PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/20/06 EST. NO.12 TIME 07:36 AM R.E. NAME: INFANTE, ART 05-0K1004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0009 1,509.27 E.W. @ F.A.(+) 120605 N 4802-2 0015 401.77 120905 N 480251 006 0001 429.05 E.W. @ F.A.(+) 051606 N 5501-1 007 0001 1,745.68 E.W. @ F.A.(+) 041206 N 4501-1 0005 517.47 041206 N 4501-2 4,603.24 TOTAL THIS ESTIMATE 119,798.56 TOTAL PREVIOUS ESTIMATE 124,401.80 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/20/06 EST. NO.12 TIME 07:36 AM R.E. NAME: INFANTE, ART 05-0K1004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PYRLS -10,000.00 05 MISSING PYRLS RECD 10,000.00 12 10,000.00 0.00 OVERBID ITEMS OVERBID ITEM NO. 001 -1,875.00 02 OVERBID ITEM NO. 001 1,875.00 09 0.00 0.00 OTHER OUTSTANDING DOCUMENTS MISS PR47, HC43 -10,000.00 09 MISS PR47, HC43 RECD 10,000.00 10 0.00 0.00 TOTAL DEDUCTIONS 10,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 10/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0K1004 TIME 07:36 AM ESTIMATE NO. 12 BID OPENING 07/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/26/06 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 10/20/06 LOCATION SEMI-FINAL ESTIMATE 05-SB-101-54.0/56.0 ------------------- JOHN MADONNA CONSTRUCTION IN SANTA BARBARA COUNTY NEAR COMPANY INC BUELLTON FROM 1.1 KM SOUTH OF P O BOX 5310 NOJOQUI CREEK BRIDGE TO 0.8 KM SAN LUIS OBISPO CA 93403 SOUTH OF SANTA ROSA ROAD OVERCROSSING FED. AID NO. ACST-Q101(96)E ,PHG-Q101(96)E MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 5,000.0000 5,000.00 1.000 5,000.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 19,000.0000 19,000.00 1.000 19,000.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 2,000.0000 4,000.00 2.000 4,000.00 04 CONSTRUCTION AREA SIGNS LS 3,200.0000 3,200.00 1.000 3,200.00 S) 05 TRAFFIC CONTROL SYSTEM LS 125,000.0000 125,000.00 1.000 125,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 31,000.0000 31,000.00 1.000 31,000.00 S) 07 ABANDON CULVERT EA 1,000.0000 2,000.00 2.000 2,000.00 08 REMOVE MARKER EA 50.0000 100.00 2.000 100.00 09 REMOVE METAL BEAM GUARD RAILING M 35.0000 12,600.00 342.240 11,978.40 10 REMOVE ROADSIDE SIGN (WOOD POST) EA 140.0000 700.00 5.000 700.00 11 REMOVE CULVERT M 335.0000 1,340.00 3.700 1,239.50 12 REMOVE INLET EA 600.0000 7,800.00 14.000 8,400.00 13 REMOVE DELINEATOR EA 15.0000 75.00 5.000 75.00 14 RESET MARKERS AND DELINEATORS EA 30.0000 2,280.00 60.000 1,800.00 15 RESET ROADSIDE SIGN (WOOD POST) EA 200.0000 1,000.00 3.000 600.00 16 ADJUST INLET EA 1,600.0000 1,600.00 1.000 1,600.00 17 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 5.3000 19,822.00 3,699.000 19,604.70 S) 18 SALVAGE CRASH CUSHION EA 550.0000 4,950.00 9.000 4,950.00 19 CLEARING AND GRUBBING LS 20,000.0000 20,000.00 1.000 20,000.00 20 ROADWAY EXCAVATION M3 127.0000 144,780.00 1,078.280 136,941.56 21 IMPORTED BORROW M3 145.0000 30,450.00 384.840 55,801.80 22 FIBER (EROSION CONTROL) KG 0.8900 3,818.10 4,290.000 3,818.10 S) PROGRAM CAS145 PAGE 2 DATE 10/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0K1004 TIME 07:36 AM ESTIMATE NO. 12 BID OPENING 07/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/26/06 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 10/20/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 390.0000 390.00 1.000 390.00 S) 24 PURE LIVE SEED (EROSION CONTROL) KG 39.0000 3,510.00 90.000 3,510.00 S) 25 STABILIZING EMULSION (EROSION CONTROL) KG 3.3000 1,089.00 330.000 1,089.00 S) 26 CLASS 2 AGGREGATE BASE M3 94.0000 59,220.00 499.730 46,974.62 27 LEAN CONCRETE BASE M3 305.0000 100,650.00 318.820 97,240.10 28 ASPHALT CONCRETE (TYPE A) TONN 84.0000 116,760.00 1,044.400 87,729.60 29 SHOULDER RUMBLE STRIP STA 415.0000 9,545.00 20.310 8,428.65 (AC, GROUND-IN INDENTATIONS) 30 CLASS 4 CONCRETE (BACKFILL) M3 245.0000 31,850.00 87.610 21,464.45 31 MINOR CONCRETE (MINOR STRUCTURE) M3 2,800.0000 51,800.00 17.800 49,840.00 F) 32 FURNISH FORMED PANEL SIGN (ROADSIDE) M2 170.0000 170.00 1.000 170.00 33 METAL (BARRIER MOUNTED SIGN) KG 35.0000 7,000.00 200.000 7,000.00 34 ROADSIDE SIGN - ONE POST EA 200.0000 400.00 2.000 400.00 35 450 MM ALTERNATIVE PIPE CULVERT M 220.0000 16,720.00 74.600 16,412.00 36 300 MM CORRUGATED STEEL PIPE M 185.0000 12,025.00 68.700 12,709.50 (2.01 MM THICK) 37 450 MM CORRUGATED STEEL PIPE M 990.0000 3,960.00 7.600 7,524.00 (2.01 MM THICK) 38 450 MM SLOTTED CORRUGATED STEEL PIPE M 234.0000 35,100.00 149.600 35,006.40 (2.01 MM THICK) 39 MINOR CONCRETE (MISCELLANEOUS M3 1,410.0000 19,740.00 13.220 18,640.20 CONSTRUCTION) 40 MISCELLANEOUS IRON AND STEEL KG 5.5000 9,768.00 1,776.000 9,768.00 SF) 41 SURVEY MONUMENT (TYPE A) EA 500.0000 6,500.00 10.000 5,000.00 42 MARKER (CULVERT) EA 50.0000 650.00 16.000 800.00 43 GUARD RAILING DELINEATOR EA 20.0000 60.00 3.000 60.00 44 OBJECT MARKER (OM - 3L) EA 85.0000 85.00 1.000 85.00 45 DOUBLE THRIE BEAM BARRIER (STEEL POST) M 225.0000 10,125.00 45.000 10,125.00 S) 46 TRANSITION RAILING (TYPE DTB) EA 3,300.0000 6,600.00 2.000 6,600.00 S) 47 CRASH CUSHION (QUADGUARD SYSTEM) EA 19,900.0000 99,500.00 0.000 0.00 S) 48 CONCRETE BARRIER (TYPE 60) M 156.0000 57,720.00 366.500 57,174.00 49 CONCRETE BARRIER (TYPE 60S) M 150.0000 196,500.00 1,324.700 198,705.00 PROGRAM CAS145 PAGE 3 DATE 10/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0K1004 TIME 07:36 AM ESTIMATE NO. 12 BID OPENING 07/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/26/06 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 10/20/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 CONCRETE BARRIER (TYPE 60SC) M 206.0000 199,820.00 918.300 189,169.80 51 THERMOPLASTIC PAVEMENT MARKING M2 240.0000 720.00 3.000 720.00 S) 52 THERMOPLASTIC TRAFFIC STRIPE M 1.3000 3,068.00 2,825.000 3,672.50 S) (SPRAYABLE) 53 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.6000 840.00 173.000 968.80 S) PROGRAM CAS145 PAGE 4 DATE 10/20/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0K1004 TIME 07:36 AM ESTIMATE NO. 12 BID OPENING 07/19/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/26/06 R.E. NAME: INFANTE, ART DATE OF THIS ESTIMATE 10/20/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 1,354,185.68 ADJUSTMENT OF COMPENSATION 0.00 -9,091.78 EXTRA WORK 4,603.24 133,493.58 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,603.24 1,478,587.48 54 MOBILIZATION LS 22,000.0000 22,000.00 1.000 22,000.00 ORIGINAL CONTRACT AMOUNT 1,524,400.10 TOTAL WORK COMPLETED 4,603.24 1,500,587.48 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 0.00 TOTAL 14,603.24 1,500,587.48 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 001 PREPARE STORM WATER POLLUTION 2,500.00 5,000.00 2,500.00 PREVENTION PLAN DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/15/05 160 09/06/05 08/31/05 05/26/06 135 48 0 6 100% 100% INFANTE, ART RESIDENT ENGINEER PROGRAM CAS145 DATE 10/20/06