PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/18/18 EST. NO. 003 TIME 01:54 PM R.E. NAME: SINGH, RANJEET 04-4J7004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/18/18 EST. NO. 003 TIME 01:54 PM R.E. NAME: SINGH, RANJEET 04-4J7004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4J7004 TIME 01:54 PM ESTIMATE NO. 003 BID OPENING 05/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/18 R.E. NAME: SINGH, RANJEET DATE OF THIS ESTIMATE 01/18/18 LOCATION PROGRESS ESTIMATE 04-CC-4-M34.4/M34.4 ----------------- 04-CC-242-R0.1/R0.1 AMERICAN CIVIL CONSTRUCTORS IN CONTRA COSTA COUNTY AT VARIOUS 04-CC-580-R4.1/R4.1 WEST COAST LLC LOCATIONS 2990 BAY VISTA COURT, SUITE D BENICIA CA 94510 FED. AID NO. N O N E TREAT BRIDGE DECK WITH METHACRYLATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 1.000 4,000 002 CONSTRUCTION AREA SIGNS LS 11,000.0000 11,000.00 0.700 7,700 003 TRAFFIC CONTROL SYSTEM LS 325,000.0000 325,000.00 0.500 162,500 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.500 5,000 005 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.500 1,250 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.750 750 007 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 2,250.00 8.000 1,200 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 8.9500 5,638.50 412.000 3,687 STRIPE (HAZARDOUS WASTE) 009 NOISE MONITORING LS 1,500.0000 1,500.00 0.000 0 010 TEMPORARY DECKING LS 65,000.0000 65,000.00 0.000 0 011 STRUCTURAL CONCRETE, BRIDGE CY 2,750.0000 170,500.00 2.000 5,500.00 25.000 68,750 (F) 012 DRILL AND BOND DOWEL LF 70.0000 19,320.00 0.000 0 013 CLEAN EXPANSION JOINT LF 15.0000 10,680.00 442.000 6,630 014 JOINT SEAL (MR 1/2") LF 30.0000 7,320.00 232.000 6,960 015 JOINT SEAL ASSEMBLY (MR 4") LF 220.0000 133,760.00 60.000 13,200 016 JOINT SEAL (MR 2") LF 90.0000 13,500.00 150.000 13,500 017 BAR REINFORCING STEEL (BRIDGE) LB 1.7500 13,952.75 5,225.000 9,143 (F) 018 GALVANIC ANODE EA 30.0000 3,780.00 24.000 720.00 24.000 720 019 CLEAN STRUCTURAL STEEL (EXISTING BRIDGE) LS 5,130.0000 5,130.00 0.000 0 020 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 43.7100 31,689.75 0.000 0 021 REPAIR SPALLED SURFACE AREA SQFT 900.0000 33,300.00 0.000 0 022 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.5000 8,081.50 16,173.100 8,086 PROGRAM CAS145 PAGE 2 DATE 01/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4J7004 TIME 01:54 PM ESTIMATE NO. 003 BID OPENING 05/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/18 R.E. NAME: SINGH, RANJEET DATE OF THIS ESTIMATE 01/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREAT BRIDGE DECK SQFT 1.0000 16,163.00 16,163.000 16,163 (F) 024 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 60.0000 10,800.00 173.000 10,380 025 BRIDGE REMOVAL (PORTION), LOCATION A LS 180,000.0000 180,000.00 0.000 0 026 BRIDGE REMOVAL (PORTION), LOCATION B LS 340,000.0000 340,000.00 0.350 119,000 027 PAINT BRIDGE IDENTIFICATION EA 500.0000 1,000.00 0.000 0 028 MISCELLANEOUS METAL (BRIDGE) LB 30.0000 23,220.00 0.000 0 (F) 029 REMOVE PAVEMENT MARKER EA 15.0000 900.00 53.000 795 030 PAVEMENT MARKER (NON-REFLECTIVE) EA 31.0000 620.00 0.000 0 031 PAVEMENT MARKER (RETROREFLECTIVE) EA 34.0000 1,360.00 26.000 884 032 4" THERMOPLASTIC TRAFFIC STRIPE LF 6.0500 1,149.50 400.000 2,420 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 34-14) 033 4" BLACK PAINT TRAFFIC STRIPE (2-COAT) LF 1.2500 2,037.50 1,478.000 1,847 034 4" THERMOPLASTIC TRAFFIC STRIPE LF 6.5500 8,187.50 1,156.000 7,571 (ENHANCED WET NIGHT VISIBILITY) 035 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.1000 2,170.00 615.000 1,906 PROGRAM CAS145 PAGE 3 DATE 01/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4J7004 TIME 01:54 PM ESTIMATE NO. 003 BID OPENING 05/10/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/18 R.E. NAME: SINGH, RANJEET DATE OF THIS ESTIMATE 01/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 6,220.00 474,045.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 6,220.00 474,045.50 036 MOBILIZATION LS 160,000.0000 160,000.00 0.950 152,000 ORIGINAL CONTRACT AMOUNT 1,626,510.00 TOTAL WORK COMPLETED 6,220.00 626,045.50 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 6,220.00 626,045.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/22/17 135 10/12/17 09/12/17 06/01/18 54 33 0 0 38% 40% PROGRESS IS SATISFACTORY SINGH, RANJEET RESIDENT ENGINEER PROGRAM CAS145 DATE 01/18/18