PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/15/26 EST. NO. 001 TIME 03:34 PM R.E. NAME: SAFI, SAEED 04-3Y6104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/15/26 EST. NO. 001 TIME 03:34 PM R.E. NAME: SAFI, SAEED 04-3Y6104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/15/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6104 TIME 03:34 PM ESTIMATE NO. 001 BID OPENING 05/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: SAFI, SAEED DATE OF THIS ESTIMATE 10/15/26 LOCATION PROGRESS ESTIMATE 04-VAR ----------------- FBD VANGUARD CONSTRUCTION, ALAMEDA COUNTY AT VARIOUS LOCATIONS INC. 550 GREENVILLE ROAD LIVERMORE CA 94550 FED. AID NO. N O N E PLACE POLYESTER CONCRETE OVERLAY, HMA, AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,500.0000 135,000.00 50.000 75,000.00 50.000 75,000 003 CONSTRUCTION AREA SIGNS LS 69,510.7100 69,510.71 0.700 48,657.50 0.700 48,657 004 TRAFFIC CONTROL SYSTEM LS 300,000.0000 300,000.00 0.500 150,000.00 0.500 150,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 450.0000 12,150.00 12.000 5,400.00 12.000 5,400 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 150.0000 4,050.00 12.000 1,800.00 12.000 1,800 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,500.0000 7,500.00 0.500 3,750.00 0.500 3,750 008 JOB SITE MANAGEMENT LS 8,000.0000 8,000.00 0.500 4,000.00 0.500 4,000 009 WATER POLLUTION CONTROL PROGRAM LS 1,300.0000 1,300.00 1.000 1,300.00 1.000 1,300 010 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 10,500.00 0.000 0 011 STREET SWEEPING LS 7,500.0000 7,500.00 0.500 3,750.00 0.500 3,750 012 TEMPORARY CONCRETE WASHOUT LS 2,000.0000 2,000.00 0.500 1,000.00 0.500 1,000 013 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 9.0000 46,080.00 0.000 0 STRIPE (HAZARDOUS WASTE) 014 NOISE MONITORING LS 9,250.0000 9,250.00 0.000 0 015 HOT MIX ASPHALT (TYPE A) TON 900.0000 74,700.00 0.000 0 016 HOT MIX ASPHALT (BRIDGE) TON 389.0000 115,922.00 0.000 0 017 TACK COAT TON 3,000.0000 3,600.00 0.000 0 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 20.0000 16,600.00 0.000 0 019 GRIND EXISTING BRIDGE DECK SQYD 30.0000 16,080.00 536.000 16,080.00 536.000 16,080 020 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 9,150.0000 18,300.00 0.000 0 021 DRILL AND BOND DOWEL LF 120.0000 11,880.00 0.000 0 022 CLEAN EXPANSION JOINT LF 30.0000 28,230.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/15/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6104 TIME 03:34 PM ESTIMATE NO. 001 BID OPENING 05/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: SAFI, SAEED DATE OF THIS ESTIMATE 10/15/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 JOINT SEAL (MR 1/2") LF 85.0000 14,960.00 0.000 0 024 JOINT SEAL (MR 1") LF 125.0000 51,000.00 0.000 0 025 BONDED JOINT SEAL (MR 1") LF 97.0000 34,629.00 0.000 0 026 BAR REINFORCING STEEL (BRIDGE) LB 1.4000 22.40 0.000 0 (F) 027 PUBLIC SAFETY PLAN LS 4,000.0000 4,000.00 0.000 0 028 RAPID SETTING CONCRETE (PATCH) CF 100.0000 41,200.00 99.000 9,900.00 99.000 9,900 029 REPAIR SPALLED SURFACE AREA SQFT 100.0000 3,200.00 0.000 0 030 REPAIR SPALLED SURFACE AREA (FIBER SQFT 140.0000 2,660.00 0.000 0 REINFORCED FILLER) 031 REMOVE ASPHALT CONCRETE SURFACING SQFT 2.0200 25,415.64 0.000 0 032 REMOVE UNSOUND CONCRETE CF 80.0000 32,960.00 99.000 7,920.00 99.000 7,920 033 POLYESTER CONCRETE EXPANSION DAM CF 240.0000 27,840.00 0.000 0 034 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2500 37,481.75 84,704.000 21,176.00 84,704.000 21,176 035 FURNISH POLYESTER CONCRETE OVERLAY CF 90.0000 748,440.00 8,316.000 748,440.00 8,316.000 748,440 036 PLACE POLYESTER CONCRETE OVERLAY SQFT 2.5000 207,900.00 83,160.000 207,900.00 83,160.000 207,900 (F) 037 TREAT BRIDGE DECK SQFT 0.5000 33,383.50 0.000 0 (F) 038 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 90.0000 67,140.00 0.000 0 039 BRIDGE REMOVAL (PORTION), LOCATION A LS 7,500.0000 7,500.00 0.000 0 040 BRIDGE REMOVAL (PORTION), LOCATION B LS 7,500.0000 7,500.00 0.000 0 041 FIBER REINFORCED POLYMER SYSTEM (GIRDER) SQFT 204.0000 36,516.00 0.000 0 042 REPLACE ACCESS DOOR EA 3,100.0000 6,200.00 0.000 0 043 PAINT BRIDGE IDENTIFICATION EA 469.0000 469.00 0.000 0 044 MISCELLANEOUS METAL (BRIDGE) LB 22.0000 8,668.00 0.000 0 (F) 045 REMOVE PAVEMENT MARKER EA 2.3000 1,104.00 0.000 0 046 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.0000 3,360.00 0.000 0 047 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 45.0000 13,050.00 0.000 0 WET NIGHT VISIBILITY) 048 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 4.6000 29,624.00 0.000 0 049 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 11.5000 3,335.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/15/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6104 TIME 03:34 PM ESTIMATE NO. 001 BID OPENING 05/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: SAFI, SAEED DATE OF THIS ESTIMATE 10/15/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 7.0000 5,460.00 0.000 0 (WARRANTY) (BROKEN 12-3) 051 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 9.0000 46,080.00 0.000 0 052 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 16.0000 77,920.00 0.000 0 (WARRANTY) 053 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 7.0000 336.00 0.000 0 (WARRANTY) (BROKEN 6-1) 054 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 7.0000 8,820.00 0.000 0 (WARRANTY) (BROKEN 17-7) 055 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 7.0000 7,350.00 0.000 0 (WARRANTY) (BROKEN 36-12) 056 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 22.0000 12,100.00 0.000 0 (WARRANTY) PROGRAM CAS145 PAGE 4 DATE 10/15/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-3Y6104 TIME 03:34 PM ESTIMATE NO. 001 BID OPENING 05/13/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: SAFI, SAEED DATE OF THIS ESTIMATE 10/15/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,311,073.50 1,311,073.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,311,073.50 1,311,073.50 057 MOBILIZATION LS 267,000.0000 267,000.00 0.950 253,650.00 0.950 253,650 ORIGINAL CONTRACT AMOUNT 2,777,777.00 TOTAL WORK COMPLETED 1,564,723.50 1,564,723.50 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,564,723.50 1,564,723.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/30/26 90 07/17/26 07/17/26 12/14/26 50 12 0 0 56% 56% PROGRESS IS SATISFACTORY PROGRESS IS SATISFACTORY SAFI, SAEED RESIDENT ENGINEER