PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/18/24 EST. NO. 056 TIME 11:16 AM R.E. NAME: ATAKO, KINGSTON 04-3G4544 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 006 3844 8,692.04 E.W. @ F.A.(+) 102224 N 4240.0 3845 1,899.92 102224 N 4241.0 3846 569.98 102224 N 4242.0 3847 479.60 102224 N 4243.0 3849 8,692.04 102324 N 4245.0 3850 1,899.92 102324 N 4246.0 3851 569.98 102324 N 4247.0 3852 479.60 102324 N 4248.0 3854 8,692.04 102424 N 4250.0 3855 1,899.92 102424 N 4251.0 3856 569.98 102424 N 4252.0 3857 479.60 102424 N 4253.0 3859 8,924.00 102524 N 4255.0 3860 1,899.92 102524 N 4256.0 3861 569.98 102524 N 4257.0 3862 479.60 102524 N 4258.0 3864 8,692.04 102824 N 4260.0 3865 1,899.92 102824 N 4261.0 3866 569.98 102824 N 4262.0 3867 479.60 102824 N 4263.0 3869 8,692.04 102924 N 4265.0 3870 1,899.92 102924 N 4266.0 3871 569.98 102924 N 4267.0 3872 479.60 102924 N 4268.0 3873 7,477.70 092324 N 4269.0 3875 8,692.04 103024 N 4271.0 3876 1,899.92 103024 N 4272.0 3877 569.98 103024 N 4273.0 3878 586.30 103024 N 4274.0 3880 8,692.04 103124 N 4276.0 3881 1,899.92 103124 N 4277.0 3882 569.98 103124 N 4278.0 3883 586.30 103124 N 4279.0 3884 22,915.80 110124 N 4280.0 3885 7,343.69 110124 N 4281.0 3886 1,554.08 110124 N 4282.0 3887 466.22 110124 N 4283.0 3888 479.60 110124 N 4284.0 3889 494.07 100324 N 4285.0 134,308.84 TOTAL THIS ESTIMATE 32,088,190.98 TOTAL PREVIOUS ESTIMATE 32,222,499.82 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/18/24 EST. NO. 056 TIME 11:16 AM R.E. NAME: ATAKO, KINGSTON 04-3G4544 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3G4544 TIME 11:16 AM ESTIMATE NO. 056 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/24 R.E. NAME: ATAKO, KINGSTON DATE OF THIS ESTIMATE 11/18/24 LOCATION PROGRESS ESTIMATE 04-SM-92-R14.4/R18.8 ----------------- 04-ALA-92-R0.0/R2.4 GOLDEN STATE BRIDGE, INC. IN ALAMEDA AND SAN MATEO COUNTIES AT 3701 MALLARD DRIVE VARIOUS LOCATIONS BENICIA CA 94510 FED. AID NO. N O N E REPAIR SPALLED CONCRETE COLUMNS AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 20,000.0000 20,000.00 0.500 10,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 4,000.0000 3,240,000.00 19.000 76,000.00 1,118.000 4,472,000 003 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 1.000 100,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 15,000.0000 15,000.00 1.000 15,000 005 JOB SITE MANAGEMENT LS 25,000.0000 25,000.00 1.000 25,000 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 3,000.0000 3,000.00 0.750 2,250 007 STREET SWEEPING LS 1.0000 1.00 1.000 1 008 TEMPORARY CONCRETE WASHOUT LS 14,000.0000 14,000.00 1.000 14,000 009 STRUCTURAL CONCRETE, BRIDGE (REPAIR) CY 20,000.0000 460,000.00 23.000 460,000 (F) 010 DRILL AND BOND DOWEL LF 75.0000 12,375.00 0.000 0 011 DRILL AND BOND DOWEL LF 110.0000 290,290.00 0.000 0 (CHEMICAL ADHESIVE)(LF) 012 BAR REINFORCING STEEL (BRIDGE) LB 5.0000 12,290.00 3,647.000 18,235 (F) 013 WELDED WIRE REINFORCEMENT (STAINLESS SQFT 4.0000 14,664.00 0.000 0 (F) STEEL) 014 GALVANIC ANODE EA 30.0000 529,230.00 1,428.000 42,840 015 PAINT BRIDGE IDENTIFICATION NUMBER EA 100.0000 151,200.00 1,526.000 152,600 016 INJECT CRACK (EPOXY) LF 125.0000 60,875.00 0.000 0 017 REPAIR SPALLED SURFACE AREA SQFT 157.0000 4,110,888.00 5,651.670 887,312 018 BRIDGE REMOVAL (PORTION) LS 4,400,000.0000 4,400,000.00 1.000 4,400,000 PROGRAM CAS145 PAGE 2 DATE 11/18/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3G4544 TIME 11:16 AM ESTIMATE NO. 056 BID OPENING 12/04/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/24 R.E. NAME: ATAKO, KINGSTON DATE OF THIS ESTIMATE 11/18/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 76,000.00 10,599,238.19 ADJUSTMENT OF COMPENSATION 0.00 -703,876.02 EXTRA WORK 134,308.84 32,926,375.84 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 210,308.84 42,821,738.01 019 MOBILIZATION LS 1,400,000.0000 1,400,000.00 1.000 1,400,000 ORIGINAL CONTRACT AMOUNT 14,858,813.00 TOTAL WORK COMPLETED 210,308.84 44,221,738.01 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 210,308.84 44,221,738.01 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/14/20 810 03/12/20 03/12/20 12/31/24 1118 53 320 0 99% 99% PROGRESS IS SATISFACTORY ATAKO, KINGSTON RESIDENT ENGINEER