PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/30/07 EST. NO.03 TIME 11:06 AM R.E. NAME: KESHAVARZI, FARSHAD 05-0M2104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 836.73 E.W. @ F.A.(+) 073107 N 202109 0002 722.59 080107 N 202110 0003 722.71 080207 N 202111 0004 570.79 080607 N 202112 0005 324.66 080907 N 202113 0006 171.20 081007 N 202114 0007 913.07 071607 N 202100 0008 950.86 071707 N 202101 0009 285.34 071807 N 202102 0010 494.32 071907 N 202103 0011 342.40 072007 N 202104 0012 569.88 072307 N 202105 0013 684.01 072507 N 202106 0014 637.03 072607 N 202107 0015 779.66 073007 N 202108 0018 2,986.04 082807 N 503001 0019 3,208.02 082907 N 503002 004 0001 5,000.00 E.W. @ L.S.(+) 091207 N 1 0 005 0001 10,749.03 A.C. @ U.P.(+) 102407 N 1 0 30,948.34 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 30,948.34 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/30/07 EST. NO.03 TIME 11:06 AM R.E. NAME: KESHAVARZI, FARSHAD 05-0M2104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PYRLS -1,000.00 03 -1,000.00 -1,000.00 OTHER OUTSTANDING DOCUMENTS MISSING CEM2402 -10,000.00 03 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -11,000.00 -11,000.00 PROGRAM CAS145 PAGE 1 DATE 10/30/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0M2104 TIME 11:06 AM ESTIMATE NO. 03 BID OPENING 04/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/19/07 R.E. NAME: KESHAVARZI, FARSHAD DATE OF THIS ESTIMATE 10/30/07 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 05-SCR-9-14.5/20.5 ---------------------------------- GRANITE CONSTRUCTION IN SANTA CRUZ COUNTY NEAR BOULDER P.O. BOX 720 CREEK FROM 1.4 KM NORTH OF WATSONVILLE, CA 95077 SAN LORENZO RIVER BRIDGE TO 0.5 KM SOUTH OF NORTH JUNCTION ROUTE 236 FED. AID NO. N O N E SEAL COAT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 0.330 330.00 1.000 1,000.00 02 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 1.000 500.00 PROGRAM 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) EA 500.0000 500.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 4,000.0000 4,000.00 0.400 1,600.00 1.000 4,000.00 S) 05 TRAFFIC CONTROL SYSTEM LS 81,474.0000 81,474.00 0.330 26,886.42 1.000 81,474.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,500.0000 7,500.00 0.330 2,475.00 1.000 7,500.00 S) 07 REMOVE YELLOW THERMOPLASTIC PAVEMENT M2 300.0000 7,500.00 25.000 7,500.00 S) MARKING 08 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 10.0000 2,400.00 240.000 2,400.00 09 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 30.0000 1,860.00 62.000 1,860.00 10 REMOVE ASPHALT CONCRETE SURFACING M2 15.0000 2,700.00 169.700 2,545.50 11 ADJUST FRAME AND COVER TO GRADE EA 1,500.0000 3,000.00 2.000 3,000.00 12 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 15.0000 11,700.00 347.300 5,209.50 S) 13 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 14 IMPORTED MATERIAL (SHOULDER BACKING) TONN 100.0000 53,000.00 0.000 0.00 15 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 700.0000 1,400.00 0.000 0.00 16 ASPHALT CONCRETE (OPEN GRADED) TONN 129.0000 679,830.00 6,508.930 839,651.97 17 ASPHALTIC EMULSION (PAINT BINDER) TONN 700.0000 28,700.00 30.240 21,168.00 18 THERMOPLASTIC PAVEMENT MARKING M2 42.0000 3,654.00 0.000 0.00 S) 19 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.4500 57,130.00 0.000 0.00 S) 20 200 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 480.00 0.000 0.00 S) 21 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 156.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 22 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 9,450.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 10/30/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0M2104 TIME 11:06 AM ESTIMATE NO. 03 BID OPENING 04/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/19/07 R.E. NAME: KESHAVARZI, FARSHAD DATE OF THIS ESTIMATE 10/30/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REPLACE PULL BOX EA 2,379.5000 28,554.00 12.000 28,554.00 PROGRAM CAS145 PAGE 3 DATE 10/30/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0M2104 TIME 11:06 AM ESTIMATE NO. 03 BID OPENING 04/11/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/19/07 R.E. NAME: KESHAVARZI, FARSHAD DATE OF THIS ESTIMATE 10/30/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 31,291.42 1,008,862.97 ADJUSTMENT OF COMPENSATION 10,749.03 10,749.03 EXTRA WORK 20,199.31 20,199.31 SUBTOTAL AMOUNT EARNED 62,239.76 1,039,811.31 ORIGINAL CONTRACT AMOUNT 988,988.00 TOTAL WORK COMPLETED 62,239.76 1,039,811.31 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -11,000.00 -11,000.00 TOTAL 51,239.76 1,028,811.31 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/11/07 30 07/09/07 07/09/07 10/19/07 59 0 0 29 100% 100% KESHAVARZI, FARSHAD RESIDENT ENGINEER PROGRAM CAS145 DATE 10/30/07