PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/07 EST. NO.02 TIME 08:03 AM R.E. NAME: MEYER, ANN 05-0J3004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 2,562.00 E.W. @ L.S.(+) 072307 N 0001 0 2,562.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 2,562.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/07 EST. NO.02 TIME 08:03 AM R.E. NAME: MEYER, ANN 05-0J3004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0J3004 TIME 08:03 AM ESTIMATE NO. 02 BID OPENING 03/21/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: MEYER, ANN DATE OF THIS ESTIMATE 07/25/07 LOCATION PROGRESS ESTIMATE 05-SBT-156-9.0/ .0 ----------------- WILLIAM P. YOUNG IN SAN BENITO COUNTY NEAR HOLLISTER 1777 NEPTUNE DRIVE AT SAN BENITO RIVER BRIDGE SAN LEANDRO, CA 94577 FED. AID NO. N O N E SEISMIC RETROFIT AND DECK SEAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 15.0000 7,200.00 69.000 1,035.00 119.000 1,785.00 02 CONSTRUCTION SITE MANAGEMENT LS 4,450.0000 4,450.00 0.250 1,112.50 0.750 3,337.50 03 PREPARE STORM WATER POLLUTION LS 2,000.0000 2,000.00 1.000 2,000.00 PREVENTION PLAN 04 TEMPORARY CONCRETE WASHOUT FACILITY LS 1,500.0000 1,500.00 1.000 1,500.00 S) 05 TEMPORARY CONSTRUCTION ENTRANCE EA 10,430.0000 10,430.00 0.000 0.00 S) 06 STREET SWEEPING LS 3,300.0000 3,300.00 0.250 825.00 0.500 1,650.00 07 TEMPORARY STREAM CROSSING SYSTEM LS 1.0000 1.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 10,205.0000 10,205.00 1.000 10,205.00 S) 09 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 1.000 10,000.00 1.000 10,000.00 S) 10 TYPE III BARRICADE EA 130.0000 780.00 10.000 1,300.00 10.000 1,300.00 S) 11 PORTABLE CHANGEABLE MESSAGE SIGN LS 12,000.0000 12,000.00 1.000 12,000.00 1.000 12,000.00 S) 12 CLEAN BRIDGE DECK M2 6.0000 11,160.00 1,850.000 11,100.00 1,850.000 11,100.00 13 BRIDGE REMOVAL (PORTION) LS 1.0000 1.00 1.000 1.00 14 PRESTRESSUBG HIGH STRENGTH BAR LS 37,000.0000 37,000.00 0.500 18,500.00 0.500 18,500.00 S) 15 STRUCTURAL CONCRETE, BRIDGE M3 1,610.0000 67,620.00 42.000 67,620.00 42.000 67,620.00 F) 16 MINOR CONCRETE (ABUTMENT PEDESTAL) M3 4,600.0000 27,600.00 6.000 27,600.00 6.000 27,600.00 F) 17 DIAPHRAGM BOLSTER EA 4,400.0000 52,800.00 0.000 0.00 18 CORE CONCRETE (51 MM - 100 MM) M 475.0000 14,250.00 30.000 14,250.00 19 CORE CONCRETE (101 MM - 150 MM) M 2,500.0000 5,000.00 2.000 5,000.00 S) 20 CORE CONCRETE (251 MM - 300 MM) M 1,100.0000 5,500.00 0.000 0.00 S) 21 BAT HABITAT EA 600.0000 7,200.00 6.000 3,600.00 12.000 7,200.00 22 JOINT SEAL (MR 30 MM) M 325.0000 5,525.00 20.000 6,500.00 20.000 6,500.00 S) PROGRAM CAS145 PAGE 2 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0J3004 TIME 08:03 AM ESTIMATE NO. 02 BID OPENING 03/21/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: MEYER, ANN DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 BAR REINFORCING STEEL (BRIDGE) KG 5.0000 42,750.00 7,974.000 39,870.00 8,550.000 42,750.00 SF) 24 TREAT BRIDGE DECK M2 8.0000 14,880.00 1,860.000 14,880.00 1,860.000 14,880.00 F) 25 FURNISH BRIDGE DECK TREATMENT MATERIAL L 18.0000 13,608.00 693.000 12,474.00 693.000 12,474.00 (LOW ODOR) 26 ABUTMENT LUMBER BLOCKING M3 2,392.0000 11,960.00 5.000 11,960.00 5.000 11,960.00 F) 27 MISCELLANEOUS METAL KG 16.5000 27,555.00 418.000 6,897.00 418.000 6,897.00 SF)(RESTRAINER - PIPE TYPE) 28 PAINT TRAFFIC STRIPE (2-COAT) M 15.0000 6,600.00 0.000 0.00 S) 29 PAVEMENT MARKER (NON-REFLECTIVE) EA 14.0000 4,200.00 0.000 0.00 S) 30 PAVEMENT MARKER (RETROREFLECTIVE) EA 22.0000 1,540.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0J3004 TIME 08:03 AM ESTIMATE NO. 02 BID OPENING 03/21/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: MEYER, ANN DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 247,273.50 290,509.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,562.00 2,562.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 249,835.50 293,071.50 31 MOBILIZATION LS 46,000.0000 46,000.00 0.500 23,000.00 1.000 46,000.00 ORIGINAL CONTRACT AMOUNT 464,615.00 TOTAL WORK COMPLETED 272,835.50 339,071.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 272,835.50 339,071.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/03/07 160 06/04/07 05/18/07 01/24/08 34 0 0 0 71% 21% PROGRESS IS SATISFACTORY MEYER, ANN RESIDENT ENGINEER PROGRAM CAS145 PAGE 6 DATE 07/25/07