PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/19/21 EST. NO. 010 TIME 03:10 PM R.E. NAME: ATAKO, KINGSTON 04-3G4544 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/19/21 EST. NO. 010 TIME 03:10 PM R.E. NAME: ATAKO, KINGSTON 04-3G4544 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/19/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3G4544 TIME 03:10 PM ESTIMATE NO. 010 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/21 R.E. NAME: ATAKO, KINGSTON DATE OF THIS ESTIMATE 01/19/21 LOCATION PROGRESS ESTIMATE 04-SM-92-R14.4/R18.8 ----------------- 04-ALA-92-R0.0/R2.4 GOLDEN STATE BRIDGE, INC. ON THE RICHMOND-SAN RAFAEL BRIDGE 3701 MALLARD DRIVE; BENICIA CA 94510 FED. AID NO. N O N E REPAIR SPALLED CONCRETE COLUMNS AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 20,000.0000 20,000.00 0.250 5,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 4,000.0000 3,240,000.00 19.000 76,000.00 213.000 852,000 003 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 0.025 2,500.00 0.255 25,500 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 15,000.0000 15,000.00 0.025 375.00 0.255 3,825 005 JOB SITE MANAGEMENT LS 25,000.0000 25,000.00 0.025 625.00 0.255 6,375 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 3,000.0000 3,000.00 0.750 2,250 007 STREET SWEEPING LS 1.0000 1.00 0.000 0 008 TEMPORARY CONCRETE WASHOUT LS 14,000.0000 14,000.00 0.025 350.00 0.255 3,570 009 STRUCTURAL CONCRETE, BRIDGE (REPAIR) CY 20,000.0000 460,000.00 23.000 460,000 (F) 010 DRILL AND BOND DOWEL LF 75.0000 12,375.00 0.000 0 011 DRILL AND BOND DOWEL LF 110.0000 290,290.00 0.000 0 (CHEMICAL ADHESIVE)(LF) 012 BAR REINFORCING STEEL (BRIDGE) LB 5.0000 12,290.00 2,458.000 12,290 (F) 013 WELDED WIRE REINFORCEMENT (STAINLESS SQFT 4.0000 14,664.00 208.000 832 (F) STEEL) 014 GALVANIC ANODE EA 30.0000 529,230.00 138.000 4,140.00 619.000 18,570 015 PAINT BRIDGE IDENTIFICATION NUMBER EA 100.0000 151,200.00 0.000 0 016 INJECT CRACK (EPOXY) LF 125.0000 60,875.00 0.000 0 017 REPAIR SPALLED SURFACE AREA SQFT 157.0000 4,110,888.00 1,286.750 202,019.75 7,325.210 1,150,057 018 BRIDGE REMOVAL (PORTION) LS 4,400,000.0000 4,400,000.00 0.168 739,200.00 0.820 3,608,000 PROGRAM CAS145 PAGE 2 DATE 01/19/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3G4544 TIME 03:10 PM ESTIMATE NO. 010 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/21 R.E. NAME: ATAKO, KINGSTON DATE OF THIS ESTIMATE 01/19/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,025,209.75 6,148,269.97 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 2,450.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,025,209.75 6,150,719.97 019 MOBILIZATION LS 1,400,000.0000 1,400,000.00 0.950 1,330,000 ORIGINAL CONTRACT AMOUNT 14,858,813.00 TOTAL WORK COMPLETED 1,025,209.75 7,480,719.97 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,025,209.75 7,480,719.97 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/14/20 810 03/12/20 03/11/20 06/13/23 213 2 0 0 49% 26% PROGRESS IS SATISFACTORY ATAKO, KINGSTON RESIDENT ENGINEER PROGRAM CAS145 DATE 01/19/21