PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/22/13 EST. NO.03 TIME 07:37 AM R.E. NAME: AQUINO, NOEL 04-4A2504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 1,284.91 E.W. @ F.A.(+) 031313 N 0001 0 0002 3,843.07 031413 N 0002 0 0003 390.67 031513 N 0003 0 0004 1,311.38 032113 N 0004 0 0005 1,315.56 041213 N 0005 0 0006 300.78 031313 N 0006 0 0007 250.23 031313 N 0007 0 0008 125.11 031413 N 0008 0 0009 726.75 032413 N 0009 0 0010 726.75 032513 N 0010 0 0011 1,428.10 040513 N 0011 0 0012 1,461.28 040713 N 0012 0 0013 161.68 040813 N 0013 0 0014 925.98 041613 N 0014 0 0015 925.98 041713 N 15 0 0016 385.32 042313 N 0016 0 007 0001 3,680.37 E.W. @ F.A.(+) 032913 N 0001 0 19,243.92 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 19,243.92 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/22/13 EST. NO.03 TIME 07:37 AM R.E. NAME: AQUINO, NOEL 04-4A2504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4A2504 TIME 07:37 AM ESTIMATE NO. 03 BID OPENING 11/27/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/13 R.E. NAME: AQUINO, NOEL DATE OF THIS ESTIMATE 05/22/13 LOCATION PROGRESS ESTIMATE 04-SOL-80-0.9/45.0 ----------------- CORAL CONSTRUCTION COMPANY IN SOLANO COUNTY FROM 0.2 MILE P O BOX 347 SOUTH OF ROUTE 80/29 SEPARATION TO WILSONVILLE, OR 97070 1.1 MILE NORTH OF SOUTH DAVIS OVERHEAD FED. AID NO. IMG-080 -2(363) INSTALL METAL BEAM GUARDRAIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONCRETE BARRIER LF 600.0000 22,800.00 26.000 15,600 (TRANSITION ANCHOR BLOCK) 002 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750 PROGRAM 003 TEMPORARY FIBER ROLL LF 2.5000 56,250.00 22,500.000 56,250 004 TEMPORARY COVER SQYD 2.8000 9,800.00 0.000 0 005 TEMPORARY DRAINAGE INLET PROTECTION EA 90.0000 9,000.00 2.000 180.00 45.000 4,050 006 TEMPORARY CONCRETE WASHOUT LS 3,000.0000 3,000.00 0.750 2,250.00 0.750 2,250 007 TIME-RELATED OVERHEAD (LS) LS 80,000.0000 80,000.00 0.180 14,400.00 0.530 42,400 008 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 0.800 20,000 009 TRAFFIC CONTROL SYSTEM LS 330,000.0000 330,000.00 0.250 82,500.00 0.600 198,000 010 PORTABLE CHANGEABLE MESSAGE SIGN EA 15,000.0000 15,000.00 0.250 3,750.00 0.600 9,000 011 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.250 1,250.00 0.600 3,000 012 REMOVE ASPHALT CONCRETE DIKE LF 3.5000 79,100.00 4,030.000 14,105.00 22,257.000 77,899 013 SALVAGE METAL BEAM GUARD RAILING LF 12.2500 11,760.00 150.000 1,837.50 437.500 5,359 014 RESET ROADSIDE SIGN EA 220.0000 11,440.00 0.000 0 015 CLEARING AND GRUBBING (LS) LS 40,000.0000 40,000.00 1.000 40,000 016 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 0.500 500 017 EROSION CONTROL (DRY SEED) (SQFT) SQFT 0.1500 1,269.00 0.000 0 018 FIBER ROLLS LF 2.7000 4,023.00 0.000 0 019 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 600.0000 4,200.00 3.000 1,800 020 ROLLED EROSION CONTROL PRODUCT SQFT 0.3500 2,961.00 0.000 0 (NETTING) 021 COMPOST SQFT 1.0000 8,460.00 0.000 0 022 MINOR HOT MIX ASPHALT TON 350.0000 107,100.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4A2504 TIME 07:37 AM ESTIMATE NO. 03 BID OPENING 11/27/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/13 R.E. NAME: AQUINO, NOEL DATE OF THIS ESTIMATE 05/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 3.0000 2,850.00 0.000 0 024 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3.0000 67,200.00 0.000 0 025 GUARD RAILING DELINEATOR EA 20.0000 34,600.00 285.000 5,700.00 1,033.000 20,660 026 OBJECT MARKER (TYPE P) EA 100.0000 800.00 0.000 0 027 OBJECT MARKER (TYPE L-1) EA 60.0000 1,080.00 4.000 240.00 9.000 540 028 METAL BEAM GUARD RAILING (WOOD POST) LF 18.5000 821,400.00 5,141.000 95,108.50 22,059.750 408,105 029 VEGETATION CONTROL (MINOR CONCRETE) SQYD 31.0000 589,000.00 4,054.200 125,680.20 8,078.200 250,424 030 TRANSITION RAILING (TYPE WB) EA 3,800.0000 11,400.00 0.000 0 031 END ANCHOR ASSEMBLY (TYPE SFT) EA 600.0000 13,800.00 1.000 600.00 10.000 6,000 032 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,600.0000 13,000.00 1.000 2,600 033 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,100.0000 33,600.00 2.000 4,200.00 10.000 21,000 034 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 035 LIGHTING AND SIGN ILLUMINATION LS 90,000.0000 90,000.00 0.530 47,700.00 0.610 54,900 036 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 037 CONCRETE BARRIER (TYPE 60S) LF 450.0000 20,250.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4A2504 TIME 07:37 AM ESTIMATE NO. 03 BID OPENING 11/27/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/13 R.E. NAME: AQUINO, NOEL DATE OF THIS ESTIMATE 05/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 399,501.20 1,241,088.46 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 19,243.92 19,243.92 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 418,745.12 1,260,332.38 038 MOBILIZATION LS 280,745.0000 280,745.00 0.050 14,037.25 1.000 280,745 ORIGINAL CONTRACT AMOUNT 2,808,888.00 TOTAL WORK COMPLETED 432,782.37 1,541,077.38 MATERIALS ON HAND ON SITE 140,929.64 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 432,782.37 1,682,007.02 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/25/13 110 00/00/00 02/11/13 07/31/13 60 8 0 0 53% 55% PROGRESS IS SATISFACTORY AQUINO, NOEL RESIDENT ENGINEER PROGRAM CAS145 DATE 05/22/13