PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/21/18 EST. NO. 001 TIME 01:03 PM R.E. NAME: BRAR, PARAMDEEP 04-4H2004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/21/18 EST. NO. 001 TIME 01:03 PM R.E. NAME: BRAR, PARAMDEEP 04-4H2004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H2004 TIME 01:03 PM ESTIMATE NO. 001 BID OPENING 11/08/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/18 R.E. NAME: BRAR, PARAMDEEP DATE OF THIS ESTIMATE 03/21/18 LOCATION RERUN PROGRESS ESTIMATE 04-NAP-29-13.5/25.5 ----------------------- GHILOTTI BROS., INC. IN AND NEAR NAPA AND YOUNTVILLE, 525 JACOBY STREET FROM NORTH OF TRANCAS SAN RAFAEL CA 94901 STREET/REDWOOD ROAD TO MEE LANE. FED. AID NO. CNHP-P029(134)E REPAIR PAVEMENT & ADA IMPROVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 1.000 10,000.00 1.000 10,000 002 TIME-RELATED OVERHEAD (LS) LS 225,000.0000 225,000.00 0.000 0 003 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.700 3,500.00 0.700 3,500 004 TRAFFIC CONTROL SYSTEM LS 202,000.0000 202,000.00 0.010 2,020.00 0.010 2,020 005 TEMPORARY TRAFFIC STRIPE (PAINT) LF 4.7500 4,275.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 25,000.0000 25,000.00 0.000 0 007 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 0.010 100.00 0.010 100 008 PREPARE STORM WATER POLLUTION PREVENTION LS 3,500.0000 3,500.00 1.000 3,500.00 1.000 3,500 PLAN 009 RAIN EVENT ACTION PLAN EA 500.0000 41,000.00 2.000 1,000.00 2.000 1,000 010 STORM WATER SAMPLING AND ANALYSIS DAY EA 200.0000 8,600.00 0.000 0 011 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 012 TEMPORARY COVER SQYD 6.0000 13,200.00 44.000 264.00 44.000 264 013 TEMPORARY CHECK DAM LF 16.5000 2,310.00 0.000 0 014 TEMPORARY DRAINAGE INLET PROTECTION EA 130.0000 10,530.00 54.000 7,020.00 54.000 7,020 015 TEMPORARY FIBER ROLL LF 3.0000 114,600.00 26,250.000 78,750.00 26,250.000 78,750 016 TEMPORARY GRAVEL BAG BERM LF 10.0000 8,500.00 0.000 0 017 TEMPORARY REINFORCED SILT FENCE LF 14.0000 2,100.00 0.000 0 018 TEMPORARY SILT FENCE LF 3.5000 7,070.00 0.000 0 019 TEMPORARY CONSTRUCTION ENTRANCE EA 3,500.0000 7,000.00 2.000 7,000.00 2.000 7,000 020 STREET SWEEPING LS 15,000.0000 15,000.00 0.000 0 021 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 0.000 0 022 TREATED WOOD WASTE LB 0.1000 5,350.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H2004 TIME 01:03 PM ESTIMATE NO. 001 BID OPENING 11/08/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/18 R.E. NAME: BRAR, PARAMDEEP DATE OF THIS ESTIMATE 03/21/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY HIGH-VISIBILITY FENCE LF 2.7500 16,610.00 0.000 0 024 CLEARING AND GRUBBING (LS) LS 35,000.0000 35,000.00 0.500 17,500.00 0.500 17,500 025 SHOULDER BACKING TON 29.0000 435,000.00 0.000 0 026 DITCH EXCAVATION CY 130.0000 59,800.00 0.000 0 027 IMPORTED BORROW (CY) CY 30.0000 32,400.00 0.000 0 028 ROCK BLANKET SQFT 85.0000 2,465.00 0.000 0 029 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 500.0000 4,000.00 0.000 0 030 HYDROMULCH SQFT 0.0300 8,820.00 0.000 0 031 FIBER ROLLS LF 2.5000 18,500.00 0.000 0 032 HYDROSEED SQFT 0.0600 17,640.00 0.000 0 033 COMPOST (CY) CY 50.0000 11,450.00 0.000 0 034 CLASS 2 AGGREGATE BASE (CY) CY 200.0000 1,000.00 0.000 0 035 RAPID STRENGTH CONCRETE BASE CY 650.0000 377,000.00 0.000 0 036 BASE BOND BREAKER SQYD 6.0000 1,380.00 0.000 0 037 CRACK TREATMENT LNMI 5,000.0000 85,000.00 0.000 0 038 PREPAVING INERTIAL PROFILER LS 15,000.0000 15,000.00 0.000 0 039 REPLACE ASPHALT CONCRETE SURFACING CY 255.0000 867,000.00 0.000 0 040 HOT MIX ASPHALT (TYPE A) TON 104.0000 1,102,400.00 0.000 0 041 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 114.0000 7,011,000.00 0.000 0 042 DATA CORE LS 10,000.0000 10,000.00 0.000 0 043 TACK COAT TON 700.0000 69,300.00 0.000 0 044 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.6000 1,177,800.00 0.000 0 045 STRUCTURAL CONCRETE, DRAINAGE INLET CY 2,500.0000 4,750.00 0.000 0 (F) 046 BAR REINFORCING STEEL (EPOXY COATED) LB 4.5000 17,383.50 0.000 0 (F) 047 REMOVE PEDESTRIAN BARRICADE EA 250.0000 250.00 0.000 0 048 PEDESTRIAN BARRICADE EA 1,400.0000 1,400.00 0.000 0 049 18" ALTERNATIVE PIPE CULVERT LF 180.0000 167,400.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 03/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H2004 TIME 01:03 PM ESTIMATE NO. 001 BID OPENING 11/08/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/18 R.E. NAME: BRAR, PARAMDEEP DATE OF THIS ESTIMATE 03/21/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 24" ALTERNATIVE PIPE CULVERT LF 190.0000 188,100.00 0.000 0 051 30" ALTERNATIVE PIPE CULVERT LF 300.0000 7,800.00 0.000 0 052 36" ALTERNATIVE PIPE CULVERT LF 390.0000 31,200.00 0.000 0 053 18" CORRUGATED STEEL PIPE (.079" THICK) LF 200.0000 4,000.00 0.000 0 054 21" X 15" CORRUGATED STEEL PIPE ARCH LF 220.0000 268,400.00 0.000 0 (.079" THICK) 055 28" X 20" CORRUGATED STEEL PIPE ARCH LF 190.0000 19,000.00 0.000 0 (.079" THICK) 056 35" X 24" CORRUGATED STEEL PIPE ARCH LF 210.0000 8,400.00 0.000 0 (.079" THICK) 057 CLASS 3 PERMEABLE MATERIAL (BLANKET) CY 270.0000 16,470.00 0.000 0 (F) 058 18" ALTERNATIVE FLARED END SECTION EA 400.0000 2,000.00 0.000 0 059 24" ALTERNATIVE FLARED END SECTION EA 600.0000 1,800.00 0.000 0 060 21" X 15" ALTERNATIVE FLARED END PIPE EA 400.0000 10,000.00 0.000 0 ARCH SECTION 061 REMOVE CULVERT (EA) EA 350.0000 16,100.00 0.000 0 062 REMOVE REINFORCED CONCRETE BOX CULVERT EA 2,500.0000 2,500.00 0.000 0 (EA) 063 REMOVE FLARED END SECTION (EA) EA 125.0000 3,375.00 0.000 0 064 DETECTABLE WARNING SURFACE SQFT 40.0000 12,800.00 0.000 0 065 MINOR CONCRETE (CURB, SIDEWALK AND CY 1,000.0000 37,000.00 0.000 0 CURB RAMP) 066 REMOVE CONCRETE ISLAND (PORTIONS) (CY) CY 340.0000 3,060.00 0.000 0 067 REMOVE CONCRETE CY 420.0000 12,180.00 0.000 0 (CURB, GUTTER, AND SIDEWALK) (CY) 068 PRE/POST CONSTRUCTION SURVEYS EA 500.0000 4,000.00 0.000 0 069 MISCELLANEOUS IRON AND STEEL LB 2.2400 1,070.72 0.000 0 (F) 070 REMOVE PAVEMENT MARKER EA 1.0000 5,900.00 0.000 0 071 DELINEATOR (CLASS 1) EA 40.0000 15,200.00 0.000 0 072 DELINEATOR (CLASS 2) EA 50.0000 9,000.00 0.000 0 073 GUARD RAILING DELINEATOR EA 30.0000 2,130.00 0.000 0 074 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 18,090.00 0.000 0 075 OBJECT MARKER (TYPE P) EA 75.0000 750.00 0.000 0 076 OBJECT MARKER (TYPE R) EA 100.0000 1,600.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 03/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H2004 TIME 01:03 PM ESTIMATE NO. 001 BID OPENING 11/08/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/18 R.E. NAME: BRAR, PARAMDEEP DATE OF THIS ESTIMATE 03/21/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.0000 2,000.00 0.000 0 (0.063"-UNFRAMED) 078 ROADSIDE SIGN - ONE POST EA 260.0000 6,760.00 0.000 0 079 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 26.7500 59,385.00 0.000 0 080 VEGETATION CONTROL (MINOR CONCRETE) SQYD 70.0000 249,200.00 0.000 0 081 DOUBLE MIDWEST GUARDRAIL SYSTEM LF 38.7500 38,750.00 0.000 0 (WOOD POST) 082 RAIL TENSIONING ASSEMBLY EA 725.0000 7,250.00 0.000 0 083 END ANCHOR ASSEMBLY (TYPE SFT) EA 695.0000 11,120.00 0.000 0 084 SOFTSTOP TERMINAL SYSTEM EA 3,300.0000 6,600.00 0.000 0 085 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,500.0000 7,500.00 0.000 0 086 CRASH CUSHION (TYPE CAT) EA 5,500.0000 66,000.00 0.000 0 087 REMOVE SINGLE METAL BEAM BARRIER LF 4.0000 11,480.00 0.000 0 088 REMOVE DOUBLE METAL BEAM BARRIER LF 7.0000 9,030.00 0.000 0 089 REMOVE CRASH CUSHION (SAND FILLED) EA 200.0000 2,800.00 0.000 0 090 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 70,200.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 091 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 22,225.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 18-12) 092 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 590.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 093 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.1400 127.40 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 094 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 171,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 095 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 767.50 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 096 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 9,960.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 097 MODIFYING EXISTING ELECTRICAL SYSTEM LS 174,000.0000 174,000.00 0.000 0 098 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 099 REMOVE CONCRETE (CY) CY 250.0000 10,500.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 03/21/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H2004 TIME 01:03 PM ESTIMATE NO. 001 BID OPENING 11/08/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/18 R.E. NAME: BRAR, PARAMDEEP DATE OF THIS ESTIMATE 03/21/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 130,654.00 130,654.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 130,654.00 130,654.00 100 MOBILIZATION LS 1,370,000.0000 1,370,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 15,286,054.12 TOTAL WORK COMPLETED 130,654.00 130,654.00 MATERIALS ON HAND ON SITE 31,804.78 31,804.78 DEDUCTIONS 0.00 0.00 TOTAL 162,458.78 162,458.78 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/22/17 90 01/19/18 01/19/18 07/13/18 0 0 0 0 1% 0% PROGRESS IS SATISFACTORY *** SUSPENDED ON 01/19/18. BRAR, PARAMDEEP RESIDENT ENGINEER PROGRAM CAS145 DATE 03/21/18