PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/20/19 EST. NO. 003 TIME 01:49 PM R.E. NAME: NIKZAD, ALI 04-4H7514 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/20/19 EST. NO. 003 TIME 01:49 PM R.E. NAME: NIKZAD, ALI 04-4H7514 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/20/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H7514 TIME 01:49 PM ESTIMATE NO. 003 BID OPENING 04/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/19 R.E. NAME: NIKZAD, ALI DATE OF THIS ESTIMATE 02/20/19 LOCATION PROGRESS ESTIMATE 04-SF-82-0.0/0.1 ----------------- 04-SCL-82-10.2/26.3 DREAMBUILDER CONSTRUCTION IN SANTA CLARA AND SAN FRANCISCO 04-SCL-130-2.3/2.6 CORP. COUNTIES ON ROUTE 80,82,AND 130 1324 LAWSON LN AT VARIOUS LOCATIONS. PLACENTIA CA 92870 FED. AID NO. HSST-000C(460)E INSTALL PEDESTRIAN CROSSWALK SAFETY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,800.0000 3,800.00 0.750 2,850.00 0.750 2,850 002 CONSTRUCTION AREA SIGNS LS 27,000.0000 27,000.00 0.700 18,900.00 0.700 18,900 003 TRAFFIC CONTROL SYSTEM LS 150,000.0000 150,000.00 0.070 10,500.00 0.070 10,500 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 9,300.0000 9,300.00 0.070 651.00 0.070 651 005 JOB SITE MANAGEMENT LS 8,500.0000 8,500.00 0.070 595.00 0.070 595 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 825.0000 825.00 0.750 618.75 0.750 618 007 TEMPORARY DRAINAGE INLET PROTECTION EA 168.0000 4,200.00 15.000 2,520.00 15.000 2,520 008 STREET SWEEPING LS 3,000.0000 3,000.00 0.070 210.00 0.070 210 009 TEMPORARY CONCRETE WASHOUT LS 4,000.0000 4,000.00 0.000 0 010 REMOVE CONCRETE (CY) CY 420.0000 92,400.00 0.000 0 011 CLEARING AND GRUBBING (LS) LS 6,800.0000 6,800.00 0.000 0 012 ROADWAY EXCAVATION CY 110.0000 18,700.00 0.000 0 013 PRUNE EXISTING PLANTS LS 8,000.0000 8,000.00 0.000 0 014 CLASS 2 AGGREGATE BASE (CY) CY 295.0000 38,350.00 0.000 0 015 HOT MIX ASPHALT (TYPE A) TON 360.0000 90,000.00 0.000 0 016 TACK COAT TON 2,350.0000 705.00 0.000 0 017 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,100.0000 13,020.00 0.000 0 (F) 018 MINOR CONCRETE CY 985.0000 241,325.00 0.000 0 (F) 019 PEDESTRIAN BARRICADE EA 1,000.0000 4,000.00 0.000 0 020 REMOVE CULVERT (LF) LF 180.0000 1,800.00 0.000 0 021 REMOVE INLET EA 1,880.0000 3,760.00 0.000 0 022 ADJUST FRAME AND GRATE TO GRADE EA 2,900.0000 8,700.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 02/20/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H7514 TIME 01:49 PM ESTIMATE NO. 003 BID OPENING 04/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/19 R.E. NAME: NIKZAD, ALI DATE OF THIS ESTIMATE 02/20/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 DETECTABLE WARNING SURFACE SQFT 23.0000 14,030.00 0.000 0 024 REMOVE CONCRETE (CURB AND GUTTER) LF 14.0000 18,060.00 0.000 0 025 MISCELLANEOUS IRON AND STEEL LB 2.6000 3,083.60 0.000 0 (F) 026 REMOVE ROADSIDE SIGN EA 60.0000 3,840.00 0.000 0 027 RELOCATE ROADSIDE SIGN EA 295.0000 3,835.00 0.000 0 028 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.0000 3,360.00 0.000 0 (0.063"-UNFRAMED) 029 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 209.00 0.000 0 (0.063" UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 030 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.0000 95.00 0.000 0 031 ROADSIDE SIGN - ONE POST EA 323.0000 2,584.00 0.000 0 032 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 295.0000 295.00 0.000 0 METHOD) 033 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 10.0000 67,700.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 034 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.6000 13,984.00 0.000 0 035 SIGNAL AND LIGHTING SYSTEM LS 2,156,000.0000 2,156,000.00 0.030 64,680.00 0.030 64,680 036 MODIFYING EXISTING ELECTRICAL SYSTEM LS 423,800.4000 423,800.40 0.000 0 PROGRAM CAS145 PAGE 3 DATE 02/20/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H7514 TIME 01:49 PM ESTIMATE NO. 003 BID OPENING 04/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/19 R.E. NAME: NIKZAD, ALI DATE OF THIS ESTIMATE 02/20/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 101,524.75 101,524.75 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 101,524.75 101,524.75 037 MOBILIZATION LS 368,000.0000 368,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 3,817,061.00 TOTAL WORK COMPLETED 101,524.75 101,524.75 MATERIALS ON HAND ON SITE 4,860.31 34,856.58 DEDUCTIONS 0.00 0.00 TOTAL 106,385.06 136,381.33 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/18/18 90 01/22/19 06/04/18 06/10/19 14 163 0 0 3% 16% PROGRESS IS SATISFACTORY NIKZAD, ALI RESIDENT ENGINEER PROGRAM CAS145 DATE 02/20/19