PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/06 EST. NO.02 TIME 11:07 AM R.E. NAME: HOPKINS, RAMON L. 05-0G8924 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 1,809.07 E.W. @ F.A.(+) 030806 N 0001.0 0002 1,721.07 030906 N 0002.0 0003 500.86 031006 N 0003.0 0004 1,609.39 031306 N 0004.0 0005 1,514.68 031506 N 0005.0 0006 14.56 031306 N 0004.1 0007 20.52 030806 N 0001.1 0008 20.52 030906 N 0002.1 7,210.67 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 7,210.67 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/06 EST. NO.02 TIME 11:07 AM R.E. NAME: HOPKINS, RAMON L. 05-0G8924 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0G8924 TIME 11:07 AM ESTIMATE NO. 02 BID OPENING 01/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: HOPKINS, RAMON L. DATE OF THIS ESTIMATE 04/25/06 LOCATION PROGRESS ESTIMATE 05-MON-101-R7.9/R10.8 ----------------- A J DIANI CONSTRUCTION CO INC IN MONTEREY COUNTY AT BRADLEY FROM NORTH BRADLEY UNDERCROSSING TO 1.9 KM NORTH OF JOLON ROAD UNDERCROSSING FED. AID NO. N O N E WIDEN SHOULDER AND ADD RUMBLE STRIP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 1,574.0000 1,574.00 0.750 1,180.50 0.750 1,180.50 PREVENTION PLAN 02 CONSTRUCTION SITE MANAGEMENT LS 2,831.0000 2,831.00 0.000 0.00 03 TEMPORARY FIBER ROLL M 29.8000 5,960.00 0.000 0.00 04 TEMPORARY CHECK DAM EA 34.7000 1,041.00 0.000 0.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 526.0000 3,682.00 0.000 0.00 06 STREET SWEEPING LS 23,300.0000 23,300.00 0.000 0.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,600.0000 1,600.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 4,078.0000 4,078.00 0.750 3,058.50 S) 09 TRAFFIC CONTROL SYSTEM LS 39,135.0000 39,135.00 0.000 0.00 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,564.0000 7,564.00 0.000 0.00 S) 11 REMOVE SURVEY MONUMENT EA 309.0000 927.00 0.000 0.00 12 REMOVE ASPHALT CONCRETE OVERSIDE DRAIN EA 1,554.0000 3,108.00 0.000 0.00 13 ADJUST INLET EA 950.0000 6,650.00 0.000 0.00 14 CLEARING AND GRUBBING LS 7,850.0000 7,850.00 0.000 0.00 15 ROADWAY EXCAVATION M3 34.6000 103,454.00 0.000 0.00 16 IMPORTED BORROW M3 55.5000 64,935.00 0.000 0.00 17 FIBER (EROSION CONTROL) KG 2.3000 6,210.00 0.000 0.00 S) 18 COMPOST (EROSION CONTROL) M3 257.0000 5,654.00 0.000 0.00 S) 19 PURE LIVE SEED (EROSION CONTROL) KG 111.0000 18,870.00 0.000 0.00 S) 20 STABILIZING EMULSION (EROSION CONTROL) KG 6.5000 4,420.00 0.000 0.00 S) 21 CLASS 2 AGGREGATE BASE M3 55.2500 96,135.00 0.000 0.00 22 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 2,171.0000 651.30 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 04/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0G8924 TIME 11:07 AM ESTIMATE NO. 02 BID OPENING 01/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: HOPKINS, RAMON L. DATE OF THIS ESTIMATE 04/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ASPHALT CONCRETE (TYPE A) TONN 85.7000 150,832.00 0.000 0.00 24 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 36.0000 10,800.00 0.000 0.00 AREA) 25 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 28.8000 6,624.00 0.000 0.00 26 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 28.0000 280.00 0.000 0.00 27 SHOULDER RUMBLE STRIP STA 104.6000 8,368.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 28 MINOR CONCRETE (MINOR STRUCTURE) M3 1,710.0000 10,602.00 0.000 0.00 F) 29 SURVEY MONUMENT (TYPE A) EA 612.0000 1,836.00 0.000 0.00 30 DELINEATOR (CLASS 1) EA 40.7500 1,304.00 0.000 0.00 31 THERMOPLASTIC TRAFFIC STRIPE M 1.1500 8,740.00 0.000 0.00 S) (SPRAYABLE) 32 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.8300 2,332.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 04/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0G8924 TIME 11:07 AM ESTIMATE NO. 02 BID OPENING 01/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: HOPKINS, RAMON L. DATE OF THIS ESTIMATE 04/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 1,180.50 4,239.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 7,210.67 7,210.67 SUBTOTAL AMOUNT EARNED 8,391.17 11,449.67 ORIGINAL CONTRACT AMOUNT 611,347.30 TOTAL WORK COMPLETED 8,391.17 11,449.67 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 8,391.17 11,449.67 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/17/06 45 03/06/06 00/00/00 06/23/06 0 33 0 0 2% 0% PROGRESS IS SATISFACTORY HOPKINS, RAMON L. RESIDENT ENGINEER PROGRAM CAS145 PAGE 6 DATE 04/25/06