PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/23/09 EST. NO.01 TIME 09:01 AM R.E. NAME: REZAEI, ASGHAR 04-3A7604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/23/09 EST. NO.01 TIME 09:01 AM R.E. NAME: REZAEI, ASGHAR 04-3A7604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/23/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A7604 TIME 09:01 AM ESTIMATE NO. 01 BID OPENING 08/06/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/09 R.E. NAME: REZAEI, ASGHAR DATE OF THIS ESTIMATE 03/23/09 LOCATION PROGRESS ESTIMATE 04-CC-580-6.1/7.8 ----------------- 04-MRN-580-0.0/2.6 MANSON CONSTRUCTION, CO. IN CONTRA COSTA AND MARIN COUNTIES 200 CUTTING BOULEVARD ON ROUTE 580 AT THE RICHMOND-SAN RICHMOND, CA 94804-2128 RAFAEL BRIDGE FED. AID NO. N O N E FENDER REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,700.0000 2,700.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 4,500.0000 4,500.00 0.000 0.00 PROGRAM 03 BRIDGE REMOVAL (PORTION) LS 124,000.0000 124,000.00 0.071 8,804.00 0.071 8,804.00 04 STRUCTURAL CONCRETE, BRIDGE CY 20,000.0000 80,000.00 0.000 0.00 F) 05 DRILL AND BOND DOWEL LF 350.0000 39,200.00 0.000 0.00 06 INJECT CRACK (EPOXY) LF 400.0000 8,800.00 0.000 0.00 07 PRECAST CONCRETE BUMPER SEAT EA 3,700.0000 59,200.00 0.000 0.00 08 REPAIR SPALLED SURFACE AREA SQFT 300.0000 73,500.00 0.000 0.00 09 CORE CONCRETE (1 1/2") LF 100.0000 12,800.00 0.000 0.00 S) 10 RUBBER BUMPER EA 16,000.0000 512,000.00 0.000 0.00 S) 11 BAR REINFORCING STEEL (EPOXY COATED) LB 5.0000 7,200.00 0.000 0.00 SF) 12 PLASTIC LUMBER CY 2,600.0000 280,800.00 0.000 0.00 F) 13 MISCELLANEOUS METAL (BRIDGE) LB 4.0000 151,200.00 0.000 0.00 F) PROGRAM CAS145 PAGE 2 DATE 03/23/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A7604 TIME 09:01 AM ESTIMATE NO. 01 BID OPENING 08/06/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/09 R.E. NAME: REZAEI, ASGHAR DATE OF THIS ESTIMATE 03/23/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 8,804.00 8,804.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 8,804.00 8,804.00 14 MOBILIZATION LS 93,700.0000 93,700.00 0.750 70,275.00 0.750 70,275.00 ORIGINAL CONTRACT AMOUNT 1,449,600.00 TOTAL WORK COMPLETED 79,079.00 79,079.00 MATERIALS ON HAND ON SITE 223,006.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 79,079.00 302,085.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/26/08 155 00/00/00 11/20/08 07/07/09 80 0 0 0 6% 52% PROGRESS UNSATISFACTORY REZAEI, ASGHAR RESIDENT ENGINEER PROGRAM CAS145 DATE 03/23/09