PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/17/22 EST. NO. 006 TIME 12:11 PM R.E. NAME: MUKHERJEE, RABINDRA 04-3K3204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 38,500.00 E.W. @ L.S.(+) 111622 N RE 1 0 002 0001 98,300.00 E.W. @ L.S.(+) 111622 N RE 1 0 136,800.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 136,800.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/17/22 EST. NO. 006 TIME 12:11 PM R.E. NAME: MUKHERJEE, RABINDRA 04-3K3204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 029 -2,692.11 001 OVERBID ITEM NO. 029 -141.69 003 OVERBID ITEM NO. 029 2,833.80 005 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 11/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3K3204 TIME 12:11 PM ESTIMATE NO. 006 BID OPENING 08/24/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/23/22 R.E. NAME: MUKHERJEE, RABINDRA DATE OF THIS ESTIMATE 11/17/22 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 04-CC-4 ---------------------------------- NORCAL GENERAL CONSTRUCTION IN CONTRA COSTA COUNTY, ON ROUTES CORPORATION 4, 24, 80, 242, 580, AND 680 AT 751 MABURY RD VARIOUS LOCATIONS. SAN JOSE, CA 95133 FED. AID NO. B1NH-X103(35)E REPAIR AND REPLACE EXISTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 100.0000 10,000.00 100.000 10,000 003 CONSTRUCTION AREA SIGNS LS 1,500.0000 1,500.00 1.000 1,500 004 TRAFFIC CONTROL SYSTEM LS 208,800.0000 208,800.00 1.000 208,800 005 PORTABLE RADAR SPEED FEEDBACK SIGN EA 60.0000 18,000.00 21.000 1,260.00 300.000 18,000 SYSTEM DAY 006 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 007 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.950 4,750 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 1.000 1,500 009 TEMPORARY COVER SQYD 10.0000 6,800.00 0.000 0 010 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 600.00 2.000 600 011 TEMPORARY FIBER ROLL LF 4.0000 4,080.00 0.000 0 012 STREET SWEEPING LS 4,000.0000 4,000.00 1.000 4,000 013 TEMPORARY CONCRETE WASHOUT LS 4,000.0000 4,000.00 1.000 4,000 014 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 500.0000 1,000.00 2.000 1,000 015 HYDROMULCH SQFT 0.2800 1,904.00 9,000.000 2,520 016 FIBER ROLLS LF 3.6000 4,896.00 275.000 990.00 1,895.000 6,822 017 HOT MIX ASPHALT (TYPE A) TON 1,000.0000 7,000.00 11.990 11,990 018 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 15.0000 12,000.00 808.000 12,120 019 REMOVE ASPHALT CONCRETE DIKE LF 10.0000 8,000.00 800.000 8,000 020 GUARD RAILING DELINEATOR EA 20.0000 960.00 42.000 840 021 MIDWEST GUARDRAIL SYSTEM LF 50.0000 50,500.00 885.000 44,250 022 VEGETATION CONTROL (MINOR CONCRETE) SQYD 150.0000 67,500.00 395.000 59,250 PROGRAM CAS145 PAGE 2 DATE 11/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3K3204 TIME 12:11 PM ESTIMATE NO. 006 BID OPENING 08/24/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/23/22 R.E. NAME: MUKHERJEE, RABINDRA DATE OF THIS ESTIMATE 11/17/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,500.0000 12,000.00 7.000 10,500 024 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,000.0000 40,000.00 7.000 35,000 025 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 SYSTEM ELEMENTS DURING CONSTRUCTION 026 MODIFYING TRAFFIC MONITORING STATIONS LS 651,622.0000 651,622.00 1.000 651,622 027 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 028 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 1,000.0000 12,000.00 5.000 5,000 PROGRAM CAS145 PAGE 3 DATE 11/17/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3K3204 TIME 12:11 PM ESTIMATE NO. 006 BID OPENING 08/24/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/23/22 R.E. NAME: MUKHERJEE, RABINDRA DATE OF THIS ESTIMATE 11/17/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,250.00 1,110,064.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 136,800.00 136,800.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 139,050.00 1,246,864.00 029 MOBILIZATION LS 130,000.0000 130,000.00 1.000 130,000 ORIGINAL CONTRACT AMOUNT 1,271,662.00 TOTAL WORK COMPLETED 139,050.00 1,376,864.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 139,050.00 1,376,864.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 029 MOBILIZATION 127,166.20 130,000.00 2,833.80 DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/05/21 100 03/28/22 04/04/22 09/23/22 100 34 0 0 100% 100% MUKHERJEE, RABINDRA RESIDENT ENGINEER