PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/19/08 EST. NO.04 TIME 02:40 PM R.E. NAME: TYLER LAVERING 05-0N8304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0011 195.43 E.W. @ F.A.(+) 092908 N 506B10 195.43 TOTAL THIS ESTIMATE 16,622.51 TOTAL PREVIOUS ESTIMATE 16,817.94 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/19/08 EST. NO.04 TIME 02:40 PM R.E. NAME: TYLER LAVERING 05-0N8304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0N8304 TIME 02:40 PM ESTIMATE NO. 04 BID OPENING 07/02/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/08 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 12/19/08 LOCATION PROGRESS ESTIMATE 05-MON-101-80.7/85.6 ----------------- GRANITE CONSTRUCTION CO IN MONTEREY COUNTY IN AND NEAR PO BOX 720 SALINAS FROM 0.3 MILE SOUTH OF WATSONVILLE, CA 95077 SPENCE ROAD TO AIRPORT BOULEVARD OVERCROSSING FED. AID NO. ACST-Q101(145)E ,PH-Q101(145)E CONSTRUCT CONCRETE MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.770 1,540.00 1.000 2,000.00 02 PREPARE STORM WATER POLLUTION LS 2,000.0000 2,000.00 0.000 0.00 PREVENTION PLAN 03 TEMPORARY CONSTRUCTION ENTRANCE EA 1,000.0000 5,000.00 0.000 0.00 04 TEMPORARY CHECK DAM LF 20.0000 4,000.00 0.000 0.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 11,000.00 11.000 5,500.00 11.000 5,500.00 06 STREET SWEEPING LS 10,000.0000 10,000.00 0.150 1,500.00 0.380 3,800.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,200.0000 1,200.00 0.230 276.00 08 CONSTRUCTION AREA SIGNS LS 4,000.0000 4,000.00 0.150 600.00 0.750 3,000.00 S) 09 TRAFFIC CONTROL SYSTEM LS 104,824.0000 104,824.00 0.350 36,688.40 0.580 60,797.92 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 0.350 875.00 0.580 1,450.00 S) 11 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.9000 14,220.00 0.000 0.00 S) STRIPE 12 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.6000 2,064.00 0.000 0.00 S) 13 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.6000 3,984.00 0.000 0.00 S) 14 REMOVE PAVEMENT MARKER EA 1.0000 710.00 0.000 0.00 15 RESET ROADSIDE SIGN EA 215.0000 215.00 0.000 0.00 16 RELOCATE ROADSIDE SIGN EA 215.0000 1,720.00 1.000 215.00 1.000 215.00 17 ADJUST INLET EA 1,600.0000 12,800.00 4.000 6,400.00 18 REMOVE CONCRETE BARRIER LF 31.0000 16,430.00 530.000 16,430.00 19 CAP INLET EA 1,700.0000 1,700.00 0.000 0.00 20 REMOVE CRASH CUSHION (QUADGUARD) EA 2,300.0000 4,600.00 2.000 4,600.00 21 REMOVE CRASH CUSHION (SAND FILLED) EA 3,000.0000 3,000.00 0.000 0.00 22 CLEARING AND GRUBBING LS 15,000.0000 15,000.00 0.750 11,250.00 PROGRAM CAS145 PAGE 2 DATE 12/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0N8304 TIME 02:40 PM ESTIMATE NO. 04 BID OPENING 07/02/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/08 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 12/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROADWAY EXCAVATION CY 43.0000 348,300.00 2,920.500 125,581.50 24 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000.00 25 EROSION CONTROL (DRILL SEED) ACRE 4,960.0000 74,400.00 0.000 0.00 S) 26 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 950.0000 1,900.00 0.000 0.00 S) 27 CLASS 2 AGGREGATE BASE CY 60.0000 270,000.00 760.440 45,626.40 2,675.640 160,538.40 28 LEAN CONCRETE BASE CY 246.0000 110,700.00 0.000 0.00 29 HOT MIX ASPHALT (TYPE A) TON 112.0000 1,052,800.00 1,208.150 135,312.80 1,640.150 183,696.80 30 SHOULDER RUMBLE STRIP STA 35.0000 6,300.00 0.000 0.00 (HMA,ROLLED-IN INDENTATIONS) 31 SHOULDER RUMBLE STRIP STA 35.0000 8,050.00 0.000 0.00 (AC, GROUND-IN INDENTATIONS) 32 TACK COAT TON 100.0000 3,400.00 0.920 92.00 0.920 92.00 33 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 360.0000 1,800.00 0.000 0.00 (GUARD RAILING) 34 MINOR CONCRETE (MINOR STRUCTURE) CY 1,300.0000 28,600.00 15.000 19,500.00 F) 35 18" ALTERNATIVE PIPE CULVERT LF 53.0000 26,500.00 500.000 26,500.00 36 24" ALTERNATIVE PIPE CULVERT LF 56.0000 57,120.00 1,020.000 57,120.00 37 MISCELLANEOUS IRON AND STEEL LB 2.5000 11,410.00 0.000 0.00 SF) 38 SURVEY MONUMENT (TYPE A) EA 1,000.0000 18,000.00 0.000 0.00 39 DELINEATOR (CLASS 1) EA 35.0000 8,050.00 0.000 0.00 S) 40 OBJECT MARKER (TYPE L) EA 40.0000 1,000.00 0.000 0.00 S) 41 METAL BEAM GUARD RAILING (STEEL POST) LF 40.0000 10,000.00 0.000 0.00 S) 42 VEGETATION CONTROL (MINOR CONCRETE) SQYD 73.0000 43,070.00 0.000 0.00 43 CONCRETE BARRIER (TYPE K) LF 20.0000 32,000.00 1,600.000 32,000.00 44 DOUBLE THRIE BEAM BARRIER (STEEL POST) LF 55.5000 73,815.00 0.000 0.00 S) 45 TRANSITION RAILING (TYPE WB) EA 3,800.0000 3,800.00 0.000 0.00 S) 46 END ANCHOR ASSEMBLY (TYPE SFT) EA 900.0000 900.00 0.000 0.00 S) 47 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,300.0000 4,600.00 0.000 0.00 S) 48 CRASH CUSHION, SAND FILLED EA 6,000.0000 6,000.00 0.000 0.00 S) 49 ALTERNATIVE CRASH CUSHION SYSTEM EA 18,750.0000 225,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 12/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0N8304 TIME 02:40 PM ESTIMATE NO. 04 BID OPENING 07/02/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/08 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 12/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 CONCRETE BARRIER (TYPE 60) LF 42.2500 625,300.00 0.000 0.00 51 CONCRETE BARRIER (TYPE 60C) LF 59.0000 237,180.00 0.000 0.00 52 THERMOPLASTIC PAVEMENT MARKING SQFT 2.2000 7,700.00 0.000 0.00 S) 53 THERMOPLASTIC TRAFFIC STRIPE LF 0.2300 6,026.00 0.000 0.00 S) (SPRAYABLE) 54 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 3,010.00 0.000 0.00 S) 55 MODIFY LIGHTING AND SIGN ILLUMINATION LS 68,000.0000 68,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 12/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0N8304 TIME 02:40 PM ESTIMATE NO. 04 BID OPENING 07/02/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/08 R.E. NAME: TYLER LAVERING DATE OF THIS ESTIMATE 12/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 227,949.60 721,747.62 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 195.43 16,817.94 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 228,145.03 738,565.56 56 MOBILIZATION LS 100,000.0000 100,000.00 0.200 20,000.00 0.950 95,000.00 ORIGINAL CONTRACT AMOUNT 3,698,698.00 TOTAL WORK COMPLETED 248,145.03 833,565.56 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 248,145.03 833,565.56 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/25/08 60 08/25/08 11/17/08 03/16/09 17 44 12 0 21% 24% PROGRESS IS SATISFACTORY TYLER LAVERING RESIDENT ENGINEER PROGRAM CAS145 PAGE 19 DATE 12/19/08