PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/22/13 EST. NO.01 TIME 02:53 PM R.E. NAME: VALEH, SYD 04-3A23U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/22/13 EST. NO.01 TIME 02:53 PM R.E. NAME: VALEH, SYD 04-3A23U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 LOCATION PROGRESS ESTIMATE 04-SON-101-25.0/29.3 ----------------- GHILOTTI CONSTRUCTION COMPANY ON ROUTE 101, BETWEEN AIRPORT BLVD 246 GHILOTTI AVENUE INTERCHANGE AND WINDSOR RIVER ROAD SANTA ROSA, CA 95407 UNDERCROSSING IN SONOMA COUNTY FED. AID NO. N O N E RECONSTRUCT THE EXISTING AIRPORT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,000.0000 3,000.00 0.000 0 002 TIME-RELATED OVERHEAD LS 987,000.0000 987,000.00 0.000 0 003 TEMPORARY FENCE (TYPE CL-6) LF 6.0000 18,420.00 0.000 0 004 TEMPORARY FENCE (TYPE CL-6, SLATTED) LF 10.0000 26,800.00 0.000 0 005 TEMPORARY FENCE (TYPE ESA) LF 6.0000 29,460.00 2,495.000 14,970.00 2,495.000 14,970 006 18" TEMPORARY CULVERT LF 70.0000 13,300.00 0.000 0 007 36" TEMPORARY CULVERT LF 110.0000 20,900.00 0.000 0 008 CONSTRUCTION SITE MANAGEMENT LS 100,000.0000 100,000.00 0.000 0 009 PREPARE STORM WATER POLLUTION LS 3,000.0000 3,000.00 0.000 0 PREVENTION PLAN 010 DEWATERING AND NON-STORM WATER DISCHARGE LS 30,000.0000 30,000.00 0.000 0 CONTROL 011 TEMPORARY FIBER ROLL LF 2.0000 130,000.00 2,495.000 4,990.00 2,495.000 4,990 012 TEMPORARY SILT FENCE LF 2.0000 60,000.00 6,585.000 13,170.00 6,585.000 13,170 013 TEMPORARY CONSTRUCTION ENTRANCE EA 500.0000 25,000.00 13.000 6,500.00 13.000 6,500 014 TEMPORARY COVER SQYD 1.5000 45,000.00 0.000 0 015 TEMPORARY CHECK DAM LF 4.0000 9,200.00 0.000 0 016 MOVE-IN/MOVE-OUT EA 750.0000 9,000.00 0.000 0 (TEMPORARY EROSION CONTROL) 017 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 10,000.00 0.000 0 018 TEMPORARY HYDRAULIC MULCH SQYD 0.2000 120,000.00 0.000 0 (BONDED FIBER MATRIX) 019 STREET SWEEPING LS 10,000.0000 10,000.00 0.000 0 020 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 15,000.0000 15,000.00 0.000 0 021 TEMPORARY CONSTRUCTION ROADWAY CY 1.0000 2,000.00 0.000 0 022 TEMPORARY CREEK DIVERSION SYSTEM LS 30,000.0000 30,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RAIN EVENT ACTION PLAN EA 500.0000 71,500.00 1.000 500.00 1.000 500 024 STORM WATER ANNUAL REPORT EA 2,000.0000 8,000.00 0.000 0 025 STORM WATER SAMPLING AND ANALYSIS DAY EA 200.0000 16,000.00 0.000 0 026 WATER QUALITY MONITORING REPORT EA 500.0000 8,000.00 0.000 0 027 WATER QUALITY SAMPLING AND ANALYSIS DAYS EA 150.0000 27,000.00 0.000 0 028 TEMPORARY TIMBER BULKHEAD EA 500.0000 1,000.00 0.000 0 029 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 0.100 2,500.00 0.100 2,500 030 TRAFFIC CONTROL SYSTEM LS 450,000.0000 450,000.00 0.000 0 031 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5.0000 850.00 0.000 0 032 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.3500 21,805.00 0.000 0 033 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 3,900.00 0.000 0 034 TEMPORARY PAVEMENT MARKER EA 3.0000 3,150.00 0.000 0 035 PORTABLE CHANGEABLE MESSAGE SIGN LS 50,000.0000 50,000.00 0.000 0 036 TEMPORARY RAILING (TYPE K) LF 7.0000 296,800.00 0.000 0 037 TEMPORARY CRASH CUSHION MODULE EA 60.0000 28,200.00 0.000 0 038 TEMPORARY RETAINING WALL SQFT 13.0000 74,750.00 0.000 0 039 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.5000 20,700.00 0.000 0 STRIPE (HAZARDOUS WASTE) 040 ABANDON SANITARY SEWER MANHOLE EA 2,000.0000 8,000.00 0.000 0 041 ABANDON SANITARY SEWER PIPE LF 17.0000 33,660.00 0.000 0 042 REMOVE CHAIN LINK FENCE LF 3.0000 33,300.00 0.000 0 043 REMOVE METAL BEAM GUARD RAILING LF 8.0000 13,280.00 0.000 0 044 REMOVE FLARED END SECTION EA 250.0000 250.00 0.000 0 045 REMOVE PAINTED TRAFFIC STRIPE LF 0.4500 16,920.00 0.000 0 046 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 14,940.00 0.000 0 047 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 1,600.00 0.000 0 048 REMOVE PAVEMENT MARKER EA 2.0000 6,360.00 0.000 0 049 REMOVE ROADSIDE SIGN EA 80.0000 5,600.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE SIGN STRUCTURE EA 3,000.0000 18,000.00 0.000 0 051 REMOVE SIGN PANEL EA 1,000.0000 5,000.00 0.000 0 052 REMOVE ASPHALT CONCRETE DIKE LF 7.0000 2,940.00 0.000 0 053 REMOVE CULVERT LF 17.0000 12,920.00 0.000 0 054 REMOVE INLET EA 600.0000 4,800.00 0.000 0 055 REMOVE HEADWALL EA 800.0000 14,400.00 0.000 0 056 REMOVE SEWER MANHOLE EA 1,000.0000 2,000.00 0.000 0 057 REMOVE SEWER PIPE LF 25.0000 625.00 0.000 0 058 REMOVE BASE AND SURFACING CY 10.0000 115,000.00 0.000 0 059 RELOCATE ROADSIDE SIGN-ONE POST EA 200.0000 200.00 0.000 0 060 RELOCATE ROADSIDE SIGN-TWO POST EA 300.0000 600.00 0.000 0 061 ADJUST INLET EA 1,000.0000 6,000.00 0.000 0 062 ADJUST FRAME AND COVER TO GRADE EA 600.0000 1,200.00 0.000 0 063 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 15.0000 8,250.00 0.000 0 064 REMOVE CONCRETE (CY) CY 150.0000 16,500.00 0.000 0 065 REMOVE CONCRETE SQYD 20.0000 12,600.00 0.000 0 066 REMOVE SACKED CONCRETE SLOPE CY 350.0000 2,800.00 0.000 0 PROTECTION 067 REMOVE CONCRETE (CURB AND GUTTER) LF 4.0000 56,400.00 0.000 0 068 REMOVE ROCK SLOPE PROTECTION CY 50.0000 1,000.00 0.000 0 069 REMOVE CONCRETE SIDEWALK LF 10.0000 15,600.00 0.000 0 070 REMOVE CONCRETE BARRIER LF 35.0000 18,200.00 0.000 0 071 REMOVE CRASH CUSHION (SAND FILLED) EA 1,500.0000 1,500.00 0.000 0 072 BRIDGE REMOVAL LS 200,000.0000 200,000.00 0.000 0 073 BRIDGE REMOVAL (PORTION) LS 30,000.0000 30,000.00 0.000 0 074 CLEARING AND GRUBBING LS 200,000.0000 200,000.00 0.220 44,000.00 0.220 44,000 075 DEVELOP WATER SUPPLY LS 40,000.0000 40,000.00 0.000 0 076 ROADWAY EXCAVATION CY 8.0000 984,000.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 ROADWAY EXCAVATION (TYPE Y-1) CY 8.0000 249,600.00 0.000 0 (AERIALLY DEPOSITED LEAD) 078 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.000 0 079 ADL BURIAL LOCATION REPORT LS 3,000.0000 3,000.00 0.000 0 080 SETTLEMENT INSTRUMENTATION LS 33,000.0000 33,000.00 0.000 0 081 STRUCTURE EXCAVATION (BRIDGE) CY 80.0000 196,960.00 0.000 0 (F) 082 STRUCTURE EXCAVATION (RETAINING WALL) CY 15.0000 22,620.00 0.000 0 (F) 083 STRUCTURE BACKFILL (BRIDGE) CY 105.0000 135,555.00 0.000 0 (F) 084 STRUCTURE BACKFILL (RETAINING WALL) CY 30.0000 91,890.00 0.000 0 (F) 085 PERVIOUS BACKFILL MATERIAL (RETAINING CY 70.0000 21,350.00 0.000 0 (F) WALL) 086 CONCRETE BACKFILL FAST SETTING CY 700.0000 37,800.00 0.000 0 087 DITCH EXCAVATION CY 50.0000 28,000.00 0.000 0 088 RAMMED AGGREGATE PIERS/STONE COLUMNS LF 24.0000 868,800.00 0.000 0 089 IMPORTED BORROW CY 1.0000 105,000.00 0.000 0 090 SUBGRADE ENHANCEMENT GEOTEXTILE SQYD 2.0000 9,140.00 0.000 0 091 HIGHWAY PLANTING LS 35,000.0000 35,000.00 0.000 0 092 ROADSIDE CLEARING LS 35,000.0000 35,000.00 0.100 3,500.00 0.100 3,500 093 MULCH CY 40.0000 6,800.00 0.000 0 094 EROSION CONTROL (COMPOST BLANKET) CY 33.0000 86,790.00 0.000 0 095 FIBER ROLLS LF 2.0000 132,000.00 0.000 0 096 COMPOST (INCORPORATE) SQYD 5.0000 3,550.00 0.000 0 097 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 750.0000 4,500.00 0.000 0 098 EROSION CONTROL (HYDROSEED) (ACRE) ACRE 5,000.0000 195,000.00 0.000 0 099 ROLLED EROSION CONTROL PRODUCT SQFT 0.2500 106,500.00 0.000 0 (NETTING) 100 PLANT ESTABLISHMENT WORK LS 10,000.0000 10,000.00 0.000 0 101 IRRIGATION SYSTEM LS 60,000.0000 60,000.00 0.000 0 102 3" SUPPLY LINE (BRIDGE) LF 75.0000 30,000.00 0.000 0 (F) 103 WATER METER EA 22,000.0000 66,000.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 8" CORRUGATED HIGH DENSITY LF 50.0000 11,500.00 0.000 0 POLYETHYLENE PIPE CONDUIT 105 4" WELDED STEEL PIPE CONDUIT LF 75.0000 4,800.00 0.000 0 (.237" THICK) 106 CLASS 4 AGGREGATE SUBBASE CY 15.0000 424,500.00 0.000 0 107 CLASS 3 AGGREGATE BASE CY 30.0000 417,000.00 0.000 0 108 LEAN CONCRETE BASE CY 105.0000 255,150.00 0.000 0 109 HOT MIX ASPHALT TON 80.0000 2,344,000.00 0.000 0 110 HOT MIX ASPHALT (OPEN GRADED) TON 105.0000 57,750.00 0.000 0 111 HOT MIX ASPHALT (LEVELING) TON 115.0000 26,450.00 0.000 0 112 DATA CORE LS 2,000.0000 2,000.00 0.000 0 113 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 8.0000 800.00 0.000 0 114 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 8.0000 12,320.00 0.000 0 115 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 8.0000 2,160.00 0.000 0 116 PLACE HOT MIX ASPHALT SQYD 30.0000 6,300.00 0.000 0 (MISCELLANEOUS AREA) 117 TACK COAT TON 500.0000 19,500.00 0.000 0 118 FURNISH PILING (CLASS 90) LF 35.0000 26,880.00 0.000 0 119 DRIVE PILE (CLASS 90) EA 2,500.0000 35,000.00 0.000 0 120 FURNISH 24" CAST-IN-STEEL SHELL LF 90.0000 1,213,830.00 0.000 0 CONCRETE PILING 121 DRIVE 24" CAST-IN-STEEL SHELL CONCRETE EA 5,000.0000 850,000.00 0.000 0 PILE 122 16" CAST-IN-DRILLED-HOLE CONCRETE LF 70.0000 37,100.00 0.000 0 PILING (BARRIER) 123 16" CAST-IN-DRILLED-HOLE CONCRETE LF 60.0000 553,200.00 0.000 0 PILING (SOUND WALL) 124 PRESTRESSING CAST-IN-PLACE CONCRETE LS 250,000.0000 250,000.00 0.000 0 125 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 450.0000 317,250.00 0.000 0 (F) 126 STRUCTURAL CONCRETE, BRIDGE CY 800.0000 2,824,000.00 0.000 0 (F) 127 STRUCTURAL CONCRETE, RETAINING WALL CY 400.0000 472,000.00 0.000 0 (F) 128 STRUCTURAL CONCRETE, SOUND WALL CY 1,000.0000 369,000.00 0.000 0 (F) 129 STRUCTURAL CONCRETE, APPROACH SLAB CY 700.0000 192,500.00 0.000 0 (F) (TYPE N) 130 STRUCTURAL CONCRETE, BOX CULVERT CY 850.0000 109,650.00 0.000 0 (F) PROGRAM CAS145 PAGE 6 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 STRUCTURAL CONCRETE, WINGWALL CY 1,100.0000 10,780.00 0.000 0 (F) 132 MINOR CONCRETE (MINOR STRUCTURE) CY 1,500.0000 235,500.00 0.000 0 (F) 133 ARCHITECTURAL TEXTURE (FRACTURED FIN) SQFT 9.0000 121,554.00 0.000 0 (F) 134 ANTI-GRAFFITI COATING SQFT 1.0000 18,976.00 0.000 0 (F) 135 SOUND WALL (BARRIER) (MASONRY BLOCK) SQFT 18.0000 81,342.00 0.000 0 (F) 136 SOUND WALL (MASONRY BLOCK) SQFT 18.0000 1,532,574.00 0.000 0 (F) 137 JOINT SEAL (MR 1") LF 40.0000 3,320.00 0.000 0 138 JOINT SEAL ASSEMBLY (MR 2 1/2") LF 200.0000 45,200.00 0.000 0 139 BAR REINFORCING STEEL (BRIDGE) LB 1.0000 1,362,709.00 0.000 0 (F) 140 BAR REINFORCING STEEL (RETAINING WALL) LB 1.0000 127,868.00 0.000 0 (F) 141 BAR REINFORCING STEEL (BOX CULVERT) LB 1.0000 19,524.00 0.000 0 (F) 142 BAR REINFORCING STEEL (WINGWALL) LB 1.0000 500.00 0.000 0 (F) 143 FURNISH SIGN STRUCTURE (TRUSS) LB 3.5000 132,699.00 0.000 0 (F) 144 INSTALL SIGN STRUCTURE (TRUSS) LB 0.2500 9,478.50 0.000 0 (F) 145 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 15.0000 19,800.00 0.000 0 146 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 4,350.00 0.000 0 (0.063"-FRAMED) 147 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 5,850.00 0.000 0 (0.080"-FRAMED) 148 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 1,200.0000 60,000.00 0.000 0 (SIGN FOUNDATION) 149 ROADSIDE SIGN - ONE POST EA 200.0000 4,600.00 0.000 0 150 ROADSIDE SIGN - TWO POST EA 300.0000 3,600.00 0.000 0 151 INSTALL SIGN OVERLAY SQFT 12.0000 600.00 0.000 0 152 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 5.0000 3,650.00 0.000 0 153 18" ALTERNATIVE PIPE CULVERT (TYPE A) LF 75.0000 88,500.00 0.000 0 154 18" ALTERNATIVE PIPE CULVERT (TYPE B) LF 75.0000 135,000.00 0.000 0 155 21" ALTERNATIVE PIPE CULVERT LF 175.0000 31,500.00 0.000 0 156 24" ALTERNATIVE PIPE CULVERT (TYPE A) LF 100.0000 43,000.00 0.000 0 157 24" ALTERNATIVE PIPE CULVERT (TYPE B) LF 100.0000 800.00 0.000 0 PROGRAM CAS145 PAGE 7 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 158 30" ALTERNATIVE PIPE CULVERT LF 100.0000 57,000.00 0.000 0 159 42" ALTERNATIVE PIPE CULVERT LF 150.0000 19,500.00 0.000 0 160 18" ALTERNATIVE SLOTTED PIPE LF 150.0000 6,000.00 0.000 0 161 36" REINFORCED CONCRETE PIPE LF 300.0000 21,600.00 0.000 0 162 12" CORRUGATED STEEL PIPE LF 50.0000 21,500.00 0.000 0 163 18" CORRUGATED STEEL PIPE (.079" THICK) LF 70.0000 4,410.00 0.000 0 164 DRAINAGE INLET MARKER EA 70.0000 1,050.00 0.000 0 165 WELDED STEEL PIPE CASING (BRIDGE) LF 150.0000 12,900.00 0.000 0 166 18" ALTERNATIVE FLARED END SECTION EA 350.0000 1,050.00 0.000 0 167 24" ALTERNATIVE FLARED END SECTION EA 450.0000 900.00 0.000 0 168 24" REINFORCED CONCRETE SEWER PIPE LF 1,000.0000 104,000.00 0.000 0 169 8" POLYVINYL CHLORIDE SEWER PIPE LF 100.0000 5,500.00 0.000 0 170 21" HIGH DENSITY POLYETHYLENE SEWER LF 280.0000 506,800.00 0.000 0 PIPE 171 ROCK SLOPE PROTECTION CY 220.0000 10,120.00 0.000 0 (FACING, METHOD B) 172 ROCK SLOPE PROTECTION CY 220.0000 18,920.00 0.000 0 (NO. 2, METHOD B) 173 CONCRETE (DITCH LINING) CY 250.0000 5,250.00 0.000 0 174 SLOPE PAVING (CONCRETE) CY 900.0000 77,400.00 0.000 0 (F) 175 SLOPE PAVING (MASONRY BLOCK) SQFT 21.0000 133,014.00 0.000 0 (F) 176 SACKED CONCRETE SLOPE PROTECTION CY 1,500.0000 40,500.00 0.000 0 177 ROCK SLOPE PROTECTION FABRIC SQYD 2.0000 980.00 0.000 0 178 MINOR CONCRETE (MISCELLANEOUS CY 400.0000 223,200.00 0.000 0 (F) CONSTRUCTION) 179 MISCELLANEOUS IRON AND STEEL LB 2.0000 37,156.00 0.000 0 (F) 180 BRIDGE DECK DRAINAGE SYSTEM LB 6.0000 48,492.00 0.000 0 (F) 181 CHAIN LINK FENCE (TYPE CL-6) LF 10.0000 61,000.00 0.000 0 182 8' CHAIN LINK GATE (TYPE CL-6) EA 750.0000 1,500.00 0.000 0 183 DELINEATOR (CLASS 1) EA 35.0000 3,850.00 0.000 0 184 GUARD RAILING DELINEATOR EA 35.0000 280.00 0.000 0 PROGRAM CAS145 PAGE 8 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 185 OBJECT MARKER (TYPE L) EA 40.0000 40.00 0.000 0 186 OBJECT MARKER (TYPE P) EA 40.0000 2,600.00 0.000 0 187 METAL BEAM GUARD RAILING (WOOD POST) LF 17.0000 53,380.00 0.000 0 188 CHAIN LINK RAILING (TYPE 7 MODIFIED) LF 100.0000 77,400.00 0.000 0 (F) 189 CONCRETE BARRIER (TYPE K) LF 60.0000 8,400.00 0.000 0 (F) 190 TUBULAR HANDRAILING LF 55.0000 17,215.00 0.000 0 (F) 191 CONCRETE BARRIER (TYPE 26 MODIFIED) LF 250.0000 96,250.00 0.000 0 (F) 192 TRANSITION RAILING (TYPE WB) EA 2,800.0000 19,600.00 0.000 0 193 END CAP (TYPE TC) EA 200.0000 1,400.00 0.000 0 194 END ANCHOR ASSEMBLY (TYPE SFT) EA 675.0000 3,375.00 0.000 0 195 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,800.0000 11,200.00 0.000 0 196 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,000.0000 12,000.00 0.000 0 197 CONCRETE BARRIER (TYPE 60C) LF 130.0000 20,800.00 0.000 0 198 CONCRETE BARRIER (TYPE 60R) LF 300.0000 48,000.00 0.000 0 199 CONCRETE BARRIER (TYPE 736) LF 130.0000 64,350.00 0.000 0 (F) 200 CONCRETE BARRIER (TYPE 736 MODIFIED) LF 130.0000 226,460.00 0.000 0 (F) 201 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 29,540.00 0.000 0 202 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 3,260.00 0.000 0 203 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.3500 9,315.00 0.000 0 204 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 23,820.00 0.000 0 205 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 180.00 0.000 0 (BROKEN 6-1) 206 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 132.00 0.000 0 (YELLOW, BROKEN 6-1) 207 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 540.00 0.000 0 (BROKEN 17-7) 208 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 5,850.00 0.000 0 (BROKEN 34-14) 209 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 2,598.00 0.000 0 (BROKEN 18-12) 210 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 990.00 0.000 0 (BROKEN 8-4) 211 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.5000 7,245.00 0.000 0 PROGRAM CAS145 PAGE 9 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 212 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 5,425.00 0.000 0 213 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 214 SIGNAL AND LIGHTING (LOCATION 1) LS 150,000.0000 150,000.00 0.000 0 215 SIGNAL AND LIGHTING (LOCATION 2) LS 140,000.0000 140,000.00 0.000 0 216 SIGNAL AND LIGHTING (STAGE CONSTRUCTION) LS 215,000.0000 215,000.00 0.000 0 217 LONG LEAD-IN LOOP DETECTOR LS 3,000.0000 3,000.00 0.000 0 218 LIGHTING AND SIGN ILLUMINATION LS 350,000.0000 350,000.00 0.000 0 (LOCATION 1) 219 LIGHTING AND SIGN ILLUMINATION LS 130,000.0000 130,000.00 0.000 0 (STAGE CONSTRUCTION) 220 INTERCONNECTION CONDUIT AND CABLE LS 45,000.0000 45,000.00 0.000 0 221 TRAFFIC OPERATIONS SYSTEM LS 340,000.0000 340,000.00 0.000 0 222 GENERAL PACKET RADIO SYSTEM (GPRS) EA 2,000.0000 6,000.00 0.000 0 WIRELESS MODEM ASSEMBLY 223 TEMPORARY REINFORCED SILT FENCE LF 10.0000 30,000.00 0.000 0 224 TEMPORARY GRAVEL BAG BERM LF 15.0000 3,750.00 0.000 0 225 CONTRACTOR SUPPLIED BIOLOGIST (LS) LS 50,000.0000 50,000.00 0.000 0 226 NATURAL RESOURCE PROTECTION PLAN LS 6,000.0000 6,000.00 0.000 0 227 FISH PROTECTION LS 6,000.0000 6,000.00 0.000 0 228 PLANT (GROUP W) EA 15.0000 10,500.00 0.000 0 229 36" CONCRETE FLARED END SECTION EA 1,000.0000 1,000.00 0.000 0 230 ROOT WAD REVETMENT LS 20,000.0000 20,000.00 0.000 0 PROGRAM CAS145 PAGE 10 DATE 01/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A23U4 TIME 02:53 PM ESTIMATE NO. 01 BID OPENING 10/17/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/13 R.E. NAME: VALEH, SYD DATE OF THIS ESTIMATE 01/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 90,130.00 90,130.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 90,130.00 90,130.00 231 MOBILIZATION LS 2,800,000.0000 2,800,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 28,704,936.50 TOTAL WORK COMPLETED 90,130.00 90,130.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 90,130.00 90,130.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/27/12 175 01/11/13 01/11/13 09/23/13 3 0 0 0 0% 2% PROGRESS IS SATISFACTORY VALEH, SYD RESIDENT ENGINEER PROGRAM CAS145 DATE 01/22/13