PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/18/18 EST. NO. 001 TIME 03:09 PM R.E. NAME: LOI, LAWRENCE 04-4G8004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/18/18 EST. NO. 001 TIME 03:09 PM R.E. NAME: LOI, LAWRENCE 04-4G8004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G8004 TIME 03:09 PM ESTIMATE NO. 001 BID OPENING 11/01/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: LOI, LAWRENCE DATE OF THIS ESTIMATE 04/18/18 LOCATION PROGRESS ESTIMATE 04-ALA-580-R26.8/R27.2 ----------------- MYERS AND SONS CONSTRUCTION, IN CASTRO VALLEY, ON EASTBOUND EAST LP CASTRO VALLEY BOULEVARD 4600 NORTHGATE BLVD SUITE 100 UNDERCROSSING NO. 33-0235L. SACRAMENTO CA 95834 FED. AID NO. ACIM- 580-1(73)E REPLACE BRIDGE DECK. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.700 1,050.00 0.700 1,050 002 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500 003 TRAFFIC CONTROL SYSTEM LS 99,000.0000 99,000.00 0.000 0 004 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.2000 5,796.00 0.000 0 005 CHANNELIZER (SURFACE MOUNTED) EA 50.0000 600.00 0.000 0 006 TEMPORARY PAVEMENT MARKER EA 6.0000 468.00 0.000 0 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.000 0 008 TEMPORARY RAILING (TYPE K) LF 63.0000 18,900.00 0.000 0 009 TEMPORARY CRASH CUSHION MODULE EA 350.0000 4,900.00 0.000 0 010 JOB SITE MANAGEMENT LS 9,000.0000 9,000.00 0.110 990.00 0.110 990 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.500 750.00 0.500 750 012 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 400.00 0.000 0 013 TEMPORARY REINFORCED SILT FENCE LF 7.0000 7,700.00 660.000 4,620.00 660.000 4,620 014 STREET SWEEPING LS 10,000.0000 10,000.00 0.000 0 015 TEMPORARY CONCRETE WASHOUT LS 4,000.0000 4,000.00 0.000 0 016 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 4.0000 3,040.00 0.000 0 STRIPE (HAZARDOUS WASTE) 017 TREATED WOOD WASTE LB 0.1500 340.50 0.000 0 018 REPLACE BASE CY 500.0000 60,000.00 0.000 0 019 BASE BOND BREAKER SQYD 10.0000 8,900.00 0.000 0 020 HOT MIX ASPHALT (TYPE A) TON 675.0000 28,350.00 0.000 0 021 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 30.0000 3,300.00 0.000 0 022 TACK COAT TON 3,500.0000 350.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G8004 TIME 03:09 PM ESTIMATE NO. 001 BID OPENING 11/01/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: LOI, LAWRENCE DATE OF THIS ESTIMATE 04/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE ASPHALT CONCRETE DIKE LF 15.0000 2,850.00 0.000 0 024 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 54.0000 9,720.00 0.000 0 025 DRILL AND BOND (DOWEL BAR) EA 60.0000 16,800.00 0.000 0 026 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 1,000.0000 250,000.00 0.000 0 027 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 2,050.0000 16,400.00 0.000 0 (F) 028 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,402.0000 538,368.00 0.000 0 (F) (TYPE R) 029 DRILL AND BOND DOWEL LF 50.0000 10,800.00 0.000 0 (CHEMICAL ADHESIVE)(LF) 030 CLEAN EXPANSION JOINT LF 35.0000 7,665.00 0.000 0 031 BONDED JOINT SEAL (MR 2") LF 77.0000 16,863.00 0.000 0 032 BAR REINFORCING STEEL (BRIDGE) LB 13.0000 7,475.00 0.000 0 (F) 033 RAPID SETTING CONCRETE (PATCH) CF 28.0000 16,520.00 0.000 0 034 REMOVE UNSOUND CONCRETE CF 38.0000 22,420.00 0.000 0 035 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2500 11,745.00 0.000 0 036 FURNISH POLYESTER CONCRETE OVERLAY CF 83.0000 324,945.00 0.000 0 037 PLACE POLYESTER CONCRETE OVERLAY SQFT 2.3500 110,403.00 0.000 0 (F) 038 BRIDGE REMOVAL (PORTION) LS 25,000.0000 25,000.00 0.000 0 039 2" PLASTIC PIPE (EDGE DRAIN) LF 120.0000 27,600.00 0.000 0 040 2" PLASTIC PIPE (EDGE DRAIN OUTLET) LF 75.0000 1,875.00 0.000 0 041 REMOVE PIPE (LF) LF 75.0000 17,250.00 0.000 0 042 MINOR CONCRETE (MISCELLANEOUS CY 2,160.0000 5,184.00 0.000 0 CONSTRUCTION) 043 REMOVE PAVEMENT MARKER EA 1.0000 360.00 0.000 0 044 GUARD RAILING DELINEATOR EA 25.0000 100.00 0.000 0 045 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 468.00 0.000 0 046 OBJECT MARKER (TYPE P) EA 100.0000 100.00 0.000 0 047 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 99.0000 9,900.00 0.000 0 048 VEGETATION CONTROL (MINOR CONCRETE) SQYD 241.0000 11,568.00 0.000 0 049 CONCRETE BARRIER (TYPE 60) LF 350.0000 22,750.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G8004 TIME 03:09 PM ESTIMATE NO. 001 BID OPENING 11/01/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: LOI, LAWRENCE DATE OF THIS ESTIMATE 04/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CONCRETE BARRIER TRANSITION LF 620.0000 15,314.00 0.000 0 (F) 051 REMOVE GUARDRAIL LF 10.0000 1,900.00 0.000 0 052 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 4,515.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 053 2" TRAFFIC CONTRAST STRIPE BLACK PAINT LF 0.8500 1,819.00 0.000 0 054 6" TRAFFIC CONTRAST STRIPE BLACK PAINT LF 1.2500 3,762.50 0.000 0 (BROKEN 16-12) 055 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.2500 4,117.50 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 056 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,350.00 0.000 0 057 MODIFYING EXISTING ELECTRICAL SYSTEM LS 19,600.0000 19,600.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 04/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4G8004 TIME 03:09 PM ESTIMATE NO. 001 BID OPENING 11/01/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: LOI, LAWRENCE DATE OF THIS ESTIMATE 04/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 9,910.00 9,910.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 9,910.00 9,910.00 058 MOBILIZATION LS 155,000.0000 155,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 1,985,551.50 TOTAL WORK COMPLETED 9,910.00 9,910.00 MATERIALS ON HAND ON SITE 46,265.00 46,265.00 DEDUCTIONS 0.00 0.00 TOTAL 56,175.00 56,175.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/27/17 90 03/01/18 03/01/18 08/14/18 10 27 0 0 0% 11% PROGRESS IS SATISFACTORY LOI, LAWRENCE RESIDENT ENGINEER PROGRAM CAS145 DATE 04/18/18