PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/20/26 EST. NO. 001 TIME 01:05 PM R.E. NAME: PANDHER, PARAMJIT 04-2X7204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/20/26 EST. NO. 001 TIME 01:05 PM R.E. NAME: PANDHER, PARAMJIT 04-2X7204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2X7204 TIME 01:05 PM ESTIMATE NO. 001 BID OPENING 05/14/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: PANDHER, PARAMJIT DATE OF THIS ESTIMATE 10/20/26 LOCATION PROGRESS ESTIMATE 04-ALA-580-R30.8/R41.1 ----------------- FBD VANGUARD CONSTRUCTION, ALAMEDA COUNTY IN AND NEAR SAN LEANDRO AND INC. OAKLAND FROM 0.3 MILE WEST OF CASTRO 550 GREENVILLE ROAD VALLEY BOULEVARD UNDERCROSSING TO COOLIDGE LIVERMORE CA 94550 AVENUE UNDERCROSSING FED. AID NO. N O N E INDIVIDUAL SLAB REPLACEMENT (RSC). ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 35,000.00 20.000 20,000.00 20.000 20,000 002 CONSTRUCTION AREA SIGNS LS 89,000.0000 89,000.00 0.700 62,300.00 0.700 62,300 003 TRAFFIC CONTROL SYSTEM LS 85,000.0000 85,000.00 0.850 72,250.00 0.850 72,250 004 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 400.0000 12,000.00 20.000 8,000.00 20.000 8,000 005 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 350.0000 10,500.00 20.000 7,000.00 20.000 7,000 SYSTEM 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,500.0000 4,500.00 0.750 3,375.00 0.750 3,375 007 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.000 0 008 WATER POLLUTION CONTROL PROGRAM LS 1,300.0000 1,300.00 0.700 910.00 0.700 910 009 STREET SWEEPING LS 3,300.0000 3,300.00 0.850 2,805.00 0.850 2,805 010 TEMPORARY CONCRETE WASHOUT LS 6,000.0000 6,000.00 1.000 6,000.00 1.000 6,000 011 TREATED WOOD WASTE LB 3.0000 4,950.00 0.000 0 012 DRILL AND BOND (DOWEL BAR) EA 25.0000 66,000.00 1,216.000 30,400.00 1,216.000 30,400 013 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 1,045.0000 867,350.00 887.000 926,915.00 887.000 926,915 014 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 3,000.00 0.000 0 015 REMOVE ROADSIDE SIGN EA 145.0000 2,900.00 0.000 0 016 REMOVE ROADSIDE SIGN (STRAP AND SADDLE EA 58.0000 638.00 0.000 0 BRACKET METHOD) 017 REMOVE ROADSIDE SIGN PANEL EA 58.0000 174.00 0.000 0 018 RELOCATE ROADSIDE SIGN-TWO POST EA 675.0000 675.00 0.000 0 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 8,790.00 0.000 0 (0.063"-UNFRAMED) 020 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 8,975.00 0.000 0 (0.080"-UNFRAMED) 021 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 38.0000 1,900.00 0.000 0 (0.063"-FRAMED) 022 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 38.0000 5,966.00 0.000 0 (0.080"-FRAMED) PROGRAM CAS145 PAGE 2 DATE 10/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2X7204 TIME 01:05 PM ESTIMATE NO. 001 BID OPENING 05/14/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: PANDHER, PARAMJIT DATE OF THIS ESTIMATE 10/20/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADSIDE SIGN - ONE POST EA 440.0000 10,120.00 0.000 0 024 ROADSIDE SIGN - TWO POST EA 675.0000 5,400.00 0.000 0 025 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 115.0000 1,840.00 0.000 0 METHOD) 026 INSTALL SIGN OVERLAY SQFT 100.0000 1,700.00 0.000 0 027 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 58.0000 232.00 0.000 0 POST 028 PAINT TRAFFIC STRIPE (2-COAT) LF 10.0000 10,800.00 0.000 0 029 6" THERMOPLASTIC TRAFFIC STRIPE LF 8.2000 7,134.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 030 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 6.5000 27,625.00 0.000 0 (WARRANTY) (BROKEN 36-12) 031 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10,900.0000 10,900.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 10/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2X7204 TIME 01:05 PM ESTIMATE NO. 001 BID OPENING 05/14/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: PANDHER, PARAMJIT DATE OF THIS ESTIMATE 10/20/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 1,139,955.00 1,139,955.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 1,139,955.00 1,139,955.00 ORIGINAL CONTRACT AMOUNT 1,297,669.00 TOTAL WORK COMPLETED 1,139,955.00 1,139,955.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,139,955.00 1,139,955.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/25/26 35 07/10/26 07/10/26 10/19/26 35 34 0 0 84% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU MATERIAL DELAYS PANDHER, PARAMJIT RESIDENT ENGINEER