORARY DEWATERING AND NON-STORM WATER LS 12,079.0000 12,079.00 0.000 0 DISCHARGE CONTROL SYSTEM 022 TEMPORARY CONCRETE WASHOUT LS 15,750.0000 15,750.00 0.120 1,890.00 0.120 1,890 PROGRAM CAS145 PAGE 2 DATE 07/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J0704 TIME 03:25 PM ESTIMATE NO. 004 BID OPENING 12/03/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: SINGH, BAHADUR DATE OF THIS ESTIMATE 07/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY FENCE (TYPE ESA) LF 2.4000 45,120.00 4,384.000 10,521.60 4,384.000 10,521 024 TREATED WOOD WASTE LB 0.2600 2,834.00 0.000 0 025 NOISE MONITORING LS 250.0000 250.00 0.000 0 026 REMOVE GUARDRAIL LF 5.2500 3,412.50 0.000 0 027 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.7900 13,746.00 2,178.000 1,720.62 5,991.000 4,732 028 REMOVE PAVEMENT MARKER EA 1.0500 14,070.00 278.000 291.90 995.000 1,044 029 REMOVE ROADSIDE SIGN EA 105.0000 9,240.00 0.000 0 030 REMOVE SIGN STRUCTURE WALKWAY (EA) EA 3,675.0000 3,675.00 0.000 0 031 REMOVE SIGN STRUCTURE (EA) EA 5,775.0000 51,975.00 1.000 5,775.00 2.000 11,550 032 REMOVE SIGN PANEL AND REMOVABLE SIGN EA 525.0000 525.00 0.000 0 PANEL FRAME 033 REMOVE ASPHALT CONCRETE DIKE LF 32.0000 6,400.00 0.000 0 034 REMOVE CULVERT (LF) LF 92.2500 167,895.00 0.000 0 035 MODIFY INLET TO MANHOLE EA 1,850.0000 1,850.00 0.000 0 036 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 6.6000 30,888.00 0.000 0 037 REMOVE CONCRETE BARRIER LF 23.0000 2,691,000.00 6,779.000 155,917.00 36,979.000 850,517 038 BRIDGE REMOVAL (PORTION), LOCATION A LS 2,608.2000 2,608.20 1.000 2,608 039 BRIDGE REMOVAL (PORTION), LOCATION B LS 3,550.0500 3,550.05 0.000 0 040 BRIDGE REMOVAL (PORTION), LOCATION C LS 5,240.5500 5,240.55 0.000 0 041 BRIDGE REMOVAL (PORTION), LOCATION D LS 3,550.0500 3,550.05 0.000 0 042 BRIDGE REMOVAL (PORTION), LOCATION E LS 5,796.0000 5,796.00 0.000 0 043 BRIDGE REMOVAL (PORTION), LOCATION F LS 5,586.0000 5,586.00 0.000 0 044 BRIDGE REMOVAL (PORTION), LOCATION G LS 6,423.9000 6,423.90 0.000 0 045 BRIDGE REMOVAL (PORTION), LOCATION H LS 2,390.8500 2,390.85 0.000 0 046 BRIDGE REMOVAL (PORTION), LOCATION I LS 4,660.9500 4,660.95 0.000 0 047 BRIDGE REMOVAL (PORTION), LOCATION J LS 2,415.0000 2,415.00 0.000 0 048 BRIDGE REMOVAL (PORTION), LOCATION K LS 2,125.2000 2,125.20 0.000 0 049 BRIDGE REMOVAL (PORTION), LOCATION L LS 1,207.5000 1,207.50 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J0704 TIME 03:25 PM ESTIMATE NO. 004 BID OPENING 12/03/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: SINGH, BAHADUR DATE OF THIS ESTIMATE 07/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 BRIDGE REMOVAL (PORTION), LOCATION M LS 845.2500 845.25 0.000 0 051 DEVELOP WATER SUPPLY LS 22,440.0000 22,440.00 0.035 785.40 0.115 2,580 052 STRUCTURE BACKFILL (SLURRY CEMENT) CY 344.7500 137,900.00 0.000 0 053 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.8600 2,838.00 0.000 0 054 FIBER ROLLS LF 3.6900 4,870.80 0.000 0 055 COMPOST SQFT 0.5500 27,500.00 0.000 0 056 HOT MIX ASPHALT (TYPE A) TON 284.0000 48,280.00 136.720 38,828.48 136.720 38,828 057 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 161.2500 738,525.00 0.000 0 058 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 18.2500 1,368.75 0.000 0 059 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 18.2500 2,372.50 0.000 0 060 TACK COAT TON 1,000.0000 7,000.00 0.000 0 061 24" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 210.0000 787,500.00 408.000 85,680.00 408.000 85,680 (LIGHT FOUNDATION) 062 36" CAST-IN-DRILLED-HOLE CONCRETE LF 2,829.7500 311,272.50 0.000 0 PILE (SIGN FOUNDATION) 063 48" CAST-IN-DRILLED-HOLE CONCRETE LF 2,829.7500 2,773,155.00 0.000 0 PILE (SIGN FOUNDATION) 064 60" CAST-IN-DRILLED-HOLE CONCRETE LF 2,934.7500 5,634,720.00 120.000 352,170.00 235.000 689,666 PILE (SIGN FOUNDATION) 065 MINOR CONCRETE CY 382.5000 72,675.00 0.000 0 066 MINOR CONCRETE (MINOR STRUCTURE) CY 2,353.0000 155,298.00 0.000 0 (F) 067 CONCRETE SURFACE TEXTURE SQFT 11.7600 94,432.80 0.000 0 068 STRUCTURAL STEEL LB 2.8400 257,644.80 0.000 0 (F) 069 FURNISH SIGN STRUCTURE (TRUSS) LB 2.8400 606,737.60 0.000 0 (F) 070 INSTALL SIGN STRUCTURE (TRUSS) LB 0.3700 79,046.80 0.000 0 (F) 071 METAL (BARRIER MOUNTED SIGN) LB 12.6000 158,760.00 0.000 0 072 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 105.0000 5,775.00 0.000 0 METHOD) 073 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 23.0500 6,684.50 0.000 0 074 FURNISH LAMINATED PANEL SIGN SQFT 30.4500 95,004.00 0.000 0 (1"-TYPE A)FOR RETROREFLECTIVE SHEETING (TYPE XI) 075 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 8.5100 23,062.10 0.000 0 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) PROGRAM CAS145 PAGE 4 DATE 07/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J0704 TIME 03:25 PM ESTIMATE NO. 004 BID OPENING 12/03/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: SINGH, BAHADUR DATE OF THIS ESTIMATE 07/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 076 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 6.5900 38,353.80 0.000 0 077 PREPARE AND PAINT CONCRETE SQFT 42.0000 26,460.00 0.000 0 078 PREPARE AND STAIN CONCRETE SQFT 14.8100 118,924.30 0.000 0 079 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 080 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 081 18" ALTERNATIVE PIPE CULVERT LF 177.5000 131,350.00 0.000 0 082 21" ALTERNATIVE PIPE CULVERT LF 180.0000 30,600.00 0.000 0 083 24" ALTERNATIVE PIPE CULVERT LF 191.0000 32,470.00 0.000 0 084 18" ALTERNATIVE SLOTTED PIPE LF 263.7500 26,375.00 0.000 0 085 18" SLOTTED CORRUGATED STEEL PIPE LF 192.5000 177,100.00 0.000 0 (.064" THICK) 086 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 087 MISCELLANEOUS IRON AND STEEL LB 2.7500 35,574.00 0.000 0 (F) 088 CONCRETE BARRIER MARKER EA 31.5000 167,265.00 0.000 0 089 GUARD RAILING DELINEATOR EA 26.2500 1,102.50 0.000 0 090 OBJECT MARKER (TYPE L-1) EA 42.0000 294.00 0.000 0 091 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 26.2500 18,900.00 0.000 0 092 VEGETATION CONTROL (MINOR CONCRETE) SQYD 82.9500 47,281.50 0.000 0 093 CONCRETE BARRIER (TRANSITION) LF 306.6000 10,731.00 35.000 10,731 094 TRANSITION RAILING (TYPE WB-31) EA 4,200.0000 8,400.00 0.000 0 095 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,050.0000 7,350.00 0.000 0 096 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,150.0000 6,300.00 0.000 0 097 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,887.5000 14,437.50 0.000 0 098 CONCRETE BARRIER (TYPE 60C MOD CHP) LF 264.6000 111,132.00 0.000 0 099 CONCRETE BARRIER (TYPE 60G MOD SPECIAL LF 437.8500 232,060.50 0.000 0 SIGN 1) 100 CONCRETE BARRIER (TYPE 60 MOD CHP) LF 406.3500 22,755.60 0.000 0 101 CONCRETE BARRIER (TYPE 60C MOD) LF 383.2500 99,645.00 0.000 0 102 CONCRETE BARRIER (TYPE 60G MOD) LF 282.4500 2,293,494.00 722.410 204,044.70 774.410 218,732 PROGRAM CAS145 PAGE 5 DATE 07/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J0704 TIME 03:25 PM ESTIMATE NO. 004 BID OPENING 12/03/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: SINGH, BAHADUR DATE OF THIS ESTIMATE 07/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 103 CONCRETE BARRIER (TYPE 60P MOD) LF 473.5500 22,730.40 0.000 0 104 CONCRETE BARRIER (TYPE 60) LF 89.2500 122,272.50 0.000 0 105 CONCRETE BARRIER (TYPE 60C) LF 113.4000 138,348.00 0.000 0 106 CONCRETE BARRIER (TYPE 60G) LF 113.4000 8,924,580.00 4,984.000 565,185.60 9,875.000 1,119,825 107 CONCRETE BARRIER (TYPE 60GC) LF 134.4000 1,208,256.00 2,377.000 319,468.80 2,377.000 319,468 108 CONCRETE BARRIER (TYPE 60GE) LF 338.1000 3,056,424.00 656.000 221,793.60 870.000 294,147 109 CONCRETE BARRIER (TYPE 60GE MOD) LF 369.6000 225,456.00 0.000 0 110 CONCRETE BARRIER (TYPE 60G STEEL PLATE LF 595.3500 220,279.50 0.000 0 TRANSITION) 111 CONCRETE BARRIER (TYPE 60GP) LF 241.5000 202,860.00 152.000 36,708.00 176.000 42,504 112 CONCRETE BARRIER (TYPE 60G STEEL PLATE LF 509.2500 809,707.50 0.000 0 CLOSURE) 113 CONCRETE BARRIER (TYPE 60 MOD) LF 290.8500 81,438.00 0.000 0 114 CONCRETE BARRIER (TYPE 60 GCP) LF 362.2500 21,735.00 55.000 19,923.75 55.000 19,923 115 CONCRETE BARRIER (TYPE 60GC MOD) LF 305.5500 391,104.00 0.000 0 116 CONCRETE BARRIER (TYPE 60GE HGBR) LF 675.1500 391,587.00 0.000 0 117 CONCRETE BARRIER (TYPE 60SD MOD) LF 701.4000 32,965.80 0.000 0 118 CONCRETE BARRIER (TYPE 60GA MODIFIED) LF 142.8000 273,462.00 0.000 0 119 CONCRETE BARRIER (TYPE 60GA MODIFIED 2) LF 229.9500 11,497.50 0.000 0 120 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5300 31,429.00 0.000 0 (BROKEN 36-12) 121 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.1500 30,681.00 188.000 592.20 436.000 1,373 122 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.2000 14,826.00 94.000 394.80 221.000 928 123 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,250.0000 5,250.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 124 LIGHTING AND SIGN ILLUMINATION LS 2,100,000.0000 2,100,000.00 0.070 147,000.00 0.100 210,000 125 TOLLING SYSTEM INFRASTRUCTURE LS 2,100,000.0000 2,100,000.00 0.070 147,000.00 0.100 210,000 126 TRAFFIC OPERATIONS SYSTEM LS 1,470,000.0000 1,470,000.00 0.080 117,600.00 0.100 147,000 127 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 128 ABANDON CULVERT (LF) LF 25.3000 8,349.00 0.000 0 129 SAND BACKFILL CY 240.0000 2,400.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 07/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J0704 TIME 03:25 PM ESTIMATE NO. 004 BID OPENING 12/03/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: SINGH, BAHADUR DATE OF THIS ESTIMATE 07/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 130 CONCRETE BACKFILL (PIPE TRENCH) CY 270.0000 16,200.00 0.000 0 (F) 131 CONCRETE BARRIER (TYPE 60G MOD 2) LF 514.5000 298,410.00 0.000 0 132 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 133 BRIDGE REMOVAL (PORTION), LOCATION N LS 1,593.9000 1,593.90 0.000 0 134 BRIDGE REMOVAL (PORTION), LOCATION O LS 4,105.5000 4,105.50 0.000 0 135 BRIDGE REMOVAL (PORTION), LOCATION P LS 2,221.8000 2,221.80 0.000 0 136 30" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 262.5000 15,487.50 0.000 0 (LIGHT FOUNDATION) 137 CONCRETE BARRIER (TYPE 60A MODIFIED) LF 151.2000 25,704.00 0.000 0 PROGRAM CAS145 PAGE 7 DATE 07/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J0704 TIME 03:25 PM ESTIMATE NO. 004 BID OPENING 12/03/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: SINGH, BAHADUR DATE OF THIS ESTIMATE 07/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,529,123.03 5,183,845.30 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 98,864.90 98,864.90 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,627,987.93 5,282,710.20 138 MOBILIZATION LS 4,307,275.0000 4,307,275.00 0.250 1,076,818.75 0.750 3,230,456 ORIGINAL CONTRACT AMOUNT 49,896,755.50 TOTAL WORK COMPLETED 3,704,806.68 8,513,166.45 MATERIALS ON HAND ON SITE 36,106.19 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 3,704,806.68 8,549,272.64 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/29/16 570 04/14/16 04/14/16 10/29/18 67 1 0 0 17% 12% PROGRESS IS SATISFACTORY SINGH, BAHADUR RESIDENT ENGINEER PROGRAM CAS145 DATE 07/20/16