PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/18/22 EST. NO. 001 TIME 09:55 AM R.E. NAME: BEHNIWAL NACHHATAR (NEIL) 04-3J1304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/18/22 EST. NO. 001 TIME 09:55 AM R.E. NAME: BEHNIWAL NACHHATAR (NEIL) 04-3J1304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/18/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3J1304 TIME 09:55 AM ESTIMATE NO. 001 BID OPENING 10/13/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/22 R.E. NAME: BEHNIWAL NACHHATAR (NEIL) DATE OF THIS ESTIMATE 03/18/22 LOCATION PROGRESS ESTIMATE 04-ALA-580 ----------------- PTM GENERAL ENGINEERING IN ALAMEDA COUNTY AT VARIOUS SERVICES, INC. LOCATIONS 5942 ACORN STREET; RIVERSIDE CA 92504 FED. AID NO. SIMG-X001(665)E INSTALL ACESSIBLE PEDESTRIAN SIGNAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,500.0000 4,500.00 0.000 0 002 TIME-RELATED OVERHEAD (WDAY) WDAY 150.0000 18,000.00 23.000 3,450.00 23.000 3,450 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 29,000.0000 29,000.00 0.000 0 006 TRAFFIC CONTROL SYSTEM LS 180,000.0000 180,000.00 0.000 0 007 PORTABLE RADAR SPEED FEEDBACK SIGN EA 500.0000 4,000.00 0.000 0 SYSTEM DAY 008 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 5,000.0000 5,000.00 0.000 0 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,000.0000 4,000.00 0.000 0 010 JOB SITE MANAGEMENT LS 10,999.4000 10,999.40 0.000 0 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 0.500 1,250.00 0.500 1,250 012 STREET SWEEPING LS 2,000.0000 2,000.00 0.000 0 013 TEMPORARY CONCRETE WASHOUT LS 8,500.0000 8,500.00 0.750 6,375.00 0.750 6,375 014 REMOVE YELLOW THERMOPLASTIC PAVEMENT SQFT 7.2000 14,472.00 0.000 0 MARKING (HAZARDOUS WASTE) 015 HOT MIX ASPHALT (TYPE A) TON 2,160.0000 142,560.00 0.000 0 016 TACK COAT TON 240.0000 48.00 0.000 0 017 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 36.5600 31,441.60 0.000 0 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 40.0000 300.00 0.000 0 (0.063"-UNFRAMED) 019 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 350.0000 350.00 0.000 0 METHOD) 020 THERMOPLASTIC PAVEMENT MARKING SQFT 9.0000 279,000.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 021 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.6000 73,800.00 0.000 0 022 RADAR SPEED FEEDBACK SIGN SYSTEMS LS 35,000.0000 35,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/18/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3J1304 TIME 09:55 AM ESTIMATE NO. 001 BID OPENING 10/13/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/22 R.E. NAME: BEHNIWAL NACHHATAR (NEIL) DATE OF THIS ESTIMATE 03/18/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 1,226,551.0000 1,226,551.00 0.148 181,529.55 0.148 181,529 PROGRAM CAS145 PAGE 3 DATE 03/18/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3J1304 TIME 09:55 AM ESTIMATE NO. 001 BID OPENING 10/13/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/22 R.E. NAME: BEHNIWAL NACHHATAR (NEIL) DATE OF THIS ESTIMATE 03/18/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 192,604.55 192,604.55 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 192,604.55 192,604.55 024 MOBILIZATION LS 140,000.0000 140,000.00 0.500 70,000.00 0.500 70,000 ORIGINAL CONTRACT AMOUNT 2,222,022.00 TOTAL WORK COMPLETED 262,604.55 262,604.55 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 262,604.55 262,604.55 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/18/21 120 02/14/22 02/14/22 08/04/22 120 0 0 0 12% 100% PROGRESS UNSATISFACTORY BEHNIWAL NACHHATAR (NEIL) RESIDENT ENGINEER PROGRAM CAS145 DATE 03/18/22