PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/19/26 EST. NO. 001 TIME 09:31 AM R.E. NAME: SHAFIEIFAR, MOHAMADREZA 04-3Y6004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/19/26 EST. NO. 001 TIME 09:31 AM R.E. NAME: SHAFIEIFAR, MOHAMADREZA 04-3Y6004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/19/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6004 TIME 09:31 AM ESTIMATE NO. 001 BID OPENING 04/16/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: SHAFIEIFAR, MOHAMADREZA DATE OF THIS ESTIMATE 08/19/26 LOCATION PROGRESS ESTIMATE 04-SCL-680-M1.1/M7.0 ----------------- FBD VANGUARD CONSTRUCTION, SANTA CLARA COUNTY IN SAN JOSE AND INC. MILPITAS AT VARIOUS LOCATIONS FROM JACKSON 550 GREENVILLE ROAD AVENUE UNDERCROSSING TO YOSEMITE DRIVE LIVERMORE CA 94550 OVERCROSSING FED. AID NO. N O N E PLACE POLYESTER CONCRETE OVERLAY. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.000 0 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,500.0000 75,000.00 28.000 42,000.00 28.000 42,000 003 CONSTRUCTION AREA SIGNS LS 22,000.0000 22,000.00 0.700 15,400.00 0.700 15,400 004 TRAFFIC CONTROL SYSTEM LS 80,200.0000 80,200.00 0.000 0 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 500.0000 9,000.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,000.0000 7,000.00 0.000 0 007 JOB SITE MANAGEMENT LS 3,800.0000 3,800.00 0.560 2,128.00 0.560 2,128 008 WATER POLLUTION CONTROL PROGRAM LS 1,300.0000 1,300.00 0.000 0 009 TEMPORARY DRAINAGE INLET PROTECTION EA 400.0000 1,200.00 0.000 0 010 STREET SWEEPING LS 2,500.0000 2,500.00 0.000 0 011 TEMPORARY CONCRETE WASHOUT LS 750.0000 750.00 0.000 0 012 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 4.5000 3,780.00 0.000 0 STRIPE (HAZARDOUS WASTE) 013 HOT MIX ASPHALT (TYPE A) TON 670.0000 35,510.00 0.000 0 014 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 25.0000 13,250.00 0.000 0 015 GRIND EXISTING BRIDGE DECK SQYD 150.0000 1,200.00 0.000 0 016 CLEAN EXPANSION JOINT LF 55.0000 5,830.00 0.000 0 017 JOINT SEAL (MR 1") LF 92.0000 9,752.00 0.000 0 018 PUBLIC SAFETY PLAN LS 7,500.0000 7,500.00 0.000 0 019 RAPID SETTING CONCRETE (PATCH) CF 120.0000 11,160.00 0.000 0 020 REPAIR SPALLED SURFACE AREA (FIBER SQFT 110.0000 5,280.00 0.000 0 REINFORCED FILLER) 021 REMOVE UNSOUND CONCRETE CF 75.0000 6,975.00 0.000 0 022 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.5000 18,134.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/19/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6004 TIME 09:31 AM ESTIMATE NO. 001 BID OPENING 04/16/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: SHAFIEIFAR, MOHAMADREZA DATE OF THIS ESTIMATE 08/19/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH POLYESTER CONCRETE OVERLAY CF 90.0000 326,520.00 3,628.000 326,520.00 3,628.000 326,520 024 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.0000 108,804.00 0.000 0 (F) 025 SOFFIT ACCESS DOOR ASSEMBLY EA 3,000.0000 24,000.00 0.000 0 026 PAINT BRIDGE IDENTIFICATION EA 550.0000 2,750.00 0.000 0 027 MINOR CONCRETE (GUTTER) (LF) LF 80.0000 12,000.00 0.000 0 028 REMOVE CONCRETE (CURB AND GUTTER) LF 55.0000 8,250.00 0.000 0 029 REMOVE PAVEMENT MARKER EA 7.0000 2,310.00 0.000 0 030 PAVEMENT MARKER (RETROREFLECTIVE) EA 28.0000 4,480.00 0.000 0 031 REMOVE ROADSIDE SIGN (STRAP AND SADDLE EA 85.0000 255.00 0.000 0 BRACKET METHOD) 032 REMOVE ROADSIDE SIGN PANEL EA 85.0000 85.00 0.000 0 033 REMOVE SIGN PANEL FROM STRUCTURE EA 280.0000 280.00 0.000 0 034 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 1,980.00 0.000 0 (0.063"-UNFRAMED) 035 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 29.0000 870.00 0.000 0 (0.080"-UNFRAMED) 036 ROADSIDE SIGN - ONE POST EA 429.0000 858.00 0.000 0 037 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 140.0000 420.00 0.000 0 METHOD) 038 INSTALL SIGN PANEL ON EXISTING STRUCTURE EA 840.0000 840.00 0.000 0 (EA) 039 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 80.0000 80.00 0.000 0 POST 040 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 60.0000 12,600.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 041 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.4000 4,182.00 0.000 0 042 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 23.0000 1,656.00 0.000 0 043 8" TRAFFIC STRIPE TAPE (WARRANTY) LF 172.0000 4,472.00 0.000 0 (BROKEN 12-3) 044 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 17.0000 5,440.00 0.000 0 (WARRANTY) (BROKEN 12-3) 045 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 17.0000 27,030.00 0.000 0 046 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 17.0000 4,420.00 0.000 0 (BROKEN 17-7) 047 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 177.0000 6,018.00 0.000 0 (BROKEN 8-4) 048 8" TRAFFIC STRIPE TAPE (WARRANTY) LF 17.0000 2,210.00 0.000 0 049 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 17.0000 15,300.00 0.000 0 (WARRANTY) PROGRAM CAS145 PAGE 3 DATE 08/19/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6004 TIME 09:31 AM ESTIMATE NO. 001 BID OPENING 04/16/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: SHAFIEIFAR, MOHAMADREZA DATE OF THIS ESTIMATE 08/19/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 20.0000 15,000.00 0.000 0 (WARRANTY) (BROKEN 17-7) 051 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 40.0000 1,840.00 0.000 0 (WARRANTY) (BROKEN 8-4) 052 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 20.0000 1,580.00 0.000 0 (WARRANTY) PROGRAM CAS145 PAGE 4 DATE 08/19/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6004 TIME 09:31 AM ESTIMATE NO. 001 BID OPENING 04/16/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: SHAFIEIFAR, MOHAMADREZA DATE OF THIS ESTIMATE 08/19/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 386,048.00 386,048.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 386,048.00 386,048.00 053 MOBILIZATION LS 90,349.0000 90,349.00 0.950 85,831.55 0.950 85,831 ORIGINAL CONTRACT AMOUNT 1,012,000.00 TOTAL WORK COMPLETED 471,879.55 471,879.55 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 471,879.55 471,879.55 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/26/26 50 07/13/26 07/13/26 11/30/26 28 0 0 0 47% 56% PROGRESS IS SATISFACTORY SHAFIEIFAR, MOHAMADREZA RESIDENT ENGINEER