PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/20/06 EST. NO.01 TIME 09:10 AM R.E. NAME: KURANI BHOOPEN 04-444904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/20/06 EST. NO.01 TIME 09:10 AM R.E. NAME: KURANI BHOOPEN 04-444904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-444904 TIME 09:10 AM ESTIMATE NO. 01 BID OPENING 09/20/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: KURANI BHOOPEN DATE OF THIS ESTIMATE 12/20/06 LOCATION PROGRESS ESTIMATE 04-ALA-680-R8.7/ .0 ----------------- 04-ALA-880-4.2/ .0 DE SILVA GATES CONSTRUCTION IN ALAMEDA COUNTY NEAR FREMONT AT 1155 DUBLIN BLVD. MISSION GRADE WEIGH STATION AND DUBLIN, CA 94568 NIMITZ WEIGHT STATION FED. AID NO. N O N E REHABILITATE PAVEMENT AND DRAINAGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 0.750 750.00 PROGRAM 02 WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.500 500.00 0.500 500.00 03 TEMPORARY GRAVEL BAG M 50.0000 1,600.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 2,000.0000 2,000.00 0.000 0.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 2,000.00 4.000 1,000.00 4.000 1,000.00 06 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 0.600 1,800.00 0.600 1,800.00 S) 07 TRAFFIC CONTROL SYSTEM LS 70,405.0000 70,405.00 0.500 35,202.50 0.500 35,202.50 S) 08 TYPE III BARRICADE EA 100.0000 500.00 5.000 500.00 5.000 500.00 S) 09 TRAFFIC PLASTIC DRUM EA 100.0000 1,000.00 10.000 1,000.00 10.000 1,000.00 S) 10 REMOVE ASPHALT CONCRETE DIKE M 3.0000 600.00 198.000 594.00 198.000 594.00 11 REMOVE PIPE M 500.0000 1,000.00 0.000 0.00 12 REMOVE PIPE INLET EA 1,000.0000 1,000.00 0.000 0.00 13 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.2500 58,950.00 23,917.000 53,813.25 23,917.000 53,813.25 S) 14 ROADWAY EXCAVATION M3 100.0000 6,500.00 78.500 7,850.00 78.500 7,850.00 15 ASPHALT CONCRETE (TYPE A) TONN 80.0000 320,000.00 2,719.000 217,520.00 2,719.000 217,520.00 16 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 100.0000 7,500.00 0.000 0.00 AREA) 17 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 12.0000 2,280.00 0.000 0.00 18 MINOR CONCRETE (MINOR STRUCTURE) M3 6,000.0000 3,000.00 0.000 0.00 F) 19 GRATED LINE DRAIN M 500.0000 8,000.00 0.000 0.00 20 MISCELLANEOUS IRON AND STEEL KG 6.0000 510.00 0.000 0.00 F) 21 THERMOPLASTIC PAVEMENT MARKING M2 32.0000 13,120.00 0.000 0.00 S) 22 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 8,440.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 12/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-444904 TIME 09:10 AM ESTIMATE NO. 01 BID OPENING 09/20/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: KURANI BHOOPEN DATE OF THIS ESTIMATE 12/20/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 200 MM THERMOPLASTIC TRAFFIC STRIPE M 7.0000 1,400.00 0.000 0.00 S) 24 100 MM THERMOPLASTIC TRAFFIC STRIPE M 3.0000 1,110.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 25 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 600.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 12/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-444904 TIME 09:10 AM ESTIMATE NO. 01 BID OPENING 09/20/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/06 R.E. NAME: KURANI BHOOPEN DATE OF THIS ESTIMATE 12/20/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 320,529.75 320,529.75 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 320,529.75 320,529.75 ORIGINAL CONTRACT AMOUNT 516,515.00 TOTAL WORK COMPLETED 320,529.75 320,529.75 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 320,529.75 320,529.75 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/19/06 30 11/28/06 11/03/06 01/04/07 21 10 0 0 62% 70% PROGRESS IS SATISFACTORY KURANI BHOOPEN RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 12/20/06