PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/13/07 EST. NO.05 TIME 01:09 PM R.E. NAME: KESHARVARZI, FARSHAD 05-0P6104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 382.16 E.W. @ F.A.(+) 101006 N 501010 0002 421.30 101106 N 501011 0003 421.30 101206 N 501012 0004 607.76 102206 N 501013 0005 372.71 091906 N 501001 0006 372.71 092006 N 501002 0007 245.39 092106 N 501003 0008 117.86 092606 N 501004 0009 323.45 100106 N 501005 0010 421.30 100206 N 501006 0011 392.27 100306 N 501007 0012 372.40 100806 N 501008 0013 382.16 100906 N 501009 4,832.77 TOTAL THIS ESTIMATE -42,919.10 TOTAL PREVIOUS ESTIMATE -38,086.33 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/13/07 EST. NO.05 TIME 01:09 PM R.E. NAME: KESHARVARZI, FARSHAD 05-0P6104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PYRLS -10,000.00 04 MISSING PYRLS RECD 10,000.00 05 10,000.00 0.00 OTHER OUTSTANDING DOCUMENTS MISSING CEM2402 -10,000.00 04 MISSING CEM2402 RECD 10,000.00 05 10,000.00 0.00 TOTAL DEDUCTIONS 20,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 03/13/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0P6104 TIME 01:09 PM ESTIMATE NO. 05 BID OPENING 08/16/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/22/06 R.E. NAME: KESHARVARZI, FARSHAD DATE OF THIS ESTIMATE 03/13/07 LOCATION SEMI-FINAL ESTIMATE 05-SCR-1-R1.0/R8.4 ------------------- GRANITE CONSTRUCTION CO. IN SANTA CRUZ COUNTY IN AND NEAR PO BOX 720 WATSONVILLE FROM BEACH ROAD WATSONVILLE, CA UNDERCROSSING TO 0.1 KM NORTH OF FREEDOM BOULEVARD OVERCROSSING FED. AID NO. N O N E ASPHALT CONCRETE OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 1.000 2,000.00 PROGRAM 02 WATER POLLUTION CONTROL LS 5,000.0000 5,000.00 1.000 5,000.00 03 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 1.000 10,000.00 S) 04 TRAFFIC CONTROL SYSTEM LS 136,131.0000 136,131.00 1.000 136,131.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 12,000.0000 12,000.00 1.000 12,000.00 S) 06 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 5.0000 24,150.00 4,992.000 24,960.00 S) 07 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 29.0000 1,131.00 39.000 1,131.00 S) 08 ADJUST FRAME AND COVER TO GRADE EA 1,500.0000 1,500.00 1.000 1,500.00 09 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 6.5000 165,100.00 1,119.000 7,273.50 24,858.000 161,577.00 S) 10 IMPORTED MATERIAL (SHOULDER BACKING) TONN 63.0000 97,650.00 1,694.000 106,722.00 11 ASPHALT CONCRETE (TYPE A) TONN 94.0000 2,086,800.00 22,254.540 2,091,926.76 12 ASPHALTIC EMULSION (PAINT BINDER) TONN 800.0000 112,000.00 79.147 63,317.60 13 THERMOPLASTIC PAVEMENT MARKING M2 88.0000 3,432.00 57.200 5,033.60 S) 14 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.1700 25,155.00 19,842.070 23,215.22 S) 15 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 6,050.00 2,845.430 7,113.58 S) 16 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 550.00 215.000 537.50 S) (BROKEN 3.66 M - 0.92 M) 17 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.3500 14,000.00 27,251.800 9,538.13 S) (BROKEN 10.98 M - 3.66 M) 18 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 1,395.00 910.000 1,365.00 S) (BROKEN 5.18 M - 2.14 M) 19 PAINT TRAFFIC STRIPE (2-COAT) M 0.3500 8,050.00 23,535.700 8,237.50 S) 20 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 15,700.00 7,395.000 14,790.00 S) 21 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.1000 15,949.00 3,822.000 15,670.20 S) PROGRAM CAS145 PAGE 2 DATE 03/13/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0P6104 TIME 01:09 PM ESTIMATE NO. 05 BID OPENING 08/16/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/22/06 R.E. NAME: KESHARVARZI, FARSHAD DATE OF THIS ESTIMATE 03/13/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 7,273.50 2,701,766.09 ADJUSTMENT OF COMPENSATION 0.00 -42,919.10 EXTRA WORK 4,832.77 4,832.77 SUBTOTAL AMOUNT EARNED 12,106.27 2,663,679.76 ORIGINAL CONTRACT AMOUNT 2,743,743.00 TOTAL WORK COMPLETED 12,106.27 2,663,679.76 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 20,000.00 0.00 TOTAL 32,106.27 2,663,679.76 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/31/06 45 08/23/06 08/23/06 11/22/06 49 14 0 5 100% 100% KESHARVARZI, FARSHAD RESIDENT ENGINEER PROGRAM CAS145 DATE 03/13/07