PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/20/26 EST. NO. 001 TIME 12:46 PM R.E. NAME: PLATA, OMAR 04-3G4874 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/20/26 EST. NO. 001 TIME 12:46 PM R.E. NAME: PLATA, OMAR 04-3G4874 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3G4874 TIME 12:46 PM ESTIMATE NO. 001 BID OPENING 11/13/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/26 R.E. NAME: PLATA, OMAR DATE OF THIS ESTIMATE 04/20/26 LOCATION PROGRESS ESTIMATE 04-SF-80-5.7/7.7 ----------------- F.D. THOMAS, INC. THE CITY AND COUNTY OF SAN FRANCISCO FROM 200 HARRIS AVE 0.1 MILE EAST OF FREMONT STREET OFF-RAMP SACRAMENTO CA 95838 TO 0.2 MILE WEST OF YERBA BUENA ISLAND OFF-RAMP FED. AID NO. N O N E REPAIR SPALL, CLEAN AND PAINT STRUCTURAL S ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.500 1,250.00 0.500 1,250 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 25,000.0000 25,000.00 0.000 0 003 TIME-RELATED OVERHEAD (LS) LS 15,800,000.0000 15,800,000.00 0.007 110,600.00 0.007 110,600 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 402,000.00 0.000 0 005 HOURLY OFF-SITE HR 200.0000 24,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 SAFETY QUALITY CONTROL MANAGER LS 400,000.0000 400,000.00 0.000 0 007 CONSTRUCTION AREA SIGNS LS 56,000.0000 56,000.00 0.250 14,000.00 0.250 14,000 008 TRAFFIC CONTROL SYSTEM LS 1,403,000.0000 1,403,000.00 0.050 70,150.00 0.050 70,150 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 500.0000 900,000.00 0.000 0 010 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 400.0000 720,000.00 0.000 0 SYSTEM 011 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 13,333.0000 39,999.00 1.998 26,639.33 1.998 26,639 012 JOB SITE MANAGEMENT LS 100,000.0000 100,000.00 0.007 700.00 0.007 700 013 WATER POLLUTION CONTROL PROGRAM LS 3,500.0000 3,500.00 0.250 875.00 0.250 875 014 TEMPORARY DRAINAGE INLET PROTECTION EA 1,300.0000 65,000.00 0.000 0 015 HEALTH AND SAFETY PLAN LS 6,000.0000 6,000.00 0.000 0 016 WORK AREA MONITORING (BRIDGE) LS 250,000.0000 250,000.00 0.000 0 017 NOISE MONITORING LS 25,000.0000 25,000.00 0.000 0 018 TEMPORARY SUPPORT LS 300,000.0000 300,000.00 0.000 0 019 STRUCTURAL STEEL (BRIDGE) LB 225.0000 509,175.00 0.000 0 (F) 020 CLEAN AND PAINT STRUCTURAL STEEL LS 95,230,000.0000 95,230,000.00 0.000 0 (EXISTING BRIDGE) 021 CLEAN PACK RUST AND PAINT UNDERCOAT LF 250.0000 201,750.00 0.000 0 022 PUBLIC SAFETY PLAN LS 5,500.0000 5,500.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3G4874 TIME 12:46 PM ESTIMATE NO. 001 BID OPENING 11/13/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/26 R.E. NAME: PLATA, OMAR DATE OF THIS ESTIMATE 04/20/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REPAIR SPALLED SURFACE AREA (FIBER SQFT 310.0000 12,995,510.00 0.000 0 REINFORCED FILLER) 024 BRIDGE REMOVAL (PORTION) LS 210,000.0000 210,000.00 0.000 0 025 CLEAN AND RESET EXPANSION FINGER JOINT LF 190.0000 242,440.00 0.000 0 026 GALVANIC ANODES EA 22.0000 552,046.00 0.000 0 027 MISCELLANEOUS METAL (BRIDGE) LB 125.0000 582,125.00 0.000 0 (F) 028 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 7,000.0000 7,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 029 MODIFYING LIGHTING SYSTEMS LS 1,695,000.0000 1,695,000.00 0.000 0 030 REMOVING LIGHTING SYSTEMS LS 678,000.0000 678,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/20/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3G4874 TIME 12:46 PM ESTIMATE NO. 001 BID OPENING 11/13/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/26 R.E. NAME: PLATA, OMAR DATE OF THIS ESTIMATE 04/20/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 224,214.33 224,214.33 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 224,214.33 224,214.33 031 MOBILIZATION LS 14,800,000.0000 14,800,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 148,230,545.00 TOTAL WORK COMPLETED 224,214.33 224,214.33 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 224,214.33 224,214.33 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/10/26 1350 04/06/26 04/05/26 09/03/31 9 2 0 0 0% 1% PROGRESS IS SATISFACTORY PLATA, OMAR RESIDENT ENGINEER