PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/22/18 EST. NO. 025 TIME 01:43 PM R.E. NAME: STREATER, HAL 04-4G4604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0115-1 -1,657.98 E.W. @ F.A.(+) 030117 N 0019.1 DAO CORRECTING ENTRY 0116-1 -768.12 032917 N 0020.1 DAO CORRECTING ENTRY 0153-1 -4,758.26 050117 N 0033.1 DAO CORRECTING ENTRY 0154-1 -2,541.52 050217 N 0034.1 DAO CORRECTING ENTRY 0155-1 -2,541.52 050417 N 0035.1 DAO CORRECTING ENTRY 0156-1 -2,541.52 050517 N 0036.1 DAO CORRECTING ENTRY 0157-1 -677.30 051517 N 0037.1 DAO CORRECTING ENTRY 0158-1 -1,799.89 051617 N 0038.1 DAO CORRECTING ENTRY 0159-1 -2,054.31 051817 N 0039.1 DAO CORRECTING ENTRY 0160-1 -8,883.45 060817 N 0040.1 DAO CORRECTING ENTRY 0161-1 -2,146.38 061217 N 0041.1 DAO CORRECTING ENTRY 0162-1 -1,195.78 061417 N 0042.1 DAO CORRECTING ENTRY 0163 3,095.50 061517 N 0043.1 0164 4,135.24 061617 N 0044.1 0165-1 -1,870.07 062917 N 0045.1 DAO CORRECTING ENTRY 0166 2,533.56 071017 N 0046.1 0167 2,552.46 062017 N 0047.1 0168 2,472.04 071117 N 0048.0 0169-1 -394.69 072517 N 0049.0 DAO CORRECTING ENTRY 0171 390.03 081517 N 0051.0 0172 390.03 081617 N 0052.0 0200 305.11 122217 Y 5397.0 0201 302.90 010218 Y 5400.0 0202 473.76 010318 Y 5401.0 0203 207.94 010418 Y 5402.0 0204 203.13 011018 Y 5403.0 0205 151.45 011618 Y 5404.0 0206 768.85 052317 Y 5242.1 0207 455.65 052417 Y 5245.1 0208 336.97 052517 Y 5246.1 0209 574.06 053117 Y 5250.1 0210 750.00 061517 N 5319.1 0215 830.32 101617 Y 5331.1 0216 1,125.00 071917 N 5336.1 0217 3,911.91 100517 Y 5339.1 0218 1,029.98 102317 Y 5341.1 0219 2,085.25 102417 Y 5343.1 0220 260.64 102617 Y 5344.1 0221 146.35 103117 Y 5350.1 0222 492.19 110117 Y 5352.1 0223 154.66 110617 Y 5359.1 0224 583.05 110817 Y 5366.1 0225 390.19 111017 Y 5368.1 0226 217.32 111617 Y 5372.1 0227 491.30 120317 Y 5387.1 0228 262.51 120917 Y 5388.1 0229 875.44 122017 Y 5396.1 0230 248.75 012318 Y 5411.0 0231 236.35 020118 Y 5412.0 008 0125 18.48 E.W. @ F.A.(+) 042417 Y 5405.0 0126 18.48 042517 Y 5406.0 PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 2 DATE 02/22/18 EST. NO. 025 TIME 01:43 PM R.E. NAME: STREATER, HAL 04-4G4604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 0127 18.48 042617 Y 5407.0 0128 9.24 042717 Y 5408.0 0129 13.86 042817 Y 5409.0 0130 13,966.56 101017 Y 5320.2 0131 16,930.57 101017 Y 5321.2 009 0001 13,966.56 E.W. @ F.A.(+) 101017 Y 5320.1 0001-1 -13,966.56 101017 Y 5320.1 DAO CORRECTING ENTRY 0002 16,930.57 101017 Y 5321.1 0002-1 -16,930.57 101017 Y 5321.1 DAO CORRECTING ENTRY 0003 7,502.63 011618 N 0058.1 0004 5,715.07 020118 N 0059.1 014 0001 1,657.98 E.W. @ F.A.(+) 030117 N 437276 0002 768.12 032917 N 437280 0003 1,657.98 030117 N 0019.2 0004 768.12 032917 N 0020.2 0005 4,758.26 050117 N 0033.2 0006 2,541.52 050217 N 0034.2 0007 2,541.52 050417 N 0035.2 0008 2,541.52 050517 N 0036.2 0009 677.30 051517 N 0037.2 0010 1,799.89 051617 N 0038.2 0011 2,054.31 051817 N 0039.2 0012 2,146.38 061217 N 0041.2 0013 1,195.78 061417 N 0042.2 0014 3,095.50 061517 N 0043.2 0015 4,135.24 061617 N 0044.2 0016 1,870.07 062917 N 0045.2 0017 2,533.56 071017 N 0046.2 0018 2,552.46 062017 N 0047.2 0019 2,472.04 071117 N 0048.1 0020 394.69 072517 N 0049.1 85,964.71 TOTAL THIS ESTIMATE 1,002,079.55 TOTAL PREVIOUS ESTIMATE 1,088,044.26 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/22/18 EST. NO. 025 TIME 01:43 PM R.E. NAME: STREATER, HAL 04-4G4604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G4604 TIME 01:43 PM ESTIMATE NO. 025 BID OPENING 11/19/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: STREATER, HAL DATE OF THIS ESTIMATE 02/22/18 LOCATION RERUN PROGRESS ESTIMATE 04-MRN-101 ----------------------- GHILOTTI BROS/RM HARRIS JV IN MARIN COUNTY, AT VARIOUS 525 JACOBY STREET LOCATION, FROM SPENCER AVE SAN RAFAEL CA 94901 OVERCROSSING TO NORTH BRANCH GALLINAS CREEK BRIDGE FED. AID NO. NHP-Q101(277)E UPGRADE BRIDGE RAIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 4,500.0000 4,500.00 1.000 4,500 003 TIME-RELATED OVERHEAD (LS) LS 276,000.0000 276,000.00 1.000 276,000 004 CONSTRUCTION AREA SIGNS LS 10,900.0000 10,900.00 0.750 8,175 005 TRAFFIC CONTROL SYSTEM LS 560,000.0000 560,000.00 1.000 560,000 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.5000 16,900.00 41,164.000 20,582 007 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 4,800.00 68.000 2,720 008 TEMPORARY PAVEMENT MARKER EA 5.0000 3,350.00 839.000 4,195 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 22,400.0000 22,400.00 1.000 22,400 010 TEMPORARY RAILING (TYPE K) LF 38.0000 310,080.00 8,060.900 306,314 011 TEMPORARY ALTERNATIVE CRASH CUSHION EA 5,900.0000 94,400.00 16.000 94,400 012 JOB SITE MANAGEMENT LS 15,000.0000 15,000.00 1.000 15,000 013 PREPARE WATER POLLUTION CONTROL PROGRAM LS 3,500.0000 3,500.00 1.000 3,500 014 TEMPORARY HYDRAULIC MULCH SQYD 15.0000 2,250.00 0.000 0 (BONDED FIBER MATRIX) 015 TEMPORARY COVER SQYD 1.0000 2.00 444.000 444 016 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 1,200.00 9.000 1,350 017 TEMPORARY FIBER ROLL LF 3.0000 3,000.00 175.000 525 018 STREET SWEEPING LS 8,000.0000 8,000.00 1.000 8,000 019 TEMPORARY CONCRETE WASHOUT LS 3,200.0000 3,200.00 1.000 3,200 020 TEMPORARY FENCE (TYPE ESA) LF 6.0000 6,000.00 1,830.000 10,980 021 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.0000 17,500.00 10,223.000 20,446 STRIPE (HAZARDOUS WASTE) 022 TREATED WOOD WASTE LB 0.1000 1,350.00 13,500.000 1,350 PROGRAM CAS145 PAGE 2 DATE 02/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G4604 TIME 01:43 PM ESTIMATE NO. 025 BID OPENING 11/19/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: STREATER, HAL DATE OF THIS ESTIMATE 02/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PUBLIC SAFETY PLAN LS 3,754.4900 3,754.49 1.000 3,754 024 REMOVE GUARDRAIL LF 7.0000 6,090.00 870.000 6,090 025 REMOVE PAINTED TRAFFIC STRIPE LF 0.2500 5,975.00 3,953.000 988 026 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 3,100.00 13,957.000 3,489 027 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 12.0000 2,160.00 90.000 1,080 028 REMOVE PAVEMENT MARKER EA 2.0000 5,020.00 1,977.000 3,954 029 REMOVE ROADSIDE SIGN EA 100.0000 600.00 0.000 0 030 REMOVE BRIDGE MOUNTED SIGN EA 2,450.0000 4,900.00 2.000 4,900 031 REMOVE ASPHALT CONCRETE DIKE LF 3.5000 490.00 0.000 0 032 REMOVE CULVERT (LF) LF 175.0000 2,625.00 15.000 2,625 033 REMOVE INLET EA 900.0000 900.00 1.000 900 034 REMOVE ASPHALT CONCRETE SURFACING SQFT 50.0000 26,300.00 526.000 26,300 035 ADJUST INLET EA 2,500.0000 2,500.00 0.000 0 036 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 30.0000 4,200.00 0.000 0 037 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 1.1000 4,237.20 3,852.000 4,237.20 3,852.000 4,237 038 REFINISH BRIDGE DECK SQFT 13.0000 76,050.00 2,249.240 29,240.12 8,295.240 107,838 039 FURNISH POLYESTER CONCRETE OVERLAY CF 130.0000 37,830.00 154.550 20,091.50 445.550 57,921 040 PLACE POLYESTER CONCRETE OVERLAY SQFT 8.0000 30,816.00 -1,269.000 -10,152.00 3,852.000 30,816 (F) 041 ACCESS OPENING, SOFFIT EA 1,300.0000 16,900.00 13.000 16,900 042 BRIDGE REMOVAL (PORTION), LOCATION A LS 170,000.0000 170,000.00 1.000 170,000 043 BRIDGE REMOVAL (PORTION), LOCATION B LS 245,000.0000 245,000.00 1.000 245,000 044 BRIDGE REMOVAL (PORTION), LOCATION C LS 334,000.0000 334,000.00 1.000 334,000 045 BRIDGE REMOVAL (PORTION), LOCATION D LS 53,000.0000 53,000.00 1.000 53,000 046 BRIDGE REMOVAL (PORTION), LOCATION E LS 35,000.0000 35,000.00 -0.070 -2,450.00 0.930 32,550 047 BRIDGE REMOVAL (PORTION), LOCATION F LS 320,000.0000 320,000.00 1.000 320,000 048 ROADWAY EXCAVATION CY 420.0000 46,200.00 118.420 49,736 049 STRUCTURE EXCAVATION (BRIDGE) CY 500.0000 25,500.00 51.000 25,500 (F) PROGRAM CAS145 PAGE 3 DATE 02/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G4604 TIME 01:43 PM ESTIMATE NO. 025 BID OPENING 11/19/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: STREATER, HAL DATE OF THIS ESTIMATE 02/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 STRUCTURE BACKFILL (BRIDGE) CY 500.0000 6,000.00 1.500 750.00 12.000 6,000 (F) 051 IMPORTED BORROW (CY) CY 250.0000 1,175.00 0.000 0 052 HOT MIX ASPHALT (TYPE A) TON 1,200.0000 104,400.00 106.280 127,536 053 HOT MIX ASPHALT (BRIDGE) TON 1,600.0000 17,600.00 12.870 20,592 054 ASPHALT BINDER TON 100.0000 10.00 0.000 0 (GEOSYNTHETIC PAVEMENT INTERLAYER) 055 GEOSYNTHETIC PAVEMENT INTERLAYER SQYD 41.0000 3,526.00 0.000 0 (PAVING GRID) 056 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 27.5000 3,850.00 0.000 0 057 TACK COAT TON 700.0000 70.00 0.000 0 058 STRUCTURAL CONCRETE, BRIDGE CY 1,225.0000 846,475.00 4.500 5,512.50 691.000 846,475 (F) 059 STRUCTURAL CONCRETE, BARRIER SLAB CY 650.0000 60,450.00 93.000 60,450 (F) 060 MINOR CONCRETE (MINOR STRUCTURE) CY 3,650.0000 3,650.00 1.000 3,650 (F) 061 PAVING NOTCH EXTENSION CF 300.0000 1,800.00 6.000 1,800 062 DRILL AND BOND DOWEL LF 30.0000 328,710.00 10,957.000 328,710 063 DRILL AND BOND DOWEL (CHEMICAL ADHESIVE) EA 33.0000 142,164.00 4,308.000 142,164 (MODIFIED) 064 JOINT SEAL (MR 1") LF 90.0000 10,350.00 126.000 11,340.00 126.000 11,340 065 JOINT SEAL (MR 1 1/2") LF 250.0000 13,500.00 27.000 6,750.00 27.000 6,750 066 JOINT SEAL (MR 2") LF 325.0000 1,950.00 66.320 21,554.00 66.320 21,554 067 BAR REINFORCING STEEL (BRIDGE) LB 1.4000 478,380.00 341,700.000 478,380 (F) 068 HEADED BAR REINFORCEMENT EA 8.0000 56,368.00 7,046.000 56,368 (F) 069 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED LB 6.3000 35,450.10 0.000 0 (F) WITHOUT WALKWAY) 070 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED LB 3.4500 19,413.15 0.000 0 (F) WITHOUT WALKWAY) 071 FURNISH FORMED PANEL SIGN (OVERHEAD) SQFT 14.5500 3,637.50 0.000 0 072 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 25.0000 10,000.00 0.000 0 073 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 9.5000 399.00 0.000 0 (0.063"-UNFRAMED) 074 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.5000 483.00 0.000 0 (0.080"-UNFRAMED) 075 METAL (RAIL MOUNTED SIGN) LB 12.0000 13,680.00 0.000 0 076 ROADSIDE SIGN - ONE POST EA 275.0000 275.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 02/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G4604 TIME 01:43 PM ESTIMATE NO. 025 BID OPENING 11/19/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: STREATER, HAL DATE OF THIS ESTIMATE 02/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 24.0000 6,000.00 0.000 0 078 PREPARE AND STAIN CONCRETE SQFT 3.5000 21,882.00 0.000 0 079 MINOR CONCRETE (CURB) (CY) CY 4,100.0000 6,150.00 0.000 0 080 MISCELLANEOUS IRON AND STEEL LB 2.0000 478.00 0.000 0 (F) 081 MISCELLANEOUS METAL (BRIDGE) LB 18.0000 7,254.00 200.000 3,600 (F) 082 DELINEATOR (CLASS 1) EA 40.0000 1,240.00 0.000 0 083 MIDWEST GUARDRAIL SYSTEM (7' WOOD POST) LF 32.0000 20,800.00 203.000 6,496.00 203.000 6,496 084 VEGETATION CONTROL (MINOR CONCRETE) SQYD 135.0000 21,600.00 0.000 0 085 TUBULAR BICYCLE RAILING LF 111.0000 72,039.00 649.000 72,039 (F) 086 TRANSITION RAILING (TYPE WB-31) EA 4,000.0000 32,000.00 0.000 0 087 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,000.0000 1,000.00 0.000 0 088 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,000.0000 8,000.00 0.000 0 089 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,500.0000 5,000.00 0.000 0 090 CONCRETE BARRIER (TYPE 60D MODIFIED) LF 298.5600 4,776.96 16.000 4,776 (F) 091 CONCRETE BARRIER (TYPE 80 MODIFIED) LF 171.5000 977,550.00 5,700.000 977,550 (F) 092 CONCRETE BARRIER (TYPE 80SW MODIFIED) LF 355.0000 92,300.00 260.000 92,300 (F) 093 CONCRETE BARRIER (TYPE 742 MODIFIED) LF 250.0000 37,250.00 149.000 37,250 (F) 094 CALIFORNIA ST-10 BRIDGE RAIL LF 350.0000 42,700.00 122.000 42,700 (F) (MODIFIED) 095 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 7,650.00 0.000 0 096 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,090.00 0.000 0 097 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 900.00 0.000 0 098 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 497.50 0.000 0 (BROKEN 17-7) 099 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 3,500.00 0.000 0 (BROKEN 17-14) 100 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 77.50 0.000 0 (BROKEN 8.5-7) 101 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 2,400.00 0.000 0 102 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 2,070.00 163.000 489 103 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.500 250 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 5 DATE 02/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G4604 TIME 01:43 PM ESTIMATE NO. 025 BID OPENING 11/19/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: STREATER, HAL DATE OF THIS ESTIMATE 02/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 LIGHTING LS 85,291.0000 85,291.00 1.000 85,291 105 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 106 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.4000 3,256.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 02/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G4604 TIME 01:43 PM ESTIMATE NO. 025 BID OPENING 11/19/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/18 R.E. NAME: STREATER, HAL DATE OF THIS ESTIMATE 02/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 93,369.32 6,302,672.37 ADJUSTMENT OF COMPENSATION 0.00 354,809.76 EXTRA WORK 85,964.71 733,234.50 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 179,334.03 7,390,716.63 107 MOBILIZATION LS 717,666.3700 717,666.37 1.000 717,666 ORIGINAL CONTRACT AMOUNT 7,176,663.77 TOTAL WORK COMPLETED 179,334.03 8,108,383.00 MATERIALS ON HAND ON SITE -182.12 38,998.14 DEDUCTIONS 0.00 0.00 TOTAL 179,151.91 8,147,381.14 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/03/16 200 04/06/16 05/12/16 03/30/18 296 169 0 0 95% 100% PROGRESS IS SATISFACTORY STREATER, HAL RESIDENT ENGINEER PROGRAM CAS145 DATE 02/22/18