PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/12/12 EST. NO.10 TIME 01:58 PM R.E. NAME: PANDYA, NILESH 04-3A0504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/12/12 EST. NO.10 TIME 01:58 PM R.E. NAME: PANDYA, NILESH 04-3A0504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE SB UTILIZATION CPM -5,000.00 07 CPM/LAB 5,000.00 09 0.00 0.00 LABOR COMPLIANCE VIOLATION LABOR COMP. VIOL. -5,000.00 04 COMPLIED 5,000.00 05 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 04/12/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A0504 TIME 01:58 PM ESTIMATE NO. 10 BID OPENING 11/10/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/23/11 R.E. NAME: PANDYA, NILESH DATE OF THIS ESTIMATE 04/12/12 LOCATION FINAL ESTIMATE 04-SCL-880-0.0/4.3 -------------- DE SILVA GATES CONSTRUCTION IN SAN JOSE FROM ROUTE 280/880 11555 DUBLIN BLVD. SEPARATION TO OLD BAYSHORE HIGHWAY DUBLIN, CA 94568 OVERHEAD FED. AID NO. IM-880 -1(61)E REPLACE METAL BEAM GUARD RAIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,000.0000 2,000.00 1.000 2,000.00 002 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 750.00 1.000 250.00 003 TIME-RELATED OVERHEAD WDAY 1,000.0000 100,000.00 100.000 100,000.00 004 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 1.000 500.00 005 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 1.000 1,500.00 PROGRAM 006 TEMPORARY FIBER ROLL LF 4.0000 5,600.00 0.000 0.00 007 TEMPORARY CHECK DAM LF 10.0000 2,000.00 0.000 0.00 008 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 30,000.00 150.000 30,000.00 009 STREET SWEEPING LS 10,000.0000 10,000.00 1.000 10,000.00 010 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 1.000 1,000.00 011 TEMPORARY TACKED STRAW SQYD 0.2500 1,000.00 0.000 0.00 012 CONSTRUCTION AREA SIGNS LS 20,000.0000 20,000.00 1.000 20,000.00 013 TRAFFIC CONTROL SYSTEM LS 201,000.0000 201,000.00 1.000 201,000.00 014 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,000.0000 5,000.00 1.000 5,000.00 015 TEMPORARY RAILING (TYPE K) LF 10.0000 1,200.00 120.000 1,200.00 016 SALVAGE TEMPORARY RAILING (TYPE K) LF 5.0000 3,900.00 740.000 3,700.00 017 TEMPORARY ALTERNATIVE CRASH CUSHION EA 5,000.0000 10,000.00 2.000 10,000.00 018 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.5000 32,250.00 57,161.000 28,580.50 STRIPE (HAZARDOUS WASTE) 019 NOISE MONITORING LS 1,000.0000 1,000.00 1.000 1,000.00 020 REMOVE METAL BEAM GUARD RAILING LF 5.0000 13,150.00 1,593.000 7,965.00 021 REMOVE ASPHALT CONCRETE DIKE LF 0.2500 6,200.00 20,272.000 5,068.00 022 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.7500 1,380,000.00 334,381.820 1,253,931.83 PROGRAM CAS145 PAGE 2 DATE 04/12/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A0504 TIME 01:58 PM ESTIMATE NO. 10 BID OPENING 11/10/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/23/11 R.E. NAME: PANDYA, NILESH DATE OF THIS ESTIMATE 04/12/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE CRASH CUSHION (SAND FILLED) EA 500.0000 1,000.00 2.300 1,150.00 024 CLEARING AND GRUBBING LS 1,000.0000 1,000.00 1.000 1,000.00 025 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000.00 026 HOT MIX ASPHALT (OPEN GRADED) TON 69.0000 1,414,500.00 14,694.950 1,013,951.55 027 MINOR HOT MIX ASPHALT TON 69.0000 42,780.00 380.320 26,242.08 028 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 69.0000 2,532,300.00 31,099.290 2,145,851.01 029 DATA CORE LS 4,000.0000 4,000.00 1.000 4,000.00 030 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.0000 1,500.00 949.000 949.00 031 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.0000 22,100.00 18,710.000 18,710.00 032 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.0000 2,750.00 173.000 173.00 033 TACK COAT TON 2,500.0000 200,000.00 213.280 533,200.00 034 REPLACE CONCRETE PAVEMENT CY 750.0000 292,500.00 330.700 248,025.00 (RAPID STRENGTH CONCRETE) 035 PREPARE AND PAINT POSTMILE MARKINGS ON SQFT 10.0000 2,500.00 238.000 2,380.00 CONCRETE BARRIER 036 OBJECT MARKER (TYPE P) EA 50.0000 150.00 3.000 150.00 037 OBJECT MARKER (TYPE L-1) EA 50.0000 1,550.00 31.000 1,550.00 038 METAL BEAM GUARD RAILING LF 20.0000 52,800.00 1,400.000 28,000.00 039 CONCRETE BARRIER LF 800.0000 20,000.00 26.500 21,200.00 040 TRANSITION RAILING (TYPE WB) EA 3,000.0000 60,000.00 8.000 24,000.00 041 END ANCHOR ASSEMBLY (TYPE SFT) EA 700.0000 18,900.00 15.000 10,500.00 042 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,000.0000 9,000.00 7.000 21,000.00 043 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,000.0000 56,000.00 10.000 20,000.00 044 CRASH CUSHION (REACT 9SCBS) EA 50,000.0000 100,000.00 0.000 0.00 045 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 33,250.00 127,575.000 31,893.75 046 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 11,700.00 12,433.700 12,433.70 047 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 7,600.00 31,359.000 15,679.50 (BROKEN 12-3) 048 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 12,630.00 3,547.500 10,642.50 049 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 22,725.00 98,139.000 24,534.75 (BROKEN 36-12) PROGRAM CAS145 PAGE 3 DATE 04/12/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A0504 TIME 01:58 PM ESTIMATE NO. 10 BID OPENING 11/10/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/23/11 R.E. NAME: PANDYA, NILESH DATE OF THIS ESTIMATE 04/12/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 630.00 2,782.000 695.50 (BROKEN 17-7) 051 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 7,850.00 8,009.000 8,009.00 052 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 15,600.00 5,736.000 17,208.00 053 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000.00 SYSTEM ELEMENTS DURING CONSTRUCTION 054 REPLACE INDUCTIVE LOOP DETECTORS AND LS 100,000.0000 100,000.00 1.000 100,000.00 WVDS PROGRAM CAS145 PAGE 4 DATE 04/12/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A0504 TIME 01:58 PM ESTIMATE NO. 10 BID OPENING 11/10/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/23/11 R.E. NAME: PANDYA, NILESH DATE OF THIS ESTIMATE 04/12/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 6,031,823.67 ADJUSTMENT OF COMPENSATION 0.00 405,729.91 EXTRA WORK 0.00 15,637.65 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 6,453,191.23 055 MOBILIZATION LS 764,000.0000 764,000.00 1.000 764,000.00 ORIGINAL CONTRACT AMOUNT 7,645,365.00 TOTAL WORK COMPLETED 0.00 7,217,191.23 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 7,217,191.23 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/25/11 100 03/22/11 03/22/11 12/23/11 100 43 0 0 100% 100% PANDYA, NILESH RESIDENT ENGINEER PROGRAM CAS145 DATE 04/12/12