PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/20/26 EST. NO. 001 TIME 02:36 PM R.E. NAME: SOMMER, WILLIAM 04-2Y2204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/20/26 EST. NO. 001 TIME 02:36 PM R.E. NAME: SOMMER, WILLIAM 04-2Y2204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2Y2204 TIME 02:36 PM ESTIMATE NO. 001 BID OPENING 06/03/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: SOMMER, WILLIAM DATE OF THIS ESTIMATE 10/20/26 LOCATION PROGRESS ESTIMATE 04-CC-580-7.2/7.8 ----------------- 04-MRN-580-0.0/1.6 CERTIFIED COATINGS COMPANY CONTRA COSTA AND MARIN COUNTIES IN 2320 CORDELIA RD RICHMOND AND SAN RAFAEL FROM 1.1 MILES FAIRFIELD CA 94534 EAST OF MAIN STREET TO 1.1 MILES WEST OF TOLL PLAZA FED. AID NO. N O N E CLEAN & PAINT STR STEEL BR., SALVAGE TRAVE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 002 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 1.000 10,000.00 1.000 10,000 003 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 100,000.0000 100,000.00 0.000 0 004 TIME-RELATED OVERHEAD (LS) LS 5,400,000.0000 5,400,000.00 0.023 124,200.00 0.023 124,200 005 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 90,000.00 0.000 0 006 HOURLY OFF-SITE HR 200.0000 24,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 007 SAFETY QUALITY CONTROL MANAGER LS 600,000.0000 600,000.00 0.000 0 008 CONSTRUCTION AREA SIGNS LS 16,200.0000 16,200.00 0.400 6,480.00 0.400 6,480 009 TRAFFIC CONTROL SYSTEM LS 2,948,000.0000 2,948,000.00 0.000 0 010 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 500.0000 240,000.00 0.000 0 011 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 30.0000 28,800.00 0.000 0 SYSTEM 012 TEMPORARY SHUTTLE SERVICE LS 1.0000 1.00 0.000 0 013 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 20,000.0000 80,000.00 0.000 0 014 JOB SITE MANAGEMENT LS 100,000.0000 100,000.00 0.000 0 015 WATER POLLUTION CONTROL PROGRAM LS 10,000.0000 10,000.00 0.050 500.00 0.050 500 016 TEMPORARY CONCRETE WASHOUT LS 16,023.0000 16,023.00 0.000 0 017 HEALTH AND SAFETY PLAN LS 10,000.0000 10,000.00 1.000 10,000.00 1.000 10,000 018 WORK AREA MONITORING (BRIDGE) LS 50,000.0000 50,000.00 0.000 0 019 STRUCTURAL CONCRETE, BRIDGE CY 25,636.0000 2,307,240.00 0.000 0 (F) 020 MINOR CONCRETE CY 8,011.0000 208,286.00 0.000 0 (F) 021 DRILL AND BOND DOWEL (CHEMICAL ADHESIVE) LF 182.0000 268,450.00 0.000 0 (LF) 022 BAR REINFORCING STEEL (BRIDGE, STAINLESS LB 17.0000 228,820.00 0.000 0 STEEL) PROGRAM CAS145 PAGE 2 DATE 10/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2Y2204 TIME 02:36 PM ESTIMATE NO. 001 BID OPENING 06/03/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: SOMMER, WILLIAM DATE OF THIS ESTIMATE 10/20/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STRUCTURAL STEEL (BRIDGE) LB 232.0000 228,288.00 0.000 0 (F) 024 PLASTIC LUMBER MFBM 112,159.0000 112,159.00 0.000 0 (F) 025 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 36,300,000.0000 36,300,000.00 0.000 0 026 PAINT STRUCTURAL STEEL (EXISTING BRIDGE) LS 29,000,000.0000 29,000,000.00 0.000 0 027 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 36.0000 4,348,800.00 0.000 0 028 REMOVE PACK RUST AND PAINT UNDERCOAT LF 200.0000 317,400.00 0.000 0 (LF) 029 DRILL DRAIN HOLE (1 1/2") LF 6,142.0000 294,816.00 0.000 0 030 DRILL DRAIN HOLE (2") LF 9,317.0000 65,219.00 0.000 0 031 BRIDGE REMOVAL (PORTION) LS 3,475,966.0000 3,475,966.00 0.000 0 032 PAINT BRIDGE IDENTIFICATION EA 300.0000 18,000.00 0.000 0 033 GALVANIC ANODES EA 75.0000 96,000.00 0.000 0 034 SALVAGE TRAVELER COMPONENTS (LS) LS 94,040.0000 94,040.00 0.000 0 035 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 036 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 250,000.0000 250,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 037 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 038 CLEAN AND PAINT STRUCTURAL STEEL LS 9,432,831.0000 9,432,831.00 0.000 0 (EXISTING BRIDGE) PROGRAM CAS145 PAGE 3 DATE 10/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-2Y2204 TIME 02:36 PM ESTIMATE NO. 001 BID OPENING 06/03/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: SOMMER, WILLIAM DATE OF THIS ESTIMATE 10/20/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 151,180.00 151,180.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 151,180.00 151,180.00 039 MOBILIZATION LS 10,700,000.0000 10,700,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 107,469,339.00 TOTAL WORK COMPLETED 151,180.00 151,180.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 151,180.00 151,180.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/27/26 430 09/21/26 09/19/26 06/08/28 10 11 0 0 0% 2% PROGRESS IS SATISFACTORY PROGRESS IS SATISFACTORY SOMMER, WILLIAM RESIDENT ENGINEER