PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/01/06 EST. NO.04 TIME 09:40 AM R.E. NAME: FRED BOOSHEHRI 04-2R5704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/01/06 EST. NO.04 TIME 09:40 AM R.E. NAME: FRED BOOSHEHRI 04-2R5704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/01/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2R5704 TIME 09:40 AM ESTIMATE NO. 04 BID OPENING 04/25/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/27/06 R.E. NAME: FRED BOOSHEHRI DATE OF THIS ESTIMATE 12/01/06 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 04-SM-92-R11.8/R11.8 ---------------------------------- PENHALLCOMPANY IN SAN MATEO COUNTY IN SAN MATEO AT 13750 CATALINA STREET ROUTE 92 AND 101 SEPARATION SAN LEANDRO, CA 94577 FED. AID NO. N O N E REPLACE JOINT SEAL ASSEMBLIES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM 02 WATER POLLUTION CONTROL LS 700.0000 700.00 1.000 700.00 03 TEMPORARY CONCRETE WASHOUT FACILITY LS 1,300.0000 1,300.00 1.000 1,300.00 04 CONSTRUCTION AREA SIGNS LS 6,500.0000 6,500.00 0.300 1,950.00 1.000 6,500.00 05 TRAFFIC CONTROL SYSTEM LS 49,000.0000 49,000.00 1.000 49,000.00 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 4,000.0000 4,000.00 1.000 4,000.00 07 BRIDGE REMOVAL (PORTION) LS 126,000.0000 126,000.00 1.000 126,000.00 08 STRUCTURAL CONCRETE, BRIDGE M3 1,400.0000 42,000.00 30.000 42,000.00 09 JOINT SEAL ASSEMBLY (MR 60 MM) M 800.0000 32,800.00 41.000 32,800.00 S) 10 JOINT SEAL ASSEMBLY (MR 70 MM) M 800.0000 37,600.00 47.000 37,600.00 S) 11 JOINT SEAL ASSEMBLY (MR 80 MM) M 800.0000 25,600.00 32.000 25,600.00 S) 12 JOINT SEAL ASSEMBLY (MR 90 MM) M 800.0000 18,400.00 23.000 18,400.00 S) 13 BAR REINFORCING STEEL (BRIDGE) KG 1.0000 1,827.00 1,827.000 1,827.00 14 100 MM THERMOPLASTIC TRAFFIC STRIPE M 130.0000 1,950.00 0.000 0.00 15 PAVEMENT MARKER (RETROREFLECTIVE) EA 25.0000 800.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 12/01/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2R5704 TIME 09:40 AM ESTIMATE NO. 04 BID OPENING 04/25/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/27/06 R.E. NAME: FRED BOOSHEHRI DATE OF THIS ESTIMATE 12/01/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,950.00 346,727.00 ADJUSTMENT OF COMPENSATION 0.00 -1,350.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,950.00 345,377.00 16 MOBILIZATION LS 24,000.0000 24,000.00 1.000 24,000.00 ORIGINAL CONTRACT AMOUNT 373,477.00 TOTAL WORK COMPLETED 1,950.00 369,377.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,950.00 369,377.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/25/06 60 06/15/06 06/15/06 11/27/06 58 5 0 0 100% 100% FRED BOOSHEHRI RESIDENT ENGINEER PROGRAM CAS145 DATE 12/01/06