PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/19/16 EST. NO. 002 TIME 11:29 AM R.E. NAME: AHMADZADEH, ALI 04-4H8304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/19/16 EST. NO. 002 TIME 11:29 AM R.E. NAME: AHMADZADEH, ALI 04-4H8304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/19/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H8304 TIME 11:29 AM ESTIMATE NO. 002 BID OPENING 09/23/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/16 R.E. NAME: AHMADZADEH, ALI DATE OF THIS ESTIMATE 05/19/16 LOCATION PROGRESS ESTIMATE 04-ALA-24-0.0/ .0 ----------------- WESTERN STRUCTURES IN ALAMEDA COUNY AT VARIOUS 6005 TYLER STREET LOCATIONS ON ROUTES 24,580,680,880, RIVERSIDE CA 92503 AND 980 FED. AID NO. BHNH-P ( ) ,XOO1-603 (E ) BRIDGE REPAIR WORK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,240.0000 3,240.00 0.750 2,430 002 CONSTRUCTION AREA SIGNS LS 30,601.8000 30,601.80 0.700 21,421 003 TRAFFIC CONTROL SYSTEM LS 192,214.0800 192,214.08 0.250 48,053.52 0.250 48,053 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 11,340.0000 11,340.00 0.250 2,835.00 0.250 2,835 005 JOB SITE MANAGEMENT LS 3,996.0000 3,996.00 0.250 999.00 0.250 999 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,430.0000 2,430.00 0.750 1,822 007 STREET SWEEPING LS 29,160.0000 29,160.00 0.000 0 008 TEMPORARY CONCRETE WASHOUT LS 1,933.2000 1,933.20 0.000 0 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 4.9600 32,785.60 2,454.200 12,172.83 2,454.200 12,172 STRIPE (HAZARDOUS WASTE) 010 REMOVE YELLOW THERMOPLASTIC PAVEMENT SQFT 27.5400 3,855.60 0.000 0 MARKING (HAZARDOUS WASTE) 011 PUBLIC SAFETY PLAN LS 550.8000 550.80 0.000 0 012 PAINT BRIDGE IDENTIFICATION EA 87.3000 3,142.80 0.000 0 013 RAPID SETTING CONCRETE (PATCH) CF 58.5100 86,068.21 34.000 1,989.34 34.000 1,989 014 REPAIR SPALLED SURFACE AREA SQFT 744.7596 6,628.36 0.000 0 015 REMOVE PAINTED TRAFFIC STRIPE LF 0.5400 1,598.40 2,354.000 1,271.16 2,354.000 1,271 016 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.7500 35,200.00 8,267.000 22,734.25 8,267.000 22,734 017 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.1600 1,598.40 733.000 1,583.28 733.000 1,583 018 REMOVE PAVEMENT MARKER EA 1.1000 1,694.00 800.000 880.00 800.000 880 019 REMOVE CONCRETE DECK SURFACE SQFT 1.3000 133,640.00 0.000 0 020 REMOVE UNSOUND CONCRETE CF 60.0400 88,318.84 34.000 2,041.36 34.000 2,041 021 POLYESTER CONCRETE EXPANSION DAM CF 1,375.3500 11,002.80 0.000 0 022 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1300 35,850.10 50,000.000 6,500.00 50,000.000 6,500 PROGRAM CAS145 PAGE 2 DATE 05/19/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H8304 TIME 11:29 AM ESTIMATE NO. 002 BID OPENING 09/23/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/16 R.E. NAME: AHMADZADEH, ALI DATE OF THIS ESTIMATE 05/19/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FURNISH POLYESTER CONCRETE OVERLAY CF 66.9300 689,579.79 0.000 0 024 PLACE POLYESTER CONCRETE OVERLAY SQFT 1.2200 125,796.64 0.000 0 025 TREAT BRIDGE DECK SQFT 0.2300 39,711.34 50,000.000 11,500.00 50,000.000 11,500 (F) 026 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 55.6700 106,830.73 596.000 33,179.32 596.000 33,179 027 REMOVE CHIP SEAL SQFT 22.1400 5,114.34 0.000 0 028 BRIDGE REMOVAL (PORTION), LOCATION A LS 29,042.2800 29,042.28 0.000 0 029 BRIDGE REMOVAL (PORTION), LOCATION B LS 29,042.2800 29,042.28 0.000 0 030 BRIDGE REMOVAL (PORTION), LOCATION C LS 6,627.4200 6,627.42 0.000 0 031 BRIDGE REMOVAL (PORTION), LOCATION D LS 17,013.2400 17,013.24 0.000 0 032 BRIDGE REMOVAL (PORTION), LOCATION E LS 17,470.0800 17,470.08 0.000 0 033 BRIDGE REMOVAL (PORTION), LOCATION F LS 13,153.8600 13,153.86 0.000 0 034 BRIDGE REMOVAL (PORTION), LOCATION G LS 26,102.5200 26,102.52 0.000 0 035 STRUCTURAL CONCRETE, BRIDGE CY 667.1800 30,023.10 0.000 0 (F) 036 DRILL AND BOND DOWEL LF 11.5900 9,700.83 0.000 0 037 CLEAN EXPANSION JOINT LF 16.2000 105,559.20 0.000 0 038 JOINT SEAL (MR 1/2") LF 25.9200 31,881.60 0.000 0 039 JOINT SEAL (MR 1") LF 36.7200 113,207.76 0.000 0 040 JOINT SEAL (MR 1 1/2") LF 84.2400 74,636.64 0.000 0 041 JOINT SEAL ASSEMBLY (MR 3") LF 235.2000 15,758.40 0.000 0 042 JOINT SEAL (MR 2") LF 166.3200 249,812.64 0.000 0 043 JOINT SEAL (TYPE AL) LF 28.0800 31,449.60 0.000 0 044 BAR REINFORCING STEEL (BRIDGE) LB 2.3500 13,303.35 0.000 0 (F) 045 MINOR CONCRETE (CURB) (CY) CY 59,139.5000 5,913.95 0.000 0 046 DELINEATOR (CLASS 1) EA 93.9200 20,662.40 0.000 0 047 OBJECT MARKER (TYPE P) EA 125.2700 375.81 0.000 0 048 THERMOPLASTIC PAVEMENT MARKING SQFT 16.2000 14,256.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 049 4"TWO-COMPONENT PAINT TRAFFIC STRIPE LF 2.9200 41,756.00 0.000 0 (BLACK) PROGRAM CAS145 PAGE 3 DATE 05/19/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H8304 TIME 11:29 AM ESTIMATE NO. 002 BID OPENING 09/23/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/16 R.E. NAME: AHMADZADEH, ALI DATE OF THIS ESTIMATE 05/19/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 4"TWO-COMPONENT PAINT TRAFFIC STRIPE LF 1.4600 16,498.00 0.000 0 (BLACK-BROKEN) 051 8"TWO-COMPONENT PAINT TRAFFIC STRIPE LF 5.9400 2,257.20 0.000 0 (BLACK-BROKEN) 052 4" THERMOPLASTIC TRAFFIC STRIPE LF 3.2400 38,880.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 053 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.6200 1,782.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 054 8" THERMOPLASTIC TRAFFIC STRIPE LF 6.4800 9,979.20 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 055 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.2400 1,231.20 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 056 4"THERMOPLASTIC TRAFFIC STRIPE LF 1.6200 15,390.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 34-14) 057 PAVEMENT MARKER (NON-REFLECTIVE) EA 7.5600 7,408.80 0.000 0 058 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.8000 6,048.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 05/19/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4H8304 TIME 11:29 AM ESTIMATE NO. 002 BID OPENING 09/23/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/16 R.E. NAME: AHMADZADEH, ALI DATE OF THIS ESTIMATE 05/19/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 145,739.06 171,412.82 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 145,739.06 171,412.82 059 MOBILIZATION LS 281,929.6300 281,929.63 0.500 140,964.82 0.500 140,964 ORIGINAL CONTRACT AMOUNT 2,962,034.82 TOTAL WORK COMPLETED 286,703.88 312,377.64 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 286,703.88 312,377.64 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/04/15 150 03/21/16 00/00/00 10/26/16 41 83 0 0 11% 27% PROGRESS IS SATISFACTORY AHMADZADEH, ALI RESIDENT ENGINEER PROGRAM CAS145 DATE 05/19/16