PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/22/11 EST. NO.02 TIME 09:16 AM R.E. NAME: RUSSELL, STEVE 04-4S5404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/22/11 EST. NO.02 TIME 09:16 AM R.E. NAME: RUSSELL, STEVE 04-4S5404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4S5404 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 04/20/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/11 R.E. NAME: RUSSELL, STEVE DATE OF THIS ESTIMATE 09/22/11 LOCATION PROGRESS ESTIMATE 04-MRN-1-15.0/17.0 ----------------- GHILOTTI BROTHERS, INC. IN MARIN COUNTY NEAR STINSON BEACH 525 JACOBY STREET FROM 2.2 MILE NORTH OF CALLE DEL SAN RAFAEL, CA 94901 ARROYO AT BOLINAS ROAD FED. AID NO. ACST-PP00(155)4E DRAINAGE SYSTEM REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 SMALL BUSINESS UTILIZATION REPORT EA 50.0000 100.00 0.000 0.00 002 TEMPORARY REINFORCED SILT FENCE LF 14.0000 19,600.00 262.000 3,668.00 003 CONSTRUCTION SITE MANAGEMENT LS 10,000.0000 10,000.00 0.210 2,100.00 0.360 3,600.00 004 PREPARE STORM WATER POLLUTION LS 2,500.0000 2,500.00 0.144 360.00 0.644 1,610.00 PREVENTION PLAN 005 TEMPORARY GRAVEL BAG BERM LF 6.7500 74,250.00 520.000 3,510.00 4,039.500 27,266.63 006 TEMPORARY CONSTRUCTION ENTRANCE EA 5,750.0000 11,500.00 1.000 5,750.00 007 TEMPORARY DRAINAGE INLET PROTECTION EA 225.0000 3,600.00 8.000 1,800.00 8.000 1,800.00 008 STREET SWEEPING LS 5,000.0000 5,000.00 0.000 0.00 009 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 0.000 0.00 010 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.500 2,500.00 011 TRAFFIC CONTROL SYSTEM LS 30,000.0000 30,000.00 0.210 6,300.00 0.360 10,800.00 012 TEMPORARY DELINEATOR (CLASS 2) EA 45.0000 9,000.00 143.000 6,435.00 013 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,000.0000 5,000.00 0.100 500.00 0.600 3,000.00 014 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.3000 6,210.00 0.000 0.00 STRIPE (HAZARDOUS WASTE) 015 REMOVE MARKER EA 1.0000 43.00 0.000 0.00 016 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.0500 1,035.00 0.000 0.00 017 REMOVE PAVEMENT MARKER EA 1.0000 290.00 0.000 0.00 018 REMOVE CULVERT LF 5.0000 2,150.00 275.300 1,376.50 426.900 2,134.50 019 REMOVE INLET EA 400.0000 3,200.00 6.000 2,400.00 9.000 3,600.00 020 REMOVE HEADWALL EA 400.0000 400.00 2.000 800.00 3.000 1,200.00 021 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.0000 75,300.00 0.000 0.00 022 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 PROGRAM CAS145 PAGE 2 DATE 09/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4S5404 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 04/20/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/11 R.E. NAME: RUSSELL, STEVE DATE OF THIS ESTIMATE 09/22/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 DITCH EXCAVATION CY 300.0000 1,800.00 5.800 1,740.00 6.100 1,830.00 024 IMPORTED MATERIAL (SHOULDER BACKING) TON 75.0000 9,150.00 0.000 0.00 025 FIBER ROLLS LF 7.2500 2,175.00 0.000 0.00 026 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.4600 1,380.00 0.000 0.00 027 ROLLED EROSION CONTROL PRODUCT SQFT 1.0000 1,500.00 0.000 0.00 (NETTING) 028 ASPHALT TREATED PERMEABLE BASE CY 240.0000 45,600.00 0.000 0.00 029 HOT MIX ASPHALT (TYPE A) TON 121.0000 701,800.00 0.000 0.00 030 HOT MIX ASPHALT (OPEN GRADED) TON 130.0000 49,400.00 0.000 0.00 031 MINOR HOT MIX ASPHALT TON 155.0000 12,090.00 18.760 2,907.80 23.960 3,713.80 032 HOT MIX ASPHALT TON 141.0000 150,870.00 0.000 0.00 (BONDED WEARING COURSE-GAP GRADED) 033 ASPHALTIC EMULSION MEMBRANE TON 775.0000 16,275.00 0.000 0.00 (BONDED WEARING COURSE) 034 DATA CORE LS 1,000.0000 1,000.00 0.000 0.00 035 PLACE HOT MIX ASPHALT SQYD 40.0000 10,400.00 0.000 0.00 (MISCELLANEOUS AREA) 036 LIQUID ASPHALT (PRIME COAT) TON 1,200.0000 2,760.00 0.000 0.00 037 TACK COAT TON 950.0000 9,500.00 0.000 0.00 038 MINOR CONCRETE CY 400.0000 17,600.00 33.300 13,320.00 43.500 17,400.00 039 MINOR CONCRETE (MINOR STRUCTURE) CY 1,100.0000 30,800.00 20.810 22,891.00 27.970 30,767.00 (F) 040 MINOR CONCRETE (BACKFILL) CY 400.0000 24,800.00 23.300 9,320.00 34.400 13,760.00 041 18" PLASTIC PIPE LF 100.0000 49,000.00 357.100 35,710.00 487.600 48,760.00 042 18" CORRUGATED STEEL PIPE (.064" THICK) LF 125.0000 2,125.00 17.000 2,125.00 17.000 2,125.00 043 6" PERFORATED PLASTIC PIPE UNDERDRAIN LF 9.0000 18,180.00 0.000 0.00 044 6" PLASTIC PIPE LF 17.0000 6,290.00 136.000 2,312.00 136.000 2,312.00 045 PERMEABLE MATERIAL (BLANKET) CY 200.0000 76,000.00 0.000 0.00 046 CLASS 1 PERMEABLE MATERIAL CY 110.0000 14,300.00 0.000 0.00 047 18" PLASTIC FLARED END SECTION EA 350.0000 4,900.00 9.000 3,150.00 14.000 4,900.00 048 24" PLASTIC FLARED END SECTION EA 400.0000 400.00 1.000 400.00 1.000 400.00 049 ROCK SLOPE PROTECTION (LIGHT, METHOD B) CY 101.0000 309,060.00 1,134.375 114,571.88 1,158.775 117,036.28 PROGRAM CAS145 PAGE 3 DATE 09/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4S5404 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 04/20/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/11 R.E. NAME: RUSSELL, STEVE DATE OF THIS ESTIMATE 09/22/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 ROCK SLOPE PROTECTION FABRIC SQYD 2.5000 20,500.00 3,073.325 7,683.31 3,160.125 7,900.31 051 MINOR CONCRETE (CURB) CY 740.0000 46,620.00 0.000 0.00 052 MISCELLANEOUS IRON AND STEEL LB 1.9000 10,702.70 4,116.000 7,820.40 5,633.000 10,702.70 (F) 053 MILEPOST MARKER EA 50.0000 2,700.00 0.000 0.00 054 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 16,560.00 0.000 0.00 055 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.0000 42.00 0.000 0.00 056 PAVEMENT MARKER EA 5.0000 4,300.00 0.000 0.00 (RETROREFLECTIVE-RECESSED) PROGRAM CAS145 PAGE 4 DATE 09/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 04-4S5404 TIME 09:16 AM ESTIMATE NO. 02 BID OPENING 04/20/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/11 R.E. NAME: RUSSELL, STEVE DATE OF THIS ESTIMATE 09/22/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 243,097.89 337,471.22 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 243,097.89 337,471.22 057 MOBILIZATION LS 158,000.0000 158,000.00 0.250 39,500.00 0.750 118,500.00 ORIGINAL CONTRACT AMOUNT 2,095,757.70 TOTAL WORK COMPLETED 282,597.89 455,971.22 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 282,597.89 455,971.22 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/16/11 100 07/01/11 08/01/11 12/22/11 37 2 0 0 21% 37% PROGRESS IS SATISFACTORY RUSSELL, STEVE RESIDENT ENGINEER PROGRAM CAS145 DATE 09/22/11