PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/15/12 EST. NO.01 TIME 04:29 PM R.E. NAME: COOPER, CHEE 04-2R9904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/15/12 EST. NO.01 TIME 04:29 PM R.E. NAME: COOPER, CHEE 04-2R9904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/15/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2R9904 TIME 04:29 PM ESTIMATE NO. 01 BID OPENING 04/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: COOPER, CHEE DATE OF THIS ESTIMATE 06/15/12 LOCATION PROGRESS ESTIMATE 04-ALA-13-10.0/13.2 ----------------- SYNERGY PROJECT MANAGEMENT INC IN ALAMEDA COUNTY IN BERKELEY 30 GRANT AVENUE, SUITE 300 FROM HILLER DRIVE TO SAN FRANCISCO, CA 94108 SAN PABLO AVENUE FED. AID NO. N O N E COLD PLANE AND PLACE BONDED WEARING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.140 280.00 0.140 280.00 002 PREPARE WATER POLLUTION CONTROL LS 600.0000 600.00 0.750 450.00 0.750 450.00 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 170.0000 8,500.00 35.000 5,950.00 35.000 5,950.00 004 CONSTRUCTION AREA SIGNS LS 50,000.0000 50,000.00 0.350 17,500.00 0.350 17,500.00 005 TRAFFIC CONTROL SYSTEM LS 42,000.0000 42,000.00 0.050 2,100.00 0.050 2,100.00 006 RESET CHANNELIZER EA 90.0000 1,800.00 0.000 0.00 (LANE SEPARATION SYSTEM) 007 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,100.0000 13,200.00 9.000 9,900.00 9.000 9,900.00 008 NOISE MONITORING LS 1,000.0000 1,000.00 0.000 0.00 009 REMOVE PAVEMENT MARKER EA 2.0000 3,140.00 0.000 0.00 010 ADJUST MONUMENT COVER EA 500.0000 1,000.00 0.000 0.00 011 ADJUST UTILITY COVER TO GRADE EA 350.0000 11,550.00 0.000 0.00 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 0.8500 68,935.00 0.000 0.00 013 REPLACE ASPHALT CONCRETE SURFACING CY 225.0000 108,000.00 0.000 0.00 014 HOT MIX ASPHALT TON 112.0000 717,920.00 0.000 0.00 (BONDED WEARING COURSE-GAP GRADED) 015 ASPHALTIC EMULSION MEMBRANE TON 1,200.0000 84,000.00 0.000 0.00 (BONDED WEARING COURSE) 016 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 19,850.00 0.000 0.00 017 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,000.00 0.000 0.00 018 THERMOPLASTIC PAVEMENT MARKING SQFT 3.6500 49,640.00 0.000 0.00 019 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 5,480.00 0.000 0.00 (BROKEN 17-7) 020 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.7500 5,887.50 0.000 0.00 021 LOOP DETECTOR REPLACEMENT LS 17,500.0000 17,500.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/15/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2R9904 TIME 04:29 PM ESTIMATE NO. 01 BID OPENING 04/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: COOPER, CHEE DATE OF THIS ESTIMATE 06/15/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 36,180.00 36,180.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 36,180.00 36,180.00 022 MOBILIZATION LS 60,000.0000 60,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 1,273,002.50 TOTAL WORK COMPLETED 36,180.00 36,180.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 36,180.00 36,180.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/22/12 45 06/08/12 06/08/12 09/10/12 9 0 0 0 3% 20% PROGRESS IS SATISFACTORY COOPER, CHEE RESIDENT ENGINEER PROGRAM CAS145 DATE 06/15/12