PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/10/06 EST. NO.05 TIME 01:59 PM R.E. NAME: HOPKINS, RAMON L. 05-0G8924 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0001 3,097.50 E.W. @ L.S.(+) 060106 N 0001 0 006 0001 3,875.20 E.W. @ F.A.(+) 060606 N 0006.0 0002 625.94 060606 N 0007.0 7,598.64 TOTAL THIS ESTIMATE 7,210.67 TOTAL PREVIOUS ESTIMATE 14,809.31 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/10/06 EST. NO.05 TIME 01:59 PM R.E. NAME: HOPKINS, RAMON L. 05-0G8924 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PYRLS -10,000.00 04 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 07/10/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0G8924 TIME 01:59 PM ESTIMATE NO. 05 BID OPENING 01/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/12/06 R.E. NAME: HOPKINS, RAMON L. DATE OF THIS ESTIMATE 07/10/06 LOCATION SEMI-FINAL ESTIMATE 05-MON-101-R7.9/R10.8 ------------------- A J DIANI CONSTRUCTION CO INC IN MONTEREY COUNTY AT BRADLEY FROM NORTH BRADLEY UNDERCROSSING TO 1.9 KM NORTH OF JOLON ROAD UNDERCROSSING FED. AID NO. N O N E WIDEN SHOULDER AND ADD RUMBLE STRIP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 1,574.0000 1,574.00 1.000 1,574.00 PREVENTION PLAN 02 CONSTRUCTION SITE MANAGEMENT LS 2,831.0000 2,831.00 1.000 2,831.00 03 TEMPORARY FIBER ROLL M 29.8000 5,960.00 198.390 5,912.02 04 TEMPORARY CHECK DAM EA 34.7000 1,041.00 26.000 902.20 05 TEMPORARY DRAINAGE INLET PROTECTION EA 526.0000 3,682.00 6.000 3,156.00 06 STREET SWEEPING LS 23,300.0000 23,300.00 1.000 23,300.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,600.0000 1,600.00 1.000 1,600.00 08 CONSTRUCTION AREA SIGNS LS 4,078.0000 4,078.00 1.000 4,078.00 S) 09 TRAFFIC CONTROL SYSTEM LS 39,135.0000 39,135.00 1.000 39,135.00 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,564.0000 7,564.00 1.000 7,564.00 S) 11 REMOVE SURVEY MONUMENT EA 309.0000 927.00 4.000 1,236.00 12 REMOVE ASPHALT CONCRETE OVERSIDE DRAIN EA 1,554.0000 3,108.00 2.000 3,108.00 13 ADJUST INLET EA 950.0000 6,650.00 6.000 5,700.00 14 CLEARING AND GRUBBING LS 7,850.0000 7,850.00 1.000 7,850.00 15 ROADWAY EXCAVATION M3 34.6000 103,454.00 2,986.000 103,315.60 16 IMPORTED BORROW M3 55.5000 64,935.00 404.360 22,441.98 1,168.000 64,824.00 17 FIBER (EROSION CONTROL) KG 2.3000 6,210.00 2,830.000 6,509.00 S) 18 COMPOST (EROSION CONTROL) M3 257.0000 5,654.00 22.640 5,818.48 S) 19 PURE LIVE SEED (EROSION CONTROL) KG 111.0000 18,870.00 169.450 18,808.95 S) 20 STABILIZING EMULSION (EROSION CONTROL) KG 6.5000 4,420.00 707.500 4,598.75 S) 21 CLASS 2 AGGREGATE BASE M3 55.2500 96,135.00 1,740.000 96,135.00 22 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 2,171.0000 651.30 0.180 390.78 0.180 390.78 PROGRAM CAS145 PAGE 2 DATE 07/10/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0G8924 TIME 01:59 PM ESTIMATE NO. 05 BID OPENING 01/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/12/06 R.E. NAME: HOPKINS, RAMON L. DATE OF THIS ESTIMATE 07/10/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ASPHALT CONCRETE (TYPE A) TONN 85.7000 150,832.00 1,914.390 164,063.22 24 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 36.0000 10,800.00 336.200 12,103.20 AREA) 25 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 28.8000 6,624.00 204.500 5,889.60 26 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 28.0000 280.00 7.700 215.60 27 SHOULDER RUMBLE STRIP STA 104.6000 8,368.00 74.970 7,841.86 (AC, GROUND-IN INDENTATIONS) 28 MINOR CONCRETE (MINOR STRUCTURE) M3 1,710.0000 10,602.00 5.280 9,028.80 F) 29 SURVEY MONUMENT (TYPE A) EA 612.0000 1,836.00 4.000 2,448.00 30 DELINEATOR (CLASS 1) EA 40.7500 1,304.00 31.000 1,263.25 31 THERMOPLASTIC TRAFFIC STRIPE M 1.1500 8,740.00 7,615.000 8,757.25 S) (SPRAYABLE) 32 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.8300 2,332.00 541.000 3,154.03 S) PROGRAM CAS145 PAGE 3 DATE 07/10/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0G8924 TIME 01:59 PM ESTIMATE NO. 05 BID OPENING 01/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/12/06 R.E. NAME: HOPKINS, RAMON L. DATE OF THIS ESTIMATE 07/10/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 22,832.76 623,111.59 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 7,598.64 14,809.31 SUBTOTAL AMOUNT EARNED 30,431.40 637,920.90 ORIGINAL CONTRACT AMOUNT 611,347.30 TOTAL WORK COMPLETED 30,431.40 637,920.90 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -10,000.00 TOTAL 30,431.40 627,920.90 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/17/06 45 03/06/06 04/24/06 06/12/06 34 36 0 0 100% 100% HOPKINS, RAMON L. RESIDENT ENGINEER PROGRAM CAS145 DATE 07/10/06