PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/29/09 EST. NO.05 TIME 01:52 PM R.E. NAME: REZAEI ASGHAR 04-3A7604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 4,725.37 E.W. @ F.A.(+) 051509 N 01 0 4,725.37 TOTAL THIS ESTIMATE 67,231.43 TOTAL PREVIOUS ESTIMATE 71,956.80 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/29/09 EST. NO.05 TIME 01:52 PM R.E. NAME: REZAEI ASGHAR 04-3A7604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/29/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A7604 TIME 01:52 PM ESTIMATE NO. 05 BID OPENING 08/06/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/26/09 R.E. NAME: REZAEI ASGHAR DATE OF THIS ESTIMATE 07/29/09 LOCATION FINAL ESTIMATE 04-CC-580-6.1/7.8 -------------- 04-MRN-580-0.0/2.6 MANSON CONSTRUCTION CO. IN CONTRA COSTA AND MARIN COUNTIES 200 CUTTING BOULEVARD ON ROUTE 580 AT THE RICHMOND-SAN RICHMOND, CA 94804-2128 RAFAEL BRIDGE FED. AID NO. N O N E FENDER REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,700.0000 2,700.00 1.000 2,700.00 02 PREPARE WATER POLLUTION CONTROL LS 4,500.0000 4,500.00 1.000 4,500.00 PROGRAM 03 BRIDGE REMOVAL (PORTION) LS 124,000.0000 124,000.00 1.000 124,000.00 04 STRUCTURAL CONCRETE, BRIDGE CY 20,000.0000 80,000.00 0.000 0.00 F) 05 DRILL AND BOND DOWEL LF 350.0000 39,200.00 0.000 0.00 06 INJECT CRACK (EPOXY) LF 400.0000 8,800.00 22.000 8,800.00 07 PRECAST CONCRETE BUMPER SEAT EA 3,700.0000 59,200.00 0.000 0.00 08 REPAIR SPALLED SURFACE AREA SQFT 300.0000 73,500.00 1.300 390.00 235.300 70,590.00 09 CORE CONCRETE (1 1/2") LF 100.0000 12,800.00 0.000 0.00 S) 10 RUBBER BUMPER EA 16,000.0000 512,000.00 32.000 512,000.00 S) 11 BAR REINFORCING STEEL (EPOXY COATED) LB 5.0000 7,200.00 0.000 0.00 SF) 12 PLASTIC LUMBER CY 2,600.0000 280,800.00 108.000 280,800.00 F) 13 MISCELLANEOUS METAL (BRIDGE) LB 4.0000 151,200.00 33,036.000 132,144.00 F) PROGRAM CAS145 PAGE 2 DATE 07/29/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3A7604 TIME 01:52 PM ESTIMATE NO. 05 BID OPENING 08/06/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/26/09 R.E. NAME: REZAEI ASGHAR DATE OF THIS ESTIMATE 07/29/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 390.00 1,135,534.00 ADJUSTMENT OF COMPENSATION 0.00 2,062.00 EXTRA WORK 4,725.37 69,894.80 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 5,115.37 1,207,490.80 14 MOBILIZATION LS 93,700.0000 93,700.00 1.000 93,700.00 ORIGINAL CONTRACT AMOUNT 1,449,600.00 TOTAL WORK COMPLETED 5,115.37 1,301,190.80 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 5,115.37 1,301,190.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/26/08 155 03/17/09 11/20/08 05/26/09 124 2 0 0 100% 100% REZAEI ASGHAR RESIDENT ENGINEER PROGRAM CAS145 DATE 07/29/09