PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/22/20 EST. NO. 003 TIME 09:52 AM R.E. NAME: NGUYEN, HUNG 04-2J7504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/22/20 EST. NO. 003 TIME 09:52 AM R.E. NAME: NGUYEN, HUNG 04-2J7504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J7504 TIME 09:52 AM ESTIMATE NO. 003 BID OPENING 07/03/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: NGUYEN, HUNG DATE OF THIS ESTIMATE 02/22/20 LOCATION RERUN PROGRESS ESTIMATE 04-SCL-280-R2.9/R17.8 ----------------------- DISNEY CONSTRUCTION, INC. IN SANTA CLARA COUNTY IN SAN JOSE 533 AIRPORT BLVD SUITE 120; AND LOS ALTOS HILLS AT BIRD AVENUE BURLINGAME CA 94010 OVERCROSSING AND AT ARASTRADERO ROAD UNDERCROSSING FED. AID NO. N O N E BRIDGE SEISMIC RESTORATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.000 0 002 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.000 0 003 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.050 2,500 004 TEMPORARY TRAFFIC STRIPE (PAINT) LF 5.0000 5,850.00 0.000 0 005 CHANNELIZER (SURFACE MOUNTED) EA 50.0000 2,500.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 25,000.0000 25,000.00 0.000 0 007 TEMPORARY RAILING (TYPE K) LF 20.0000 108,000.00 0.000 0 008 TEMPORARY CRASH CUSHION MODULE EA 300.0000 16,800.00 0.000 0 009 JOB SITE MANAGEMENT LS 50,000.0000 50,000.00 0.000 0 010 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.700 1,050 011 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 6,000.00 0.000 0 012 TEMPORARY REINFORCED SILT FENCE LF 7.0000 2,905.00 0.000 0 013 STREET SWEEPING LS 10,000.0000 10,000.00 0.000 0 014 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 0.000 0 015 ROADWAY EXCAVATION CY 300.0000 51,000.00 0.000 0 016 STRUCTURE EXCAVATION (BRIDGE) CY 300.0000 49,500.00 0.000 0 (F) 017 STRUCTURE BACKFILL (BRIDGE) CY 100.0000 16,400.00 0.000 0 (F) 018 CLASS 2 AGGREGATE BASE (CY) CY 500.0000 7,500.00 0.000 0 019 HOT MIX ASPHALT (TYPE A) TON 230.0000 78,200.00 0.000 0 020 TACK COAT TON 4,000.0000 2,000.00 0.000 0 021 ASPHALT MEMBRANE WATERPROOFING SQFT 14.0000 9,184.00 0.000 0 (F) 022 COLUMN CASING LB 8.5000 555,900.00 11,445.000 97,282.50 13,080.000 111,180 (F) PROGRAM CAS145 PAGE 2 DATE 02/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J7504 TIME 09:52 AM ESTIMATE NO. 003 BID OPENING 07/03/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: NGUYEN, HUNG DATE OF THIS ESTIMATE 02/22/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MINOR CONCRETE (CURB AND GUTTER) CY 1,100.0000 26,400.00 0.000 0 024 MINOR CONCRETE (ISLAND PAVING) CY 550.0000 8,250.00 0.000 0 025 REMOVE CONCRETE ISLAND (PORTIONS) (CY) CY 500.0000 15,000.00 0.000 0 026 REMOVE CONCRETE (CURB AND GUTTER) LF 25.0000 9,500.00 0.000 0 027 REMOVE PAVEMENT MARKER EA 1.0000 19.00 0.000 0 028 PAVEMENT MARKER (RETROREFLECTIVE) EA 75.0000 1,725.00 0.000 0 029 OBJECT MARKER (TYPE K-1) EA 650.0000 650.00 0.000 0 030 CONCRETE BARRIER (TYPE 60MF) LF 500.0000 115,000.00 0.000 0 031 CONCRETE BARRIER TRANSITION LF 200.0000 10,000.00 0.000 0 (F) 032 REMOVE CONCRETE BARRIER LF 200.0000 56,000.00 0.000 0 033 THERMOPLASTIC PAVEMENT MARKING SQFT 150.0000 9,450.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 034 6" THERMOPLASTIC TRAFFIC STRIPE LF 30.0000 56,100.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 035 6" THERMOPLASTIC TRAFFIC STRIPE LF 15.0000 3,000.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 036 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 1,035.00 0.000 0 037 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 630.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 02/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2J7504 TIME 09:52 AM ESTIMATE NO. 003 BID OPENING 07/03/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: NGUYEN, HUNG DATE OF THIS ESTIMATE 02/22/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 97,282.50 114,730.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 9,344.68 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 97,282.50 124,074.68 038 MOBILIZATION LS 149,835.0000 149,835.00 0.500 74,917.50 0.500 74,917 ORIGINAL CONTRACT AMOUNT 1,533,333.00 TOTAL WORK COMPLETED 172,200.00 198,992.18 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 172,200.00 198,992.18 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/23/19 60 11/25/19 11/25/19 09/30/20 0 0 0 0 13% 0% PROGRESS IS SATISFACTORY NGUYEN, HUNG RESIDENT ENGINEER PROGRAM CAS145 DATE 02/22/20