PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/15/12 EST. NO.01 TIME 02:29 PM R.E. NAME: ANTHONY DE ANDA 05-0T9004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/15/12 EST. NO.01 TIME 02:29 PM R.E. NAME: ANTHONY DE ANDA 05-0T9004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/15/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0T9004 TIME 02:29 PM ESTIMATE NO. 01 BID OPENING 02/07/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: ANTHONY DE ANDA DATE OF THIS ESTIMATE 06/15/12 LOCATION PROGRESS ESTIMATE 05-SLO-41-0.0/ .0 ----------------- 05-SLO-46-0.0/ .0 TRUESDELL CORPORATION OF IN SAN LUIS OBISPO COUNTY AT 05-SLO-58-0.0/ .0 CALIFORNIA INC VARIOUS LOCATIONS 1310 W 23RD STREET TEMPE AZ 85282 FED. AID NO. N O N E REPLACE JOINT SEAL AND SEAL BRIDGE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.150 75.00 0.150 75.00 002 PREPARE WATER POLLUTION CONTROL LS 12,500.0000 12,500.00 0.750 9,375.00 0.750 9,375.00 PROGRAM 003 CONSTRUCTION AREA SIGNS LS 16,000.0000 16,000.00 0.730 11,680.00 0.730 11,680.00 004 TRAFFIC CONTROL SYSTEM LS 59,000.0000 59,000.00 0.170 10,030.00 0.170 10,030.00 005 PORTABLE CHANGEABLE MESSAGE SIGN LS 7,500.0000 7,500.00 0.170 1,275.00 0.170 1,275.00 006 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.3000 4,927.00 118.000 153.40 118.000 153.40 STRIPE (HAZARDOUS WASTE) 007 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 5,863.00 0.000 0.00 008 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 1,645.00 0.000 0.00 009 REMOVE CONTRAST TREATMENT SQFT 0.4000 8,040.00 0.000 0.00 010 REMOVE ASPHALT CONCRETE SURFACING SQFT 3.0000 13,140.00 4,380.000 13,140.00 4,380.000 13,140.00 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 21.5000 9,030.00 0.000 0.00 012 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.5000 2,190.00 4,380.000 2,190.00 4,380.000 2,190.00 013 CLEAN BRIDGE DECK SQFT 0.1500 22,011.00 0.000 0.00 014 BRIDGE REMOVAL (PORTION) LS 33,000.0000 33,000.00 0.000 0.00 015 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 0.750 3,750.00 0.750 3,750.00 016 HOT MIX ASPHALT (TYPE A) TON 420.0000 10,920.00 0.000 0.00 017 TACK COAT TON 1,050.0000 1,260.00 0.000 0.00 018 STRUCTURAL CONCRETE, BRIDGE CY 1,900.0000 17,100.00 0.000 0.00 (F) 019 CLEAN EXPANSION JOINT LF 12.0000 1,356.00 0.000 0.00 020 FURNISH POLYESTER CONCRETE OVERLAY CF 60.0000 19,800.00 330.000 19,800.00 330.000 19,800.00 021 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.0000 13,140.00 4,380.000 13,140.00 4,380.000 13,140.00 (F) 022 JOINT SEAL (MR 1/2") LF 20.0000 1,100.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 06/15/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0T9004 TIME 02:29 PM ESTIMATE NO. 01 BID OPENING 02/07/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: ANTHONY DE ANDA DATE OF THIS ESTIMATE 06/15/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 JOINT SEAL (MR 1") LF 20.0000 1,160.00 0.000 0.00 024 JOINT SEAL ASSEMBLY (MR 3 1/2") LF 400.0000 15,200.00 0.000 0.00 025 JOINT SEAL ASSEMBLY (MR 4") LF 375.0000 42,750.00 0.000 0.00 026 BAR REINFORCING STEEL (BRIDGE) LB 30.0000 1,500.00 0.000 0.00 027 TREAT BRIDGE DECK SQFT 0.1500 22,011.00 0.000 0.00 (F) 028 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 69.0000 112,539.00 0.000 0.00 029 THERMOPLASTIC PAVEMENT MARKING SQFT 6.2000 2,914.00 0.000 0.00 030 THERMOPLASTIC TRAFFIC STRIPE LF 0.8500 9,605.00 0.000 0.00 (SPRAYABLE) 031 PAVEMENT MARKER (NON-REFLECTIVE) EA 4.2500 1,402.50 0.000 0.00 032 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.5000 1,650.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 06/15/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-0T9004 TIME 02:29 PM ESTIMATE NO. 01 BID OPENING 02/07/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: ANTHONY DE ANDA DATE OF THIS ESTIMATE 06/15/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 84,608.40 84,608.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 84,608.40 84,608.40 033 MOBILIZATION LS 52,774.5000 52,774.50 0.750 39,580.88 0.750 39,580.88 ORIGINAL CONTRACT AMOUNT 528,528.00 TOTAL WORK COMPLETED 124,189.28 124,189.28 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 124,189.28 124,189.28 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/22/12 80 04/06/12 04/06/12 08/17/12 40 14 0 0 23% 50% PROGRESS IS SATISFACTORY PROGRESS IS SATISFACTORY *** SUSPENDED ON 04/06/12. ANTHONY DE ANDA RESIDENT ENGINEER PROGRAM CAS145 DATE 06/15/12