PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/21/08 EST. NO.01 TIME 10:18 AM R.E. NAME: SANGALANG, RONALD 04-3S6804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/21/08 EST. NO.01 TIME 10:18 AM R.E. NAME: SANGALANG, RONALD 04-3S6804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S6804 TIME 10:18 AM ESTIMATE NO. 01 BID OPENING 12/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/08 R.E. NAME: SANGALANG, RONALD DATE OF THIS ESTIMATE 03/21/08 LOCATION PROGRESS ESTIMATE 04-SOL-12-2.0/2.0 ----------------- BAY CITIES PAVING & GRADING IN SOLANO COUNTY IN FAIRFIELD AT P. O. BOX 6227 CHADBOURNE ROAD UNDERCROSSING CONCORD, CA 94524 FED. AID NO. ACST-43D1(4)E ,P-43D1(4)E REPAIR SLIPOUT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 725.0000 725.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 715.0000 715.00 0.750 536.25 0.750 536.25 PROGRAM 03 TEMPORARY COVER M2 2.5000 1,550.00 0.000 0.00 04 TEMPORARY CHECK DAM M 11.0000 330.00 0.000 0.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 165.0000 495.00 0.000 0.00 06 STREET SWEEPING LS 3,500.0000 3,500.00 0.000 0.00 07 CONSTRUCTION AREA SIGNS LS 704.0000 704.00 0.700 492.80 0.700 492.80 S) 08 TRAFFIC CONTROL SYSTEM LS 14,885.0000 14,885.00 0.000 0.00 S) 09 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,320.0000 1,320.00 0.000 0.00 S) 10 ROADWAY EXCAVATION M3 27.0000 11,070.00 0.000 0.00 11 IMPORTED BORROW M3 76.5000 9,945.00 0.000 0.00 12 GEOSYNTHETIC REINFORCEMENT MATERIAL M2 73.7000 25,795.00 0.000 0.00 13 EROSION CONTROL (TYPE D) M2 2.1000 7,728.00 0.000 0.00 S) 14 FIBER ROLLS M 21.4500 6,220.50 0.000 0.00 S) 15 ASPHALT CONCRETE (TYPE A) TONN 136.7500 15,042.50 0.000 0.00 16 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 144.2500 2,885.00 0.000 0.00 17 MINOR CONCRETE (MINOR STRUCTURE) M3 3,287.5000 6,903.75 0.000 0.00 SF) 18 300 MM PLASTIC PIPE M 91.0000 1,820.00 0.000 0.00 19 450 MM CORRUGATED STEEL PIPE M 186.0000 799.80 0.000 0.00 (2.77 MM THICK) 20 300 MM STEEL FLARED END SECTION EA 95.7000 95.70 0.000 0.00 21 450 MM STEEL FLARED END SECTION EA 136.5000 273.00 0.000 0.00 22 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 290.0000 1,740.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S6804 TIME 10:18 AM ESTIMATE NO. 01 BID OPENING 12/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/08 R.E. NAME: SANGALANG, RONALD DATE OF THIS ESTIMATE 03/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROCK SLOPE PROTECTION FABRIC M2 19.0000 456.00 0.000 0.00 24 MISCELLANEOUS IRON AND STEEL KG 2.4500 1,087.80 0.000 0.00 SF) PROGRAM CAS145 PAGE 3 DATE 03/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S6804 TIME 10:18 AM ESTIMATE NO. 01 BID OPENING 12/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/08 R.E. NAME: SANGALANG, RONALD DATE OF THIS ESTIMATE 03/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 1,029.05 1,029.05 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 1,029.05 1,029.05 ORIGINAL CONTRACT AMOUNT 116,086.05 TOTAL WORK COMPLETED 1,029.05 1,029.05 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,029.05 1,029.05 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/15/08 25 00/00/00 00/00/00 05/27/08 19 0 0 19 1% 0% PROGRESS IS SATISFACTORY PROJECT SUSPENDING *** SUSPENDED ON 02/25/08. SANGALANG, RONALD RESIDENT ENGINEER PROGRAM CAS145 PAGE 4 DATE 03/21/08