PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/19/08 EST. NO.02 TIME 07:54 AM R.E. NAME: SANGLANG, RONALD 04-3S6804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/19/08 EST. NO.02 TIME 07:54 AM R.E. NAME: SANGLANG, RONALD 04-3S6804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S6804 TIME 07:54 AM ESTIMATE NO. 02 BID OPENING 12/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: SANGLANG, RONALD DATE OF THIS ESTIMATE 04/19/08 LOCATION PROGRESS ESTIMATE 04-SOL-12-2.0/2.0 ----------------- BAY CITIES PAVING AND GRADING IN SOLANO COUNTY IN FAIRFIELD AT 5029 FORNI DRIVE CHADBOURNE ROAD UNDERCROSSING CONCORD, CA FED. AID NO. ACST-43D1(4)E ,P-43D1(4)E REPAIR SLIPOUT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 725.0000 725.00 0.160 116.00 0.160 116.00 02 PREPARE WATER POLLUTION CONTROL LS 715.0000 715.00 0.250 178.75 1.000 715.00 PROGRAM 03 TEMPORARY COVER M2 2.5000 1,550.00 0.000 0.00 04 TEMPORARY CHECK DAM M 11.0000 330.00 0.000 0.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 165.0000 495.00 0.000 0.00 06 STREET SWEEPING LS 3,500.0000 3,500.00 0.000 0.00 07 CONSTRUCTION AREA SIGNS LS 704.0000 704.00 0.700 492.80 S) 08 TRAFFIC CONTROL SYSTEM LS 14,885.0000 14,885.00 0.160 2,381.60 0.160 2,381.60 S) 09 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,320.0000 1,320.00 0.000 0.00 S) 10 ROADWAY EXCAVATION M3 27.0000 11,070.00 260.000 7,020.00 260.000 7,020.00 11 IMPORTED BORROW M3 76.5000 9,945.00 80.000 6,120.00 80.000 6,120.00 12 GEOSYNTHETIC REINFORCEMENT MATERIAL M2 73.7000 25,795.00 0.000 0.00 13 EROSION CONTROL (TYPE D) M2 2.1000 7,728.00 0.000 0.00 S) 14 FIBER ROLLS M 21.4500 6,220.50 0.000 0.00 S) 15 ASPHALT CONCRETE (TYPE A) TONN 136.7500 15,042.50 0.000 0.00 16 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 144.2500 2,885.00 0.000 0.00 17 MINOR CONCRETE (MINOR STRUCTURE) M3 3,287.5000 6,903.75 1.380 4,536.75 1.380 4,536.75 SF) 18 300 MM PLASTIC PIPE M 91.0000 1,820.00 18.600 1,692.60 18.600 1,692.60 19 450 MM CORRUGATED STEEL PIPE M 186.0000 799.80 2.000 372.00 2.000 372.00 (2.77 MM THICK) 20 300 MM STEEL FLARED END SECTION EA 95.7000 95.70 1.000 95.70 1.000 95.70 21 450 MM STEEL FLARED END SECTION EA 136.5000 273.00 1.000 136.50 1.000 136.50 22 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 290.0000 1,740.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 04/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S6804 TIME 07:54 AM ESTIMATE NO. 02 BID OPENING 12/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: SANGLANG, RONALD DATE OF THIS ESTIMATE 04/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROCK SLOPE PROTECTION FABRIC M2 19.0000 456.00 16.000 304.00 16.000 304.00 24 MISCELLANEOUS IRON AND STEEL KG 2.4500 1,087.80 148.000 362.60 148.000 362.60 SF) PROGRAM CAS145 PAGE 3 DATE 04/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S6804 TIME 07:54 AM ESTIMATE NO. 02 BID OPENING 12/05/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: SANGLANG, RONALD DATE OF THIS ESTIMATE 04/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 23,316.50 24,345.55 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 23,316.50 24,345.55 ORIGINAL CONTRACT AMOUNT 116,086.05 TOTAL WORK COMPLETED 23,316.50 24,345.55 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 23,316.50 24,345.55 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/15/08 25 00/00/00 04/15/08 05/27/08 4 0 0 20 21% 64% PROGRESS IS SATISFACTORY SUSPENSION LIFTED SANGLANG, RONALD RESIDENT ENGINEER PROGRAM CAS145 PAGE 4 DATE 04/19/08