PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/21/14 EST. NO.02 TIME 02:06 PM R.E. NAME: FARSHAD KESHAVARZI 05-1A3804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/21/14 EST. NO.02 TIME 02:06 PM R.E. NAME: FARSHAD KESHAVARZI 05-1A3804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A3804 TIME 02:06 PM ESTIMATE NO. 02 BID OPENING 03/26/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/14 R.E. NAME: FARSHAD KESHAVARZI DATE OF THIS ESTIMATE 10/21/14 LOCATION PROGRESS ESTIMATE 05-SCR-152-R2.0/8.3 ----------------- O'GRADY PAVING INC IN SANTA CRUZ COUNTY NEAR 2513 WYANDOTTE ST. WATSONVILLE FROM HOLOHAN ROAD TO MOUNTAIN VIEW CA 94043 SANTA CLARA COUNTY LINE FED. AID NO. N O N E RHMA OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.900 4,500 003 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.060 3,000.00 0.120 6,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,000.0000 3,000.00 0.060 180 005 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.060 240.00 0.120 480 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.750 750 007 TREATED WOOD WASTE LB 0.2500 8,200.00 0.000 0 008 REMOVE GUARDRAIL LF 4.5000 9,900.00 0.000 0 009 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2700 14,715.00 0.000 0 010 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 660.00 0.000 0 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.6500 43,725.00 2,294.000 3,785 012 SHOULDER BACKING TON 91.0000 33,670.00 0.000 0 013 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,500.0000 1,500.00 0.000 0 014 PREPAVING INERTIAL PROFILER LS 4,000.0000 4,000.00 0.500 2,000 015 PREPAVING GRINDING DAY EA 6,000.0000 18,000.00 2.000 12,000.00 3.000 18,000 016 HOT MIX ASPHALT, SUPERPAVE (TYPE A) TON 205.0000 65,600.00 309.000 63,345 017 RUBBERIZED HOT MIX ASPHALT, TON 139.0000 1,042,500.00 0.000 0 SUPERPAVE (GAP GRADED) 018 DATA CORE LS 4,000.0000 4,000.00 0.000 0 019 TACK COAT TON 1,000.0000 27,000.00 0.520 520 020 GUARD RAILING DELINEATOR EA 40.0000 720.00 0.000 0 021 MIDWEST GUARDRAIL SYSTEM (8' POST) LF 29.0000 63,800.00 0.000 0 022 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,500.0000 5,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A3804 TIME 02:06 PM ESTIMATE NO. 02 BID OPENING 03/26/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/14 R.E. NAME: FARSHAD KESHAVARZI DATE OF THIS ESTIMATE 10/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,300.0000 34,500.00 0.000 0 024 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3600 44,640.00 0.000 0 025 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 1,132.50 0.000 0 026 THERMOPLASTIC PAVEMENT MARKING SQFT 3.7500 5,512.50 0.000 0 027 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 204.00 0.000 0 (BROKEN 36-12) 028 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.7500 7,067.50 0.000 0 029 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,200.0000 1,200.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 030 MODIFY SIGNAL LS 10,000.0000 10,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/21/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 05-1A3804 TIME 02:06 PM ESTIMATE NO. 02 BID OPENING 03/26/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/14 R.E. NAME: FARSHAD KESHAVARZI DATE OF THIS ESTIMATE 10/21/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 15,240.00 101,560.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 15,240.00 101,560.10 ORIGINAL CONTRACT AMOUNT 1,512,246.50 TOTAL WORK COMPLETED 15,240.00 101,560.10 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 15,240.00 101,560.10 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/23/14 45 07/07/14 07/07/14 10/20/14 79 84 0 0 7% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU SATISFACTORY FARSHAD KESHAVARZI RESIDENT ENGINEER PROGRAM CAS145 DATE 10/21/14