PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/21/05 EST. NO.01 TIME 01:56 PM R.E. NAME: INFANTE, ART 05-0H0904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/21/05 EST. NO.01 TIME 01:56 PM R.E. NAME: INFANTE, ART 05-0H0904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE RETAIN 25% PER SP -21,550.83 01 -21,550.83 -21,550.83 OVERBID ITEMS OVERBID ITEM NO. 027 -6,000.00 01 -6,000.00 -6,000.00 TOTAL DEDUCTIONS -27,550.83 -27,550.83 PROGRAM CAS145 PAGE 1 DATE 06/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0H0904 TIME 01:56 PM ESTIMATE NO. 01 BID OPENING 03/29/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/05 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 06/21/05 LOCATION PROGRESS ESTIMATE 05-SB-101-47.9/R50.8 ----------------- A J DIANI CONSTRUCTION CO INC IN SANTA BARBARA COUNTY NEAR P O BOX 636 LAS CRUCES FROM 1.0 KM NORTH END OF SANTA MARIA CA 93456 GAVIOTA TUNNEL TO 3.1 KM NORTH OF ROUTE 1 AND 101 SEPARATION FED. AID NO. ACST-Q101(92)E ,PHG-Q101(92)E CONSTRUCT CONCRETE MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 1,345.0000 1,345.00 0.750 1,008.75 0.750 1,008.75 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 11,250.0000 11,250.00 0.110 1,237.50 0.110 1,237.50 03 TEMPORARY FIBER ROLL M 22.5000 7,875.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 5,500.0000 5,500.00 0.000 0.00 05 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 0.500 1,500.00 0.500 1,500.00 S) 06 TRAFFIC CONTROL SYSTEM LS 102,000.0000 102,000.00 0.110 11,220.00 0.110 11,220.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,700.0000 1,700.00 0.110 187.00 0.110 187.00 S) 08 TEMPORARY RAILING (TYPE K) M 92.0000 54,280.00 437.040 40,207.68 437.040 40,207.68 S) 09 TEMPORARY CRASH CUSHION (TYPE ADIEM) EA 15,600.0000 15,600.00 0.500 7,800.00 0.500 7,800.00 S) 10 REMOVE SINGLE THRIE BEAM BARRIER M 41.0000 3,567.00 87.000 3,567.00 87.000 3,567.00 S) 11 REMOVE DOUBLE THRIE BEAM BARRIER M 23.0000 6,670.00 283.000 6,509.00 283.000 6,509.00 S) 12 REMOVE METAL BEAM GUARD RAILING M 25.0000 3,250.00 0.000 0.00 S) 13 REMOVE FLARED END SECTION EA 100.0000 100.00 1.000 100.00 1.000 100.00 14 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 10.0000 2,500.00 0.000 0.00 S) STRIPE 15 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 7.0000 5,250.00 0.000 0.00 S) 16 REMOVE PAVEMENT MARKER EA 1.0000 80.00 0.000 0.00 S) 17 REMOVE ROADSIDE SIGN EA 130.0000 650.00 0.000 0.00 18 REMOVE PIPE M 112.0000 3,584.00 12.200 1,366.40 12.200 1,366.40 19 REMOVE INLET EA 700.0000 5,600.00 0.000 0.00 20 REMOVE SLOTTED CORRUGATED STEEL PIPE M 73.5000 4,851.00 0.000 0.00 21 REMOVE DELINEATOR EA 13.0000 624.00 0.000 0.00 22 SALVAGE GRATE EA 20.0000 120.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0H0904 TIME 01:56 PM ESTIMATE NO. 01 BID OPENING 03/29/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/05 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 06/21/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ADJUST INLET EA 1,150.0000 2,300.00 0.000 0.00 24 REMOVE CONCRETE M3 135.0000 17,550.00 0.000 0.00 25 CAP INLET EA 1,600.0000 1,600.00 0.000 0.00 26 REMOVE CRASH CUSHION EA 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000.00 S) 27 CLEARING AND GRUBBING LS 19,000.0000 19,000.00 0.500 9,500.00 0.500 9,500.00 28 ROADWAY EXCAVATION M3 170.0000 173,400.00 0.000 0.00 29 LEAD COMPLIANCE PLAN LS 1,900.0000 1,900.00 0.000 0.00 30 IMPORTED BORROW M3 30.0000 37,200.00 0.000 0.00 31 HIGHWAY PLANTING LS 10,800.0000 10,800.00 0.000 0.00 S) 32 FIBER (EROSION CONTROL) KG 1.4000 1,680.00 0.000 0.00 S) 33 COMPOST (EROSION CONTROL) M3 750.0000 1,800.00 0.000 0.00 S) 34 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 400.0000 800.00 0.000 0.00 S) 35 PURE LIVE SEED (EROSION CONTROL) KG 47.0000 987.00 0.000 0.00 S) 36 STABILIZING EMULSION (EROSION CONTROL) KG 3.0000 225.00 0.000 0.00 S) 37 PLANT ESTABLISHMENT WORK LS 9,000.0000 9,000.00 0.000 0.00 S) 38 IRRIGATION SYSTEM LS 12,000.0000 12,000.00 0.000 0.00 S) 39 ASPHALT CONCRETE (TYPE A) TONN 71.7000 276,045.00 0.000 0.00 40 ASPHALT CONCRETE (OPEN GRADED) TONN 343.0000 12,691.00 0.000 0.00 41 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 6.0000 36,840.00 0.000 0.00 AREA) 42 MINOR CONCRETE (MINOR STRUCTURE) M3 1,800.0000 133,200.00 0.000 0.00 F) 43 METAL (BARRIER MOUNTED SIGN) KG 110.0000 6,050.00 0.000 0.00 F) 44 300 MM CORRUGATED STEEL PIPE M 600.0000 1,800.00 0.000 0.00 (2.01 MM THICK) 45 450 MM CORRUGATED STEEL PIPE M 230.0000 25,300.00 0.000 0.00 (2.01 MM THICK) 46 600 MM CORRUGATED STEEL PIPE M 180.0000 367,200.00 0.000 0.00 (2.01 MM THICK) 47 300 MM SLOTTED CORRUGATED STEEL PIPE M 150.0000 8,550.00 0.000 0.00 (1.63 MM THICK) 48 HDPE PIPE WATER LINES M 27.0000 61,020.00 0.000 0.00 49 900 MM CORRUGATED STEEL PIPE INLET M 675.0000 1,350.00 0.000 0.00 (2.01 MM THICK) PROGRAM CAS145 PAGE 3 DATE 06/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0H0904 TIME 01:56 PM ESTIMATE NO. 01 BID OPENING 03/29/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/05 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 06/21/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 600 MM STEEL FLARED END SECTION EA 300.0000 300.00 0.000 0.00 51 ROCK SLOPE PROTECTION M3 250.0000 2,000.00 0.000 0.00 (BACKING NO. 1, METHOD B) 52 ROCK SLOPE PROTECTION FABRIC M2 6.0000 138.00 0.000 0.00 53 MINOR CONCRETE (MISCELLANEOUS M3 500.0000 185,000.00 0.000 0.00 CONSTRUCTION) 54 MISCELLANEOUS IRON AND STEEL KG 2.5000 14,577.50 0.000 0.00 SF) 55 SURVEY MONUMENT (TYPE A) EA 165.0000 165.00 0.000 0.00 56 DOUBLE THRIE BEAM BARRIER (STEEL POST) M 217.0000 16,492.00 0.000 0.00 S) 57 QUADGUARD SYSTEM EA 28,400.0000 85,200.00 0.000 0.00 S) 58 TRANSITION RAILING (TYPE DTB) EA 2,200.0000 2,200.00 0.000 0.00 S) 59 CONCRETE BARRIER (TYPE 60) M 115.0000 225,400.00 0.000 0.00 60 CONCRETE BARRIER (TYPE 60C) M 150.0000 358,500.00 0.000 0.00 61 CONCRETE BARRIER (TYPE 60E) M 610.0000 67,100.00 0.000 0.00 62 THERMOPLASTIC TRAFFIC STRIPE M 1.0000 950.00 0.000 0.00 S) (SPRAYABLE) 63 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 360.00 0.000 0.00 S) 64 MODIFY LIGHTING LS 17,340.0000 17,340.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 06/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0H0904 TIME 01:56 PM ESTIMATE NO. 01 BID OPENING 03/29/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/05 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 06/21/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 86,203.33 86,203.33 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 86,203.33 86,203.33 65 MOBILIZATION LS 176,000.0000 176,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 2,613,406.50 TOTAL WORK COMPLETED 86,203.33 86,203.33 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -27,550.83 -27,550.83 TOTAL 58,652.50 58,652.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 027 CLEARING AND GRUBBING 7,000.00 19,000.00 12,000.00 029 LEAD COMPLIANCE PLAN 1,000.00 1,900.00 900.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/26/05 350 00/00/00 05/11/05 11/01/05 10 0 0 20 3% 10% PROGRESS IS SATISFACTORY INFANTE, ART RESIDENT ENGINEER PROGRAM CAS145 PAGE 5 DATE 06/21/05