PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/06 EST. NO.01 TIME 08:34 AM R.E. NAME: BOUZAR, CYRUS 04-2S4504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/06 EST. NO.01 TIME 08:34 AM R.E. NAME: BOUZAR, CYRUS 04-2S4504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2S4504 TIME 08:34 AM ESTIMATE NO. 01 BID OPENING 10/12/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: BOUZAR, CYRUS DATE OF THIS ESTIMATE 03/22/06 LOCATION PROGRESS ESTIMATE 04-CC-680-R10.2/R10.9 ----------------- SITEWORKS CONSTRUCTION INC IN CONTRA COSTA COUNTY AT ALAMO AT P O BOX 1324 0.3 KM SOUTH AND 0.9 KM NORTH OF LAFAYETTE CA 94549 STONE VALLEY ROAD UNDERCROSSING FED. AID NO. ER-37B1(4)E ,ACIM-680 -1(65)E RECONSTRUCT EMBANKMENT SLOPE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,383.3600 1,383.36 0.000 0.00 PROGRAM 02 WATER POLLUTION CONTROL LS 4,034.8000 4,034.80 0.000 0.00 03 TEMPORARY SILT FENCE M 7.2100 2,884.00 0.000 0.00 04 TEMPORARY COVER M2 8.2300 2,880.50 0.000 0.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 366.8000 2,934.40 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 1,995.3900 1,995.39 0.700 1,396.77 0.700 1,396.77 S) 07 TRAFFIC CONTROL SYSTEM LS 24,486.4900 24,486.49 0.000 0.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,760.6400 1,760.64 0.000 0.00 S) 09 REMOVE CORRUGATED STEEL PIPE M 138.2300 3,317.52 0.000 0.00 10 REMOVE CONCRETE (DITCH) M3 747.7500 1,495.50 0.000 0.00 11 CLEARING AND GRUBBING LS 9,086.9400 9,086.94 0.000 0.00 12 ROADWAY EXCAVATION M3 5.2000 20,072.00 0.000 0.00 13 LEAD COMPLIANCE PLAN LS 1,408.5100 1,408.51 1.000 1,408.51 1.000 1,408.51 14 DITCH EXCAVATION M3 315.7800 1,578.90 0.000 0.00 15 IMPORTED BORROW (GEOSYNTHETIC REINFORCED M3 25.8200 49,574.40 0.000 0.00 EMBANKMENT) 16 GEOSYNTHETIC REINFORCED EMBANKMENT M2 12.5400 50,787.00 0.000 0.00 17 GEOSYNTHETIC REINFORCED MATERIAL M2 4.6500 18,832.50 0.000 0.00 18 EROSION CONTROL (NETTING) M2 14.0800 33,932.80 0.000 0.00 19 FIBER (EROSION CONTROL) KG 1.5200 197.60 0.000 0.00 20 FIBER ROLLS M 16.9700 10,012.30 0.000 0.00 21 COMPOST (EROSION CONTROL) M3 337.4625 539.94 0.000 0.00 22 PURE LIVE SEED (EROSION CONTROL) KG 368.7900 3,687.90 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2S4504 TIME 08:34 AM ESTIMATE NO. 01 BID OPENING 10/12/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: BOUZAR, CYRUS DATE OF THIS ESTIMATE 03/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 STABILIZING EMULSION (EROSION CONTROL) KG 5.7000 159.60 0.000 0.00 24 ASPHALT CONCRETE (TYPE A) TONN 411.7100 2,881.97 0.000 0.00 25 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 30.2800 2,997.72 0.000 0.00 26 MINOR CONCRETE (MINOR STRUCTURE) M3 1,108.0294 3,767.30 0.000 0.00 F) 27 450 MM REINFORCED CONCRETE PIPE M 160.1700 51,254.40 0.000 0.00 28 300 MM BITUMINOUS COATED CORRUGATED M 83.8600 7,128.10 0.000 0.00 STEEL PIPE DOWNDRAIN 29 300 MM ANCHOR ASSEMBLY EA 399.4100 3,994.10 0.000 0.00 30 900 MM CORRUGATED STEEL PIPE INLET M 1,889.3300 5,667.99 0.000 0.00 (3.51 MM THICK) 31 CONCRETE (DITCH LINING) M3 1,613.9200 4,841.76 0.000 0.00 32 MINOR CONCRETE (MISCELLANEOUS M3 7,205.0000 2,882.00 0.000 0.00 CONSTRUCTION) 33 MISCELLANEOUS IRON AND STEEL KG 1.4400 656.64 0.000 0.00 F) PROGRAM CAS145 PAGE 3 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2S4504 TIME 08:34 AM ESTIMATE NO. 01 BID OPENING 10/12/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: BOUZAR, CYRUS DATE OF THIS ESTIMATE 03/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,805.28 2,805.28 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,805.28 2,805.28 34 MOBILIZATION LS 11,528.0000 11,528.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 344,642.97 TOTAL WORK COMPLETED 2,805.28 2,805.28 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 2,805.28 2,805.28 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 011 CLEARING AND GRUBBING 1,000.00 9,086.94 8,086.94 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/15/05 60 03/10/06 12/14/05 07/30/06 1 63 0 0 1% 2% PROGRESS IS SATISFACTORY BOUZAR, CYRUS RESIDENT ENGINEER PROGRAM CAS145 DATE 03/22/06