PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/23/19 EST. NO. 001 TIME 09:10 AM R.E. NAME: WRIGHT, DOUGLAS 04-4H0804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/23/19 EST. NO. 001 TIME 09:10 AM R.E. NAME: WRIGHT, DOUGLAS 04-4H0804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H0804 TIME 09:10 AM ESTIMATE NO. 001 BID OPENING 11/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/19 R.E. NAME: WRIGHT, DOUGLAS DATE OF THIS ESTIMATE 05/23/19 LOCATION RERUN PROGRESS ESTIMATE 04-ALA-238-R14.5/R14.5 ----------------------- BRIDGEWAY CIVIL CONSTRUCTORS, BETWEEN LIVERMORE AND HAYWARD, AT INC. EAST CONNECTOR SEPARATION BRIDGE 4950 ALLISON PARKWAY, SUITE A NO. 33-0524F, N238/S880 CONNECTOR VACAVILLE CA 95688 BRIDGE NO. 33-0540G AND I-580 ARROYO SECO BRIDGE NO. 33-0066. FED. AID NO. B1IM-X001(650)E BRIDGE MAINTENANCE. ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,750.0000 1,750.00 0.000 0 002 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 003 CONSTRUCTION AREA SIGNS LS 12,768.0000 12,768.00 0.750 9,576.00 0.750 9,576 004 TRAFFIC CONTROL SYSTEM LS 220,000.0000 220,000.00 0.000 0 005 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.0000 4,600.00 0.000 0 006 CHANNELIZER (SURFACE MOUNTED) EA 43.0000 1,720.00 0.000 0 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 3,000.0000 54,000.00 0.000 0 008 TEMPORARY RAILING (TYPE K) LF 22.0000 41,800.00 0.000 0 009 TEMPORARY ALTERNATIVE CRASH CUSHION EA 2,011.0000 10,055.00 0.000 0 (TL-3) 010 JOB SITE MANAGEMENT LS 13,100.0000 13,100.00 0.000 0 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 839.0000 839.00 1.000 839.00 1.000 839 012 TEMPORARY COVER SQYD 5.0000 1,000.00 0.000 0 013 TEMPORARY DRAINAGE INLET PROTECTION EA 243.0000 2,673.00 0.000 0 014 TEMPORARY FIBER ROLL LF 5.0000 1,500.00 0.000 0 015 TEMPORARY GRAVEL BAG BERM LF 9.0000 180.00 0.000 0 016 STREET SWEEPING LS 6,810.0000 6,810.00 0.000 0 017 TEMPORARY CONCRETE WASHOUT LS 1,703.0000 1,703.00 0.000 0 018 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 24.0000 1,488.00 0.000 0 019 WATER QUALITY MONITORING REPORT EA 486.0000 1,458.00 0.000 0 020 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 4.0000 4,880.00 0.000 0 STRIPE (HAZARDOUS WASTE) 021 TREATED WOOD WASTE LB 0.2500 990.00 0.000 0 022 TEMPORARY HIGH-VISIBILITY FENCE LF 5.0000 10,550.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H0804 TIME 09:10 AM ESTIMATE NO. 001 BID OPENING 11/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/19 R.E. NAME: WRIGHT, DOUGLAS DATE OF THIS ESTIMATE 05/23/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 DUST PALLIATIVE LS 3,647.0000 3,647.00 0.000 0 024 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,216.0000 1,216.00 0.000 0 025 TEMPORARY SUPPORT LS 605,605.0000 605,605.00 0.000 0 026 TEMPORARY DECKING LS 105,000.0000 105,000.00 0.000 0 027 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 7,000.0000 357,000.00 0.000 0 (F) 028 DRILL AND BOND DOWEL LF 43.0000 4,472.00 0.000 0 029 CLEAN EXPANSION JOINT LF 60.0000 4,680.00 0.000 0 030 JOINT SEAL (MR 1 1/2") LF 240.0000 18,720.00 0.000 0 031 JOINT SEAL ASSEMBLY (MR 4") LF 527.0000 36,890.00 0.000 0 032 BAR REINFORCING STEEL (BRIDGE) LB 2.0000 17,920.00 0.000 0 (F) 033 INJECT CRACK (EPOXY) LF 89.0000 62,300.00 0.000 0 034 REPAIR SPALLED SURFACE AREA SQFT 284.0000 4,544.00 0.000 0 035 ACCESS OPENING, SOFFIT EA 8,268.0000 33,072.00 0.000 0 036 BRIDGE REMOVAL (PORTION), LOCATION A LS 22,321.0000 22,321.00 0.000 0 037 BRIDGE REMOVAL (PORTION), LOCATION B LS 125,222.0000 125,222.00 0.000 0 038 REPLACE BEARING PAD EA 1,168.0000 16,352.00 0.000 0 039 MISCELLANEOUS METAL LB 28.0000 62,440.00 0.000 0 (F) (RESTRAINER - CABLE TYPE) 040 REMOVE PAVEMENT MARKER EA 2.0000 360.00 0.000 0 041 GUARD RAILING DELINEATOR EA 14.0000 210.00 0.000 0 042 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 1,100.00 0.000 0 043 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 62.0000 2,356.00 0.000 0 044 MIDWEST GUARDRAIL SYSTEM (7' WOOD POST) LF 74.0000 14,060.00 0.000 0 045 VEGETATION CONTROL (MINOR CONCRETE) SQYD 66.0000 11,880.00 0.000 0 046 CONCRETE BARRIER (TYPE 25) LF 3,600.0000 57,600.00 0.000 0 (F) 047 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,200.0000 2,400.00 0.000 0 048 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,200.0000 5,200.00 0.000 0 049 REMOVE GUARDRAIL LF 36.0000 9,720.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H0804 TIME 09:10 AM ESTIMATE NO. 001 BID OPENING 11/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/19 R.E. NAME: WRIGHT, DOUGLAS DATE OF THIS ESTIMATE 05/23/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 051 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 1,340.00 0.000 0 052 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 053 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 054 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 3,432.00 0.000 0 055 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 056 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 12,135.00 0.000 0 057 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 5,200.00 0.000 0 (BROKEN 36-12) 058 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 262.50 0.000 0 (BROKEN 17-7) PROGRAM CAS145 PAGE 4 DATE 05/23/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H0804 TIME 09:10 AM ESTIMATE NO. 001 BID OPENING 11/29/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/19 R.E. NAME: WRIGHT, DOUGLAS DATE OF THIS ESTIMATE 05/23/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 10,415.00 10,415.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 10,415.00 10,415.00 059 MOBILIZATION LS 222,000.0000 222,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 2,224,520.50 TOTAL WORK COMPLETED 10,415.00 10,415.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 10,415.00 10,415.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/09/19 100 03/27/19 03/27/19 07/31/19 5 8 0 0 0% 5% PROGRESS IS SATISFACTORY WRIGHT, DOUGLAS RESIDENT ENGINEER PROGRAM CAS145 DATE 05/23/19