PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/23/08 EST. NO.03 TIME 02:35 PM R.E. NAME: MANGLO PERPETUO 04-3S7004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/23/08 EST. NO.03 TIME 02:35 PM R.E. NAME: MANGLO PERPETUO 04-3S7004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S7004 TIME 02:35 PM ESTIMATE NO. 03 BID OPENING 01/08/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/08 R.E. NAME: MANGLO PERPETUO DATE OF THIS ESTIMATE 07/23/08 LOCATION RERUN PROGRESS ESTIMATE 04-SOL-80-27.0/27.0 ----------------------- 04-SOL-80-R28.1/R28.1 SITEWORKS CONSTRUCTION,INC IN SOLANO COUNTY IN VACAVILLE FROM 2201 OAKVALE ROAD 0.3 KM WEST OF ALLISON DRIVE WALNUT CREEK, CA 94587 OVERCROSSING TO ALLISON DRIVE OVERCROSSING FED. AID NO. ACST-43D3(4)E ,P-43D3(4)E REPAIR STORM WATER DAMAGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 1,676.8000 1,676.80 0.050 83.84 1.000 1,676.80 02 PREPARE WATER POLLUTION CONTROL LS 6,026.0000 6,026.00 1.000 6,026.00 PROGRAM 03 TEMPORARY SILT FENCE M 8.1900 1,801.80 60.000 491.40 04 TEMPORARY DRAINAGE INLET PROTECTION EA 131.0000 262.00 3.000 393.00 05 STREET SWEEPING LS 1,572.0000 1,572.00 0.500 786.00 1.000 1,572.00 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,247.1200 1,247.12 1.000 1,247.12 07 CONSTRUCTION AREA SIGNS LS 2,829.6000 2,829.60 1.000 2,829.60 S) 08 TRAFFIC CONTROL SYSTEM LS 17,157.4500 17,157.45 0.100 1,715.75 1.000 17,157.45 S) 09 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,651.4400 2,651.44 0.250 662.86 1.000 2,651.44 S) 10 REMOVE ASPHALT CONCRETE DIKE M 13.8200 2,349.40 153.000 2,114.46 11 REMOVE PIPE M 171.4400 3,428.80 18.500 3,171.64 12 REMOVE INLET EA 1,446.2400 1,446.24 1.000 1,446.24 13 RECONSTRUCT CHAIN LINK FENCE M 180.7800 2,892.48 0.000 0.00 14 CLEARING AND GRUBBING LS 8,245.1600 8,245.16 1.000 8,245.16 15 ROADWAY EXCAVATION M3 10.1400 27,175.20 180.000 1,825.20 2,680.000 27,175.20 16 STRUCTURE BACKFILL (SLURRY CEMENT) M3 108.4700 10,087.71 104.400 11,324.27 17 GEOSYNTHETIC REINFORCED EMBANKMENT M2 30.0300 66,066.00 1,670.000 50,150.10 18 IMPORTED BORROW M3 21.5400 12,924.00 191.000 4,114.14 191.000 4,114.14 19 EROSION CONTROL (TYPE D) M2 0.9900 6,375.60 4,164.000 4,122.36 4,164.000 4,122.36 S) 20 EROSION CONTROL (NETTING) M2 2.1500 7,353.00 3,632.000 7,808.80 3,632.000 7,808.80 21 FIBER ROLLS M 6.1700 3,825.40 770.000 4,750.90 770.000 4,750.90 S) 22 ASPHALT CONCRETE TONN 155.8800 13,249.80 75.000 11,691.00 PROGRAM CAS145 PAGE 2 DATE 07/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S7004 TIME 02:35 PM ESTIMATE NO. 03 BID OPENING 01/08/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/08 R.E. NAME: MANGLO PERPETUO DATE OF THIS ESTIMATE 07/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 58.8700 10,007.90 153.000 9,007.11 24 MINOR CONCRETE (MINOR STRUCTURE) M3 763.2900 2,289.87 3.000 2,289.87 25 450 MM PLASTIC PIPE M 154.5100 26,266.70 164.200 25,370.54 26 450 MM CORRUGATED PLASTIC PIPE DOWNDRAIN M 247.8600 4,213.62 17.000 4,213.62 27 450 MM PLASTIC FLARED END SECTION EA 180.7800 180.78 1.000 180.78 28 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 421.8200 843.64 2.600 1,096.73 29 ROCK SLOPE PROTECTION FABRIC M2 33.1400 265.12 8.000 265.12 30 MINOR CONCRETE (MISCELLANEOUS M3 832.4200 17,480.82 23.000 19,145.66 CONSTRUCTION) 31 MISCELLANEOUS IRON AND STEEL KG 6.0500 3,388.00 551.000 3,333.55 S) 32 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,387.8200 3,387.82 1.000 3,387.82 S) SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 07/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3S7004 TIME 02:35 PM ESTIMATE NO. 03 BID OPENING 01/08/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/08 R.E. NAME: MANGLO PERPETUO DATE OF THIS ESTIMATE 07/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 25,869.85 238,449.88 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 10,000.00 SUBTOTAL AMOUNT EARNED 25,869.85 248,449.88 ORIGINAL CONTRACT AMOUNT 268,967.27 TOTAL WORK COMPLETED 25,869.85 248,449.88 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 25,869.85 248,449.88 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/04/08 35 04/15/07 04/16/08 08/01/98 35 24 7 0 85% 83% PROGRESS IS SATISFACTORY MANGLO PERPETUO RESIDENT ENGINEER PROGRAM CAS145 DATE 07/23/08