PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/04 EST. NO.01 TIME 08:03 AM R.E. NAME: STIMSON, PATRICK 05-0F3004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/04 EST. NO.01 TIME 08:03 AM R.E. NAME: STIMSON, PATRICK 05-0F3004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0F3004 TIME 08:03 AM ESTIMATE NO. 01 BID OPENING 03/23/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/04 R.E. NAME: STIMSON, PATRICK DATE OF THIS ESTIMATE 06/18/04 LOCATION PROGRESS ESTIMATE 05-SB-135-13.6/17.0 ----------------- GRANITE CONSTRUCTION COMPANY IN SANTA BARBARA COUNTY IN SANTA P O BOX 50085 MARIA AT VARIOUS LOCATIONS WATSONVILLE CA 950775085 FED. AID NO. N O N E CONSTRUCT CURB RAMPS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 825.0000 825.00 0.750 618.75 0.750 618.75 PROGRAM 02 WATER POLLUTION CONTROL LS 1,400.0000 1,400.00 0.178 249.20 0.178 249.20 03 CONSTRUCTION AREA SIGNS LS 6,170.0000 6,170.00 0.650 4,010.50 0.650 4,010.50 S) 04 TRAFFIC CONTROL SYSTEM LS 12,315.0000 12,315.00 0.180 2,216.70 0.180 2,216.70 S) 05 FLASHING ARROW SIGN EA 881.0000 1,762.00 0.000 0.00 S) 06 TYPE III BARRICADE EA 37.0000 1,369.00 0.000 0.00 S) 07 TEMPORARY TRAFFIC STRIPE (TAPE) M 12.6000 6,426.00 0.000 0.00 S) 08 TEMPORARY PAVEMENT MARKING (TAPE) M 117.0000 2,808.00 0.000 0.00 S) 09 CHANNELIZER (SURFACE MOUNTED) EA 29.0000 696.00 0.000 0.00 S) 10 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 6.6000 2,904.00 0.000 0.00 STRIPE 11 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 31.0000 589.00 0.000 0.00 12 REMOVE PAVEMENT MARKER EA 1.6000 176.00 0.000 0.00 13 RESET ROADSIDE SIGN (WOOD POST) EA 46.0000 138.00 0.000 0.00 14 RESET ROADSIDE SIGN (METAL POST) EA 46.0000 138.00 0.000 0.00 15 RELOCATE ROADSIDE SIGN (METAL POST) EA 56.0000 112.00 0.000 0.00 16 REMOVE CONCRETE M3 450.0000 13,050.00 43.180 19,431.00 43.180 19,431.00 17 REMOVE BOX CULVERT (PORTION) M3 647.0000 2,588.00 2.350 1,520.45 2.350 1,520.45 18 ROADWAY EXCAVATION M3 45.8000 6,870.00 0.000 0.00 19 LEAD COMPLIANCE PLAN LS 1,610.0000 1,610.00 0.000 0.00 20 CLASS 2 AGGREGATE BASE M3 123.0000 7,257.00 0.000 0.00 21 REPLACE ASPHALT CONCRETE SURFACING M3 382.0000 3,438.00 0.000 0.00 22 ASPHALT CONCRETE (TYPE A) TONN 83.4000 20,016.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/18/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0F3004 TIME 08:03 AM ESTIMATE NO. 01 BID OPENING 03/23/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/04 R.E. NAME: STIMSON, PATRICK DATE OF THIS ESTIMATE 06/18/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CLASS 2 CONCRETE (BOX CULVERT) M3 1,560.0000 6,240.00 0.000 0.00 24 MINOR CONCRETE (BACKFILL) M3 798.0000 3,192.00 0.000 0.00 25 600 MM X 100 MM CORRUGATED STEEL PIPE M 109.0000 2,507.00 0.000 0.00 ARCH 26 MINOR CONCRETE (MISCELLANEOUS M3 770.0000 35,420.00 0.000 0.00 CONSTRUCTION) 27 THERMOPLASTIC PAVEMENT MARKING M2 37.0000 1,073.00 0.000 0.00 S) 28 THERMOPLASTIC TRAFFIC STRIPE M 2.0000 740.00 0.000 0.00 S) (SPRAYABLE) 29 PAVEMENT MARKER (NON-REFLECTIVE) EA 4.5000 198.00 0.000 0.00 S) 30 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.5000 451.00 0.000 0.00 S) 31 MODIFY SIGNAL AND LIGHTING LS 24,500.0000 24,500.00 0.700 17,150.00 0.700 17,150.00 S) PROGRAM CAS145 PAGE 3 DATE 06/18/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0F3004 TIME 08:03 AM ESTIMATE NO. 01 BID OPENING 03/23/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/04 R.E. NAME: STIMSON, PATRICK DATE OF THIS ESTIMATE 06/18/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 45,196.60 45,196.60 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 45,196.60 45,196.60 ORIGINAL CONTRACT AMOUNT 166,978.00 TOTAL WORK COMPLETED 45,196.60 45,196.60 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 45,196.60 45,196.60 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/04/04 45 00/00/00 00/00/00 08/13/04 8 13 0 0 25% 18% PROGRESS IS SATISFACTORY *** SUSPENDED ON 05/20/04. STIMSON, PATRICK RESIDENT ENGINEER PROGRAM CAS145 PAGE 6 DATE 06/18/04