PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/26/20 EST. NO. 021 TIME 02:31 PM R.E. NAME: NIKZAD, ALI 04-4H7514 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0004 2,010.72 E.W. @ F.A.(+) 102919 N 4 0 0005 834.90 102919 N 5 0 0006 2,219.45 103019 N 6 0 0007 2,240.32 103119 N 7 0 0009 2,240.32 110119 N 699665 0010 2,240.32 110419 N 10 0 0011 2,566.81 111819 N 11 0 0012 1,952.46 022020 N 12 0 0016 1,875.81 072220 N 16 0 0017 4,520.37 072420 N 17 0 007 0003 2,936.45 E.W. @ L.S.(+) 080520 N 003 0 010 0004 1,371.11 E.W. @ F.A.(+) 070120 N 4 0 015 0001 5,901.46 E.W. @ F.A.(+) 072220 N 1 0 0002 7,235.83 072320 N 2 0 0003 4,008.62 072420 N 3 0 0005 29,000.00 072420 N 5 0 73,154.95 TOTAL THIS ESTIMATE 605,550.29 TOTAL PREVIOUS ESTIMATE 678,705.24 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/26/20 EST. NO. 021 TIME 02:31 PM R.E. NAME: NIKZAD, ALI 04-4H7514 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CPM SCHEDULE -10,000.00 004 CPM SCHEDULE -10,000.00 005 RE-STAKING -3,304.00 013 CPM SCHED- UPDATED 20,000.00 020 0.00 -3,304.00 TOTAL DEDUCTIONS 0.00 -3,304.00 PROGRAM CAS145 PAGE 1 DATE 08/26/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H7514 TIME 02:31 PM ESTIMATE NO. 021 BID OPENING 04/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NIKZAD, ALI DATE OF THIS ESTIMATE 08/26/20 LOCATION RERUN PROGRESS ESTIMATE 04-SF-82-0.0/0.1 ----------------------- 04-SCL-82-10.2/26.3 DREAMBUILDER CONSTRUCTION IN SANTA CLARA AND SAN FRANCISCO 04-SCL-130-2.3/2.6 CORP. COUNTIES ON ROUTE 80,82,AND 130 18543 YORBA LINDA BLVD #346 AT VARIOUS LOCATIONS. YORBA LINDA, CA 92886 FED. AID NO. HSST-000C(460)E INSTALL PEDESTRIAN CROSSWALK SAFETY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,800.0000 3,800.00 1.000 3,800 002 CONSTRUCTION AREA SIGNS LS 27,000.0000 27,000.00 0.800 21,600 003 TRAFFIC CONTROL SYSTEM LS 150,000.0000 150,000.00 0.950 142,500 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 9,300.0000 9,300.00 1.000 9,300 005 JOB SITE MANAGEMENT LS 8,500.0000 8,500.00 1.000 8,500 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 825.0000 825.00 1.000 825 007 TEMPORARY DRAINAGE INLET PROTECTION EA 168.0000 4,200.00 15.000 2,520 008 STREET SWEEPING LS 3,000.0000 3,000.00 1.000 3,000 009 TEMPORARY CONCRETE WASHOUT LS 4,000.0000 4,000.00 1.000 4,000 010 REMOVE CONCRETE (CY) CY 420.0000 92,400.00 214.000 89,880 011 CLEARING AND GRUBBING (LS) LS 6,800.0000 6,800.00 1.000 6,800 012 ROADWAY EXCAVATION CY 110.0000 18,700.00 243.600 26,796 013 PRUNE EXISTING PLANTS LS 8,000.0000 8,000.00 1.000 8,000 014 CLASS 2 AGGREGATE BASE (CY) CY 295.0000 38,350.00 159.480 47,046 015 HOT MIX ASPHALT (TYPE A) TON 360.0000 90,000.00 -82.000 -29,520.00 142.120 51,163 016 TACK COAT TON 2,350.0000 705.00 0.230 540 017 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,100.0000 13,020.00 4.200 13,020 (F) 018 MINOR CONCRETE CY 985.0000 241,325.00 217.500 214,237 (F) 019 PEDESTRIAN BARRICADE EA 1,000.0000 4,000.00 15.000 15,000 020 REMOVE CULVERT (LF) LF 180.0000 1,800.00 10.000 1,800 021 REMOVE INLET EA 1,880.0000 3,760.00 2.000 3,760 022 ADJUST FRAME AND GRATE TO GRADE EA 2,900.0000 8,700.00 2.000 5,800 PROGRAM CAS145 PAGE 2 DATE 08/26/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H7514 TIME 02:31 PM ESTIMATE NO. 021 BID OPENING 04/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NIKZAD, ALI DATE OF THIS ESTIMATE 08/26/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 DETECTABLE WARNING SURFACE SQFT 23.0000 14,030.00 652.500 15,007 024 REMOVE CONCRETE (CURB AND GUTTER) LF 14.0000 18,060.00 1,290.000 18,060 025 MISCELLANEOUS IRON AND STEEL LB 2.6000 3,083.60 1,186.000 3,083 (F) 026 REMOVE ROADSIDE SIGN EA 60.0000 3,840.00 52.000 3,120 027 RELOCATE ROADSIDE SIGN EA 295.0000 3,835.00 26.000 7,670 028 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.0000 3,360.00 522.500 6,270 (0.063"-UNFRAMED) 029 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 209.00 19.000 209 (0.063" UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 030 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.0000 95.00 19.000 95 031 ROADSIDE SIGN - ONE POST EA 323.0000 2,584.00 55.000 17,765 032 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 295.0000 295.00 16.000 4,720 METHOD) 033 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 10.0000 67,700.00 6,169.000 61,690 MARKING (ENHANCED WET NIGHT VISIBILITY) 034 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.6000 13,984.00 5,629.000 25,893 035 SIGNAL AND LIGHTING SYSTEM LS 2,156,000.0000 2,156,000.00 1.000 2,156,000 036 MODIFYING EXISTING ELECTRICAL SYSTEM LS 423,800.4000 423,800.40 1.000 423,800 PROGRAM CAS145 PAGE 3 DATE 08/26/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H7514 TIME 02:31 PM ESTIMATE NO. 021 BID OPENING 04/10/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: NIKZAD, ALI DATE OF THIS ESTIMATE 08/26/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION -29,520.00 3,423,272.70 ADJUSTMENT OF COMPENSATION 0.00 92,707.31 EXTRA WORK 73,154.95 585,997.93 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 43,634.95 4,101,977.94 037 MOBILIZATION LS 368,000.0000 368,000.00 1.000 368,000 ORIGINAL CONTRACT AMOUNT 3,817,061.00 TOTAL WORK COMPLETED 43,634.95 4,469,977.94 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -3,304.00 TOTAL 43,634.95 4,466,673.94 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/18/18 90 01/22/19 06/04/18 09/03/20 186 367 106 0 98% 95% PROGRESS IS SATISFACTORY NIKZAD, ALI RESIDENT ENGINEER PROGRAM CAS145 DATE 08/26/20