PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/24/11 EST. NO.15 TIME 02:22 PM R.E. NAME: COOPER, CHEE 04-447904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0077 480.46 E.W. @ F.A.(+) 081411 N 0300.0 0090 925.40 080511 N 0298.0 0092 415.12 080711 N 0316.0 0095 624.53 081111 N 0304.0 0096 660.42 081211 N 0305.0 0097 1,094.77 081911 N 0310.0 0098 467.57 080511 N 0320.0 0101 3,273.01 090911 N PCN003 0102 144.10 091311 N PCN004 0104 199.35 083011 N 0322.0 008 0070 3,079.97 E.W. @ F.A.(+) 072611 N 0274.0 0071 178.75 072711 N 0275.0 0076 458.04 062011 N 0328.0 0077 1,060.59 071411 N 0329.0 0078 218.69 091611 N 0331.0 0079 218.69 091611 N 0333.0 0081 1,119.61 071211 N 0336.0 012 0008 12,145.39 E.W. @ F.A.(+) 051011 N 0179.0 0020 41,811.30 050511 N 0213.1 0023 363.63 050611 N 0181.1 015 0021 3,076.95 E.W. @ F.A.(+) 051311 N 0172.0 016 0001 751.90 E.W. @ F.A.(+) 052111 N 0162.0 0002 593.99 052111 N 0163.0 0003 1,423.04 052011 N 0183.1 0004 60,438.48 080511 N 0285.0 0006 7,263.85 080411 N 0281.0 017 0003 2,214.58 E.W. @ F.A.(+) 070811 N 0256.1 0004 19,961.56 070811 N 0255.0 0005 8,350.39 070811 N 0256.0 0007 3,154.53 070811 N 0255.2 0008 3,917.93 080111 N 0273.0 0009 23,565.08 070711 N 0247.2 0010 1,357.40 070711 N 0247.3 018 0002 1,462.84 E.W. @ F.A.(+) 052411 N 0153.1 019 0002 14,597.90 E.W. @ F.A.(+) 070811 N 0254.0 020 0004 3,458.66 E.W. @ F.A.(+) 091611 N 0346.0 021 0004 270.15 E.W. @ F.A.(+) 091511 N 0332.0 0006 256.61 090811 N 0340.1 0008 2,435.96 090611 N 0325.0 0009 2,162.43 090911 N 0344.0 023 0002 1,623.60 E.W. @ F.A.(+) 090611 N 0330.0 0003 1,456.31 083011 N 0335.0 232,733.53 TOTAL THIS ESTIMATE 558,309.61 TOTAL PREVIOUS ESTIMATE 791,043.14 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/24/11 EST. NO.15 TIME 02:22 PM R.E. NAME: COOPER, CHEE 04-447904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS DBE TRUCKING -10,000.00 11 MISSING JULY DBE TRK -10,000.00 13 ISSUES PER LTR 081 -3,000.00 15 -3,000.00 -23,000.00 TOTAL DEDUCTIONS -3,000.00 -23,000.00 PROGRAM CAS145 PAGE 1 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-447904 TIME 02:22 PM ESTIMATE NO. 15 BID OPENING 06/02/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: COOPER, CHEE DATE OF THIS ESTIMATE 10/24/11 LOCATION PROGRESS ESTIMATE 04-ALA-238-0.0/12.6 ----------------- TOP GRADE CONTRUCTION, INC IN ALAMEDA COUNTY IN FREMONT AND 50 CONTRACTORS STREET UNION CITY LIVERMORE, CA 94551 FED. AID NO. ACNH-P238(9)E REHABILITATE ROADWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,000.0000 3,000.00 0.750 2,250.00 002 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 2,000.00 0.000 0.00 003 TIME-RELATED OVERHEAD WDAY 300.0000 123,000.00 20.000 6,000.00 246.000 73,800.00 004 CONSTRUCTION SITE MANAGEMENT LS 45,000.0000 45,000.00 0.030 1,350.00 0.780 35,100.00 005 PREPARE STORM WATER POLLUTION LS 3,000.0000 3,000.00 0.020 60.00 0.750 2,250.00 PREVENTION PLAN 006 TEMPORARY SILT FENCE LF 7.0000 1,400.00 200.000 1,400.00 007 TEMPORARY CONSTRUCTION ENTRANCE EA 1,600.0000 6,400.00 0.000 0.00 008 TEMPORARY COVER SQYD 7.0000 700.00 2,372.220 16,605.54 009 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 1,800.00 34.000 10,200.00 010 STREET SWEEPING LS 35,000.0000 35,000.00 0.020 700.00 0.920 32,200.00 011 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 2,000.0000 2,000.00 1.000 2,000.00 012 CONSTRUCTION AREA SIGNS LS 18,000.0000 18,000.00 0.700 12,600.00 013 TRAFFIC CONTROL SYSTEM LS 278,000.0000 278,000.00 0.020 5,560.00 0.920 255,760.00 014 PORTABLE CHANGEABLE MESSAGE SIGN LS 4,200.0000 4,200.00 1.000 4,200.00 015 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.2000 14,000.00 70,019.000 14,003.80 STRIPE (HAZARDOUS WASTE) 016 REMOVE YELLOW THERMOPLASTIC PAVEMENT SQFT 0.9200 984.40 478.000 439.76 MARKING (HAZARDOUS WASTE) 017 REMOVE WOOD FENCE LF 7.0000 1,400.00 151.000 1,057.00 018 REMOVE METAL BEAM GUARD RAILING LF 10.5000 8,400.00 30.000 315.00 775.000 8,137.50 019 REMOVE FLARED END SECTION EA 1,100.0000 1,100.00 0.000 0.00 020 REMOVE ROADSIDE SIGN EA 85.0000 850.00 1.000 85.00 021 REMOVE SIGN PANEL EA 220.0000 220.00 0.000 0.00 022 REMOVE ASPHALT CONCRETE DIKE LF 0.9000 6,930.00 1,667.000 1,500.30 PROGRAM CAS145 PAGE 2 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-447904 TIME 02:22 PM ESTIMATE NO. 15 BID OPENING 06/02/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: COOPER, CHEE DATE OF THIS ESTIMATE 10/24/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE CULVERT LF 250.0000 1,500.00 6.000 1,500.00 024 REMOVE INLET EA 550.0000 1,100.00 1.000 550.00 025 REMOVE CONCRETE PAVEMENT SQYD 3.0000 20,910.00 5,463.950 16,391.85 026 RESET MAILBOX EA 600.0000 600.00 1.000 600.00 027 RELOCATE ROADSIDE SIGN EA 255.0000 1,020.00 0.000 0.00 028 RELOCATE WATER METER EA 850.0000 850.00 0.000 0.00 029 ADJUST FIRE HYDRANT EA 450.0000 450.00 0.000 0.00 030 MODIFY INLET EA 2,500.0000 2,500.00 0.000 0.00 031 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 0.9500 382,850.00 344,042.340 326,840.22 032 REMOVE CONCRETE (CURB, GUTTER, AND CY 105.0000 51,450.00 147.630 15,501.15 SIDEWALK) 033 CAP INLET EA 1,300.0000 1,300.00 1.000 1,300.00 034 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 1.000 5,000.00 035 ROADWAY EXCAVATION CY 8.0000 34,480.00 4,332.350 34,658.80 036 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.750 2,250.00 037 DITCH EXCAVATION CY 30.0000 240.00 0.000 0.00 038 IMPORTED MATERIAL (SHOULDER BACKING) TON 85.0000 4,420.00 0.000 0.00 039 SUBGRADE ENHANCEMENT GEOTEXTILE SQYD 1.5000 10,455.00 5,463.950 8,195.93 040 FIBER ROLLS LF 2.0000 300.00 75.000 150.00 041 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 3.0000 1,200.00 0.000 0.00 042 CLASS 2 AGGREGATE BASE CY 38.0000 47,120.00 1,074.180 40,818.84 043 LEAN CONCRETE BASE CY 205.0000 16,400.00 0.000 0.00 044 ASPHALT-RUBBER BINDER TON 1,200.0000 1,272,000.00 845.940 1,015,128.00 045 SCREENINGS (HOT-APPLIED) TON 69.0000 565,800.00 5,192.110 358,255.59 046 REPLACE ASPHALT CONCRETE SURFACING CY 151.5000 1,234,725.00 8,740.760 1,324,225.14 047 HOT MIX ASPHALT (TYPE A) TON 60.5000 321,255.00 4,100.000 248,050.00 9,257.320 560,067.86 048 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 85.0000 4,709,000.00 16.150 1,372.75 45,932.220 3,904,238.70 049 DATA CORE LS 5,500.0000 5,500.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-447904 TIME 02:22 PM ESTIMATE NO. 15 BID OPENING 06/02/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: COOPER, CHEE DATE OF THIS ESTIMATE 10/24/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.0000 5,800.00 0.000 0.00 051 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.0000 1,800.00 0.000 0.00 052 TACK COAT TON 700.0000 119,000.00 24.849 17,394.30 196.572 137,600.40 053 JOINTED PLAIN CONCRETE PAVEMENT CY 280.0000 36,400.00 0.000 0.00 054 SEAL PAVEMENT JOINT LF 5.0000 1,800.00 0.000 0.00 055 SEAL ISOLATION JOINT LF 5.0000 1,300.00 0.000 0.00 056 MINOR CONCRETE (MINOR STRUCTURE) CY 1,200.0000 75,600.00 2.000 2,400.00 9.940 11,928.00 (F) 057 MINOR CONCRETE (BACKFILL) CY 300.0000 600.00 1.650 495.00 058 RETAINING WALL STEM (TYPE 6) SQFT 40.0000 28,000.00 0.000 0.00 059 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.5000 1,087.50 0.000 0.00 (0.063"-UNFRAMED) 060 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.5000 337.50 0.000 0.00 (0.063"-FRAMED) 061 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.5000 635.50 0.000 0.00 (0.080"-FRAMED) 062 ROADSIDE SIGN - ONE POST EA 205.0000 1,640.00 0.000 0.00 063 ROADSIDE SIGN - TWO POST EA 255.0000 765.00 0.000 0.00 064 12" ALTERNATIVE PIPE CULVERT LF 85.0000 1,700.00 20.000 1,700.00 065 18" ALTERNATIVE PIPE CULVERT (TYPE A) LF 105.0000 5,775.00 54.200 5,691.00 066 18" ALTERNATIVE PIPE CULVERT (TYPE B) LF 80.0000 206,400.00 0.000 0.00 067 48" REINFORCED CONCRETE PIPE LF 650.0000 5,200.00 0.000 0.00 068 MINOR CONCRETE (CHANNEL LINING) CY 650.0000 2,600.00 0.000 0.00 069 MINOR CONCRETE (MISCELLANEOUS CY 400.0000 196,000.00 0.340 136.00 437.520 175,008.00 CONSTRUCTION) 070 CURB RAMP DETECTABLE WARNING SURFACE EA 460.0000 29,900.00 54.000 24,840.00 071 MISCELLANEOUS IRON AND STEEL LB 2.6000 12,383.80 1,721.000 4,474.60 (F) 072 CHAIN LINK FENCE (TYPE CL-3, VINYL-CLAD) LF 55.0000 825.00 0.000 0.00 073 GUARD RAILING DELINEATOR EA 9.5000 228.00 21.000 199.50 074 OBJECT MARKER EA 45.0000 180.00 3.000 135.00 075 OBJECT MARKER (TYPE K-1) EA 35.0000 2,310.00 0.000 0.00 076 METAL BEAM GUARD RAILING LF 23.0000 18,400.00 669.500 15,398.50 PROGRAM CAS145 PAGE 4 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-447904 TIME 02:22 PM ESTIMATE NO. 15 BID OPENING 06/02/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: COOPER, CHEE DATE OF THIS ESTIMATE 10/24/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 077 TRANSITION RAILING (TYPE WB) EA 3,250.0000 6,500.00 1.000 3,250.00 078 END ANCHOR ASSEMBLY (TYPE SFT) EA 750.0000 1,500.00 2.000 1,500.00 079 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,300.0000 9,200.00 3.000 6,900.00 080 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2400 38,760.00 1,980.000 475.20 110,643.000 26,554.32 081 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.3300 19,602.00 869.000 286.77 58,394.000 19,270.02 082 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 9,480.00 4,000.000 2,400.00 13,906.000 8,343.60 083 THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 43,400.00 19,731.500 39,463.00 084 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.8500 222.00 130.000 240.50 085 PAVEMENT MARKER (RETROREFLECTIVE) EA 1.8500 7,585.00 4.000 7.40 4,697.000 8,689.45 086 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 100.0000 100.00 0.050 5.00 0.950 95.00 SYSTEM ELEMENTS DURING CONSTRUCTION 087 SIGNAL AND LIGHTING (LOCATION 1) LS 130,000.0000 130,000.00 0.950 123,500.00 088 SIGNAL AND LIGHTING (LOCATION 2) LS 125,000.0000 125,000.00 0.980 122,500.00 089 SIGNAL AND LIGHTING (LOCATION 3) LS 124,000.0000 124,000.00 0.970 120,280.00 090 LOOP DETECTOR REPLACEMENT LS 240,000.0000 240,000.00 0.950 228,000.00 091 ADJUST PULL BOX EA 250.0000 250.00 1.000 250.00 PROGRAM CAS145 PAGE 5 DATE 10/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-447904 TIME 02:22 PM ESTIMATE NO. 15 BID OPENING 06/02/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/11 R.E. NAME: COOPER, CHEE DATE OF THIS ESTIMATE 10/24/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 286,512.42 9,175,566.87 ADJUSTMENT OF COMPENSATION 0.00 12,128.26 EXTRA WORK 232,733.53 778,914.88 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 519,245.95 9,966,610.01 092 MOBILIZATION LS 133,000.0000 1,133,000.00 1.000 1,133,000.00 ORIGINAL CONTRACT AMOUNT 11,898,075.70 TOTAL WORK COMPLETED 519,245.95 11,099,610.01 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -3,000.00 -23,000.00 TOTAL 516,245.95 11,076,610.01 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/22/10 410 08/06/10 08/06/10 06/20/12 246 58 0 0 94% 60% PROGRESS IS SATISFACTORY COOPER, CHEE RESIDENT ENGINEER PROGRAM CAS145 DATE 10/24/11