PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/18/25 EST. NO. 004 TIME 12:52 PM R.E. NAME: FARSIPOUR NAGHIBI, SINA 04-3Q6004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/18/25 EST. NO. 004 TIME 12:52 PM R.E. NAME: FARSIPOUR NAGHIBI, SINA 04-3Q6004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/18/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Q6004 TIME 12:52 PM ESTIMATE NO. 004 BID OPENING 06/01/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/25 R.E. NAME: FARSIPOUR NAGHIBI, SINA DATE OF THIS ESTIMATE 04/18/25 LOCATION PROGRESS ESTIMATE 04-SCL-101-R0.7/R19.2 ----------------- TRUESDELL CORPORATION OF SANTA CLARA COUNTY AT VARIOUS LOCATIONS CALIFORNIA, INC. 1310 W. 23RD STREET TEMPE AZ 85282 FED. AID NO. N O N E PLACE POLYESTER CONCRETE OVERLAY AND REMOV ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 TIME-RELATED OVERHEAD (LS) LS 130,000.0000 130,000.00 1.000 130,000 003 CONSTRUCTION AREA SIGNS LS 32,000.0000 32,000.00 1.000 32,000 004 TRAFFIC CONTROL SYSTEM LS 240,000.0000 240,000.00 1.000 240,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 125.0000 17,500.00 140.000 17,500 006 PORTABLE RADAR SPEED FEEDBACK SIGN EA 850.0000 12,750.00 15.000 12,750 SYSTEM DAY 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 3,000.0000 15,000.00 5.000 15,000 008 JOB SITE MANAGEMENT LS 8,000.0000 8,000.00 1.000 8,000 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 1.000 5,000 010 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 1,500.00 5.000 1,500 011 TEMPORARY CONCRETE WASHOUT LS 1,300.0000 1,300.00 1.000 1,300 012 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 7.2500 25,302.50 3,490.000 25,302 STRIPE (HAZARDOUS WASTE) 013 HOT MIX ASPHALT (TYPE A) TON 2,100.0000 71,400.00 42.500 89,250 014 TACK COAT TON 2,500.0000 750.00 0.300 750 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 26.0000 14,820.00 680.000 17,680 016 GRIND EXISTING BRIDGE DECK SQYD 20.0000 39,640.00 1,982.000 39,640 017 TEMPORARY DECKING LS 1,000.0000 1,000.00 1.000 1,000 018 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 8,200.0000 65,600.00 8.000 65,600 019 CLEAN EXPANSION JOINT LF 43.0000 24,080.00 560.000 24,080 020 JOINT SEAL (MR 2") LF 112.0000 11,648.00 104.000 11,648 021 BONDED JOINT SEAL (MR 2") LF 83.0000 37,848.00 456.000 37,848 022 PUBLIC SAFETY PLAN LS 18,000.0000 18,000.00 1.000 18,000 PROGRAM CAS145 PAGE 2 DATE 04/18/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Q6004 TIME 12:52 PM ESTIMATE NO. 004 BID OPENING 06/01/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/25 R.E. NAME: FARSIPOUR NAGHIBI, SINA DATE OF THIS ESTIMATE 04/18/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RAPID SETTING CONCRETE (PATCH) CF 145.0000 56,695.00 0.000 0 024 REPAIR SPALLED SURFACE AREA (FIBER SQFT 500.0000 59,500.00 163.140 81,570 REINFORCED FILLER) 025 REMOVE UNSOUND CONCRETE CF 110.0000 43,010.00 0.000 0 026 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3500 53,600.40 154,103.000 53,936 027 FURNISH POLYESTER CONCRETE OVERLAY CF 83.0000 860,544.00 8,839.000 733,637 028 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.5000 529,645.50 117,699.000 529,645 (F) 029 TREAT BRIDGE DECK SQFT 0.3500 12,741.40 36,404.000 12,741 (F) 030 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 85.0000 38,165.00 449.000 38,165 031 REMOVE CHIP SEAL SQFT 5.2500 9,450.00 1,800.000 9,450 032 SOFFIT ACCESS DOOR ASSEMBLY EA 4,100.0000 4,100.00 1.000 4,100 033 BRIDGE REMOVAL (PORTION), LOCATION A LS 9,000.0000 9,000.00 1.000 9,000 034 BRIDGE REMOVAL (PORTION), LOCATION B LS 50,000.0000 50,000.00 1.000 50,000 035 BRIDGE REMOVAL (PORTION), LOCATION C LS 77,000.0000 77,000.00 1.000 77,000 036 PAINT BRIDGE IDENTIFICATION EA 350.0000 2,450.00 7.000 2,450 037 REMOVE SLOPE PAVING (LS) LS 9,500.0000 9,500.00 1.000 9,500 038 SLOPE PAVING (CONCRETE) CY 9,500.0000 9,500.00 1.000 9,500 039 REMOVE PAVEMENT MARKER EA 11.0000 2,860.00 260.000 2,860 040 PAVEMENT MARKER (RETROREFLECTIVE) EA 16.0000 4,160.00 260.000 4,160 041 CONCRETE BARRIER (PORTION) LF 6,000.0000 12,000.00 2.000 12,000 042 RECONSTRUCT METAL RAILING (BRIDGE) LF 650.0000 13,000.00 20.000 13,000 043 THERMOPLASTIC PAVEMENT MARKING SQFT 43.0000 5,160.00 120.000 5,160 044 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 4.2500 22,865.00 5,380.000 22,865 045 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 39.0000 3,393.00 87.000 3,393 046 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 14.5000 50,605.00 804.000 11,658.00 4,294.000 62,263 047 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 17.5000 74,725.00 24.000 420.00 4,294.000 75,145 (WARRANTY) 048 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 6.2500 27,812.50 204.000 1,275.00 4,654.000 29,087 (WARRANTY) (BROKEN 36-12) PROGRAM CAS145 PAGE 3 DATE 04/18/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Q6004 TIME 12:52 PM ESTIMATE NO. 004 BID OPENING 06/01/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/25 R.E. NAME: FARSIPOUR NAGHIBI, SINA DATE OF THIS ESTIMATE 04/18/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 13,353.00 2,649,476.95 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 13,353.00 2,649,476.95 049 MOBILIZATION LS 273,472.7000 273,472.70 1.000 273,472 ORIGINAL CONTRACT AMOUNT 3,093,093.00 TOTAL WORK COMPLETED 13,353.00 2,922,949.65 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 13,353.00 2,922,949.65 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/25/23 160 08/09/23 08/09/23 02/07/25 160 264 0 0 93% 100% PROGRESS IS SATISFACTORY *** SUSPENDED ON 04/01/24. FARSIPOUR NAGHIBI, SINA RESIDENT ENGINEER